ML18143A958

From kanterella
Jump to navigation Jump to search
Letter Concerning Inspection of Hydraulic Shock Absorbers (Snubbers) R. E. Ginna Nuclear Power Plant Unit No. 1
ML18143A958
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/11/1976
From: White L
Rochester Gas & Electric Corp
To: Goller K
Office of Nuclear Reactor Regulation
References
Download: ML18143A958 (4)


Text

NRC FORM 195

. N LE E

L TORY C

'S Ia.7B) g ~

NRC DTSl RIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-244 FILE NUMBER TO: 'RC FROM:

RG&E Rochester, N.Y, 14649 L,D, White, Jr, DATE OF DOCUMENT 6 11 76 DATE RECEIVED 6-15 76 ALE TTE R CkORIGINAL Q COPY ONOTORIZED XSVNCLASSIFIE D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1 signed DEscRI~TIoN Ltr re our 10-1-73 1%.furn result of inspection of hydralic shock absorber (snubbers) at the R.E. Ginna Plant.

~ ~.

ENCLOSURE PLANT NAME:

R,E, Ginna Plant gQW5~

SAFETY ASSIGNED AD:

BRANCH CHIEF:

PROJECT MANAGER:

LIC~ ASST.:

FOR ACTION/INFORMATION ASSI NED DE PRO NA ~

C D

INTERNALDISTR I BUTION SYSTEMS SAFETY SITE SA R~D I &E OELD GOSSICK & STAFF MIPC CASE HANAUER A

E SCHROEDER ENGINEERING MACCARRY KNIGHT SIHWEIL PAWLICKI BENAROYA IPPOLITO K RKW 0 OPERATING REACTO S

ENV 0

NA DE PROJECT MANA EhIEN BOYD P

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT LPDR:

TIC:

N

~

ASLB ~

ACRS CYS REACTOR SAFE'ZY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB REG. VIE LA PDR CONSULTANTS EN'

~

~

OPERAT N

EISENH SHAD BARR BUTLER GRIMES BROOKHAVEN N ULRIKSON ORNL CONTROL NUMBER 6095

~'

v

~

~

MP

~ 1v-

~ ~ ~

~ ~ ~ ~

~

~

~

~

Ii /8(Zi$(IS 8'~l/fZI

'illi~ iiiiiiiiliii iiigiiiiii ROCHESTER GAS AND ELE Iegulator Docket File L! SSASC PORATION 0

89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.

VICE PRESIDENT l

-.a78> -,

~0~- 'une 11, 1976 TELEPSIONE AREA CODE TIII 546.2700 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller Assistant Director for Operating Reactors Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Ire"4~

S ~+~@ASI

~ +

E~

4,/(I-I.(.T ~

Subject:

Inspection of Hydraulic Shock Absorbers (Snubbers)

R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Goller:

In accordance with Mr. Skovholt's letter of October 1, 1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers),

an inspection of all snubbers both inside and outside of containment was com-pleted on May 28, 1976.

All snubbers were considered operable at this inspection.

No fluid additions were necessary.

Very'ruly yours,

/

L. D. Whit, Jr.

'6095

R V