ML18143A958
| ML18143A958 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/11/1976 |
| From: | White L Rochester Gas & Electric Corp |
| To: | Goller K Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18143A958 (4) | |
Text
. N LE E
L TORY C
'S Ia.7B) g ~
NRC DTSl RIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER 50-244 FILE NUMBER TO: 'RC FROM:
RG&E Rochester, N.Y, 14649 L,D, White, Jr, DATE OF DOCUMENT 6 11 76 DATE RECEIVED 6-15 76 ALE TTE R CkORIGINAL Q COPY ONOTORIZED XSVNCLASSIFIE D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1 signed DEscRI~TIoN Ltr re our 10-1-73 1%.furn result of inspection of hydralic shock absorber (snubbers) at the R.E. Ginna Plant.
~ ~.
ENCLOSURE PLANT NAME:
R,E, Ginna Plant gQW5~
SAFETY ASSIGNED AD:
BRANCH CHIEF:
PROJECT MANAGER:
LIC~ ASST.:
FOR ACTION/INFORMATION ASSI NED DE PRO NA ~
C D
INTERNALDISTR I BUTION SYSTEMS SAFETY SITE SA R~D I &E OELD GOSSICK & STAFF MIPC CASE HANAUER A
E SCHROEDER ENGINEERING MACCARRY KNIGHT SIHWEIL PAWLICKI BENAROYA IPPOLITO K RKW 0 OPERATING REACTO S
ENV 0
NA DE PROJECT MANA EhIEN BOYD P
COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT LPDR:
TIC:
N
~
ASLB ~
ACRS CYS REACTOR SAFE'ZY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB REG. VIE LA PDR CONSULTANTS EN'
~
~
OPERAT N
EISENH SHAD BARR BUTLER GRIMES BROOKHAVEN N ULRIKSON ORNL CONTROL NUMBER 6095
~'
v
~
~
~ 1v-
~ ~ ~
~ ~ ~ ~
~
~
~
~
Ii /8(Zi$(IS 8'~l/fZI
'illi~ iiiiiiiiliii iiigiiiiii ROCHESTER GAS AND ELE Iegulator Docket File L! SSASC PORATION 0
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT l
-.a78> -,
~0~- 'une 11, 1976 TELEPSIONE AREA CODE TIII 546.2700 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller Assistant Director for Operating Reactors Division of Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Ire"4~
S ~+~@ASI
~ +
E~
4,/(I-I.(.T ~
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1, 1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers both inside and outside of containment was com-pleted on May 28, 1976.
All snubbers were considered operable at this inspection.
No fluid additions were necessary.
Very'ruly yours,
/
L. D. Whit, Jr.
'6095
R V