NRC FORM 195 I2 76)
I'
~
~
U.S. NUCLLAR REGULATORYCOMI~ION I
NRC DISTBlMJTION'FOR PART 50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER TO:, Mr Goller FROM:
Rochester Gas 6 Elec Corp Rochester, NY E, 5 White DATE OF DOCUMENT 8-3-76'ATE RECEIVED 8 6 76 LETTER
+OR I G INAL QCOPV DESCRIPTION C3 NOTO R IZE D PRINCLASSIFIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED one.signed Ltr re= our. 10-1-73 1tr..... furnishing repor
~. of inspection of hydraulic snubbers for
'he p'eriod ending 7-7-76...'.;
PLANT NAME:
SAFETY SSIGNED AD:
RANCH CHIEF:
ROJECT MNAGER:
LIC ASSTo:
S~
ay PROTE N
~
FOR ACTION/INFORMATION ASSX NED AD Z,
NRC PDR XbcE OELD GOSSICK 6 STAFF MIPC CASE HANAUER HARLES INTERNAL0 SYSTEMS 'SAFETY HEINE'AN SCHROEDER ENGINEERING MACCARRY KNXGHT SIHWEIL PAWLICKI ISTRl BUTION YS BENAROYA XPPOLITO K RIQCOOD OPERATING REACTORS SITE SA F.NV 0
N PROJECT MANAGEMEN BOYD P
COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT LPDR: t-TXCi c
N$
~
ASLB:
ACRS CYS
%6BBXNG EN NRC FORM 19$ I2.20)
REACTOR SAFE'IIY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZHAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB:
REGS VIE LA PDR CONSULTANTS OPERA N
EISENH SHAO BAER GRIMES BROOKIIAVEN N ULRIKSON ORNL
'S A
CONTROL NUMBER
3zoqez g~aid~iaxuR
...zdf fV-L-01 basso
~>> ~J aoR asodcfvaa aiLvrvbqirf 2n noi3ooqerri
....,07-'C-7 goibniu hcZxori ~rl-.
( /I/i/'Ijij/
Ij/IIVl'""'"'j//zjijiii(xiii/giiiiiiiiiiii Zil/Ill
/ i'JIII'ii'/III saw LNIllhfiAQ VOEE I
I'jEEEC ROCH ES TER GAS AND ELEC TRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT TELEPHONE
- RE*COOK 710 546.2700 August 3, 1976 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller Assistant Director for Operating Reactors Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1, 1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers both inside and outside of containment was completed on July 7, 1976.
All snubbers were considered operable at this inspection.
A small amount of fluid was added to one non-safety related Bergen-Paterson unit outside of containment.
On July 22, 1976 an inspection of all snubbers outside of contain-ment was completed.
Allunits were considered operable.
Fluid was added to the same non-safety related unit as during the previous inspection.
Leakage was observed at the shaft seal.
This unit willbe kept under more frequent surveillance and willbe replaced at the next convenient opportunity.
~I R
Very truly yours,
/
L. D. Whi e, Jr.