Plant Personnel Changes
ML18143A444
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/02/1978
From: White L
Rochester Gas & Electric Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
References
Download: ML18143A444 (6)


Text

~~Qi t~v t

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-204 REC:

DENTON l.l R NRC ORG:

WHITE L D ROCHESTER GAS Z. ELEC DOCDATE: 08/02/78 DATE RCVD: 08/07/78 DOCTYPE: 'LETTER NOTARIZED:

NQ COPIES RECEIVED

SUBJECT:

~

QAR<e,~g LTR 1

ENCL 0 FURNISI-IING INFO CONCERNING VANITY OF PERSONNEL CHANGES AFFECTING SUBJECT FACILITY AS OF 07/12/78.

PLANT NAME: RE GINWA UNIT 1

REVIEWER INITIAL: "

XJM DISTRIBUTOR I N IT I AL:

DISTRIBUTION OF Tl-lrS MATERIAI IS AS FOLLOWS CHANGES OF PERSONNEL/ADDRESS (DISTRIBUTION CODE M006>

FQR ACTroN:

INTERNAL:

EXTERNAL:

ASST DIR a GRIMES~~LTR oNLY(1>

PROJ MGR SHEA~~LTR ONLY(1)

ATE@

TR ONLY(i) 8.

E~~+LTR ONLY(2)

MIPC++LTR ONLY<i)

AhLAP~~~~LTR ONLY(i)

H SMITH~~LTR ONLY< 1)

DSB-L SCHWEII3ER+%LTR ONLY(1>

LPDR~S ROCHESTERr NYss+LTR ONLY< 1 )

ACRS CAT BN4~LTR ONLY(1 BR CHIEF ORBN2 BC~+LTR ONLY(1>

LIC ASST ORBI2 LA<<LTR ONLY< 1)

NRC PDR4+LTR ONLY<i)

OELD~+LTR ONLY(i>

ASLB~+LTR ONLY< 1)

H GEARIN++LTR ONLY(i>

C.

STEPHENS+4LTR ONLY<i)

DISTRIBUTION:

LTR 18 ENCL 0 SI ZL:

2P CONTROL NBR'.

782220102

%%Sf %SHE 8fHl %%%%%%4I %% k0f %%%0f%%0f%8f cl %8I wl%%

THE END

'l 1',

's 1 ~

t 0

'I(

I" k

t 7

II II hA J

lg I

N a>

i'I 1

P' I

N 1

/if///I

/////i///

wit( in'iwu ROCHESTER GAS AND ELECTRIC CORPORATION i, 'BOA/I 1'i"IIAIE o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.

VICE PRESIDENT TELEPHONE AREA CODE Tld 546-2700 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 August 2, 1978

//..a.iI 7;.n O (JI~

R TTI I

If l,'

f11 QJ

~C'

Subject:

Plant personnel changes R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244

Dear Mr. Denton:

This is to confirm in writing the following personnel changes affect-ing our Ginna facility as of July 12, 1978.

Mr. Lee S. Lang has been appointed Superintendent of Nuclear Pro-duction.

Mr. Lang was formerly Plant Superintendent.

At the plant, with the promotion of Mr. Lang to the corporate offices, the following changes were made:

Mr. Bruce A. Snow has been appointed Plant Superintendent.

Mr.

Snow was formerly Assistant Superintendent.

Mr. john C. Noon has been appointed Assistant Superintendent.

Mr. Noon was formerly Maintenance Engineer.

Mr. Stanley M. Spector has been appointed Maintenance Engineer.

Mr. Spector was formerly a member of the plant engineering staff.

Mr. Charles V. Hartlieb,. the Results and Test Engineer, has retired as of June 1, 1978.

Mr. Giuseppe P. Larizza has been appointed,to a newly created position of Technical Engineer.

Mr. Larizza willhave responsibility for both the nuclear engineering and the Results and Test areas.

Mr. Thomas A. Meyer has been appointed the Nuclear Engineer.

Mr. Meyer was formerly a member of the plant operations staff.

78222O102

0 r

d ll II

'l 0

h S

f

ROCHESTER GAS AND ELE RIC CORP.

DATE'ugust 2, 1978 Mr. Harold R. Denton, Director SHEET NO.

2 In addition to these changes Mr. Noon willreplace Mr. Lang as a plant representative on the offsite Nuclear Safety Audit and Review Board.

Mr. Lang has been appointed a member of the offsite board.

A proposal for the change of the affected Plant Technical Specifica-tions will be submitted later.

Very truly yours, cc:

Mr. Boyce H. Grier, Region I Mr. Paul P. Collins

Pal t

A 1