Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML22234A1692022-08-22022 August 2022 R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. ML22124A3162022-05-27027 May 2022 Summary of Combined Regulatory Audit in Support of Risk Informed Completion Times in Technical Specifications LAR and to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ML22108A2482022-04-18018 April 2022 R.E.. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML22052A0132022-02-21021 February 2022 Application to Revise R. E. Ginna Technical Specification 3.1.8, Physics Tests Exception - Mode 2 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments ML21287A0062021-10-14014 October 2021 Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21140A3242021-05-20020 May 2021 R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21141A0092021-05-20020 May 2021 R. E. Ginna Nuclear Power Plant - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments ML20056E9582020-02-25025 February 2020 R. E. Ginna Nuclear Power Plant, License Amendment Request to Add a One-Time Note for Use of Alternate Residual Heat Removal Methods RS-20-002, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-02-0606 February 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19045A2822019-02-15015 February 2019 R. E. Ginna Nuclear Power Plant - License Amendment Request (LAR) to Revise Technical Specification (TS) 5.5.15, Containment Leakage Rate Testing Program, for Permanent Extension of Type a Leak Rate Test Frequencies ML18158A1292018-06-0505 June 2018 License Amendment Request: Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)2018-03-0101 March 2018 Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) ML17321A1072017-11-16016 November 2017 R. E. Ginna, License Amendment Request to Revise Technical Specifications for Selected Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Channels to Incorporate Bypass Test Capability ML17304A9842017-10-31031 October 2017 R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications Surveillance Requirement SR 3.8.4.3, DC Sources - Modes 1, 2, 3, and 4, to Allow for a Modified Performance Discharge Test ML17186A2332017-06-30030 June 2017 License Amendment Request - Revised Commitment Associated with Implementation of NFPA 805, 2001 Edition ML17164A1482017-05-31031 May 2017 Enclosure 3C - EAL Basis Document for R.E. Ginna Nuclear Power Station ML17164A1502017-05-31031 May 2017 Enclosure 3D - EAL Front Matter for R.E. Ginna Nuclear Power Station ML17164A1512017-05-31031 May 2017 Enclosure 3E - Procedure Matrix for R.E. Ginna Nuclear Power Station ML17164A1472017-05-31031 May 2017 Enclosure 3B - EAL Red-Line Basis Document for R.E. Ginna Nuclear Power Station RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process2017-03-28028 March 2017 Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process ML16280A4022016-10-0606 October 2016 License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16236A3002016-08-22022 August 2016 License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML16168A2612016-06-16016 June 2016 Supplement No. 2 to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Rev. 3).... ML16035A0152016-02-0404 February 2016 Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. ML15210A3142015-07-29029 July 2015 License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15166A0752015-06-0404 June 2015 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) RA-14-057, License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 82014-08-29029 August 2014 License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8 ML13228A2652013-08-14014 August 2013 Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment Request ML13232A1562013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2 ML13093A0642013-03-28028 March 2013 License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML11138A1592011-05-12012 May 2011 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R.E. Ginna, Application for Approval of Indirect Transfer of Control of Licenses ML1020404732010-07-16016 July 2010 R. E. Ginna - Request for Approval of the Constellation Energy Nuclear Group Cyber Security Plan ML0926800602009-09-18018 September 2009 R. E. Ginna - License Amendment Request: Administrative Revision of Inservice Test Program Technical Specification ML0920905382009-07-23023 July 2009 R. E. Ginna - License Amendment Request: Improvement to the Definition of Operations Involving Positive Reactivity Changes (TSTF-286) ML0908901912009-03-23023 March 2009 R. E. Ginna - License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions for TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0906304262009-02-26026 February 2009 R. E. Ginna and Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation - Supplement to Application for an Order Approving License Transfers and Conforming License Amendment Request ML0835308062009-02-23023 February 2009 R. E. Ginna Nuclear Power Plant - Amendment Re Revised Methodology for Determining Reactor Coolant System Pressure and Temperature and Low Temperature Over-Pressure Limits ML0903302752009-01-22022 January 2009 R. E. Ginna - Amendment to Application to Revise Technical Specification Limiting Conditions of Operation (Lcos) 3.3.2, 3.3.4, and 3.8.1 2024-04-12
[Table view] |
Text
LAW Of f ICCR Of LCBOCUF. LAMB.LLtDY es MACRAE I7S7 N STALL'T. NYZ WAGHIHGToN.O. C4003G ARVIN C, UPSON IAO 04>A >>AT LCONARO M.1ROOSCN hlw 404>> w + ~ 00r
'lBILLIAM O OOU4I CUU C I C tl ~ S NO MAO ~ UR January 30, 1976 WASHINCIO>>r CI CA 04C MARI T N QOI>>OT t02 ~ 0 >C. >>C.C B L HAIININO MUN'IZ4NG LCK K. LARSON CABIC AO ACSS Iltki T V. hlCIICL
~
IALAIU,WAS~>>IU>>0 SCLCI A ~ tt>>
C
~ AS>>>> ~ I>> AAAIAIAS Hr. Ben C. Rusche Director C >>ll. 'C4 City>>l, 4 Office of Nuclear Reactor Regulati U.S. Nuclear Regulatory Commi sion +
D.C. 20555 4 ~ C.ashington, Re: Rochester Gas and L'lectric Corporation R. E. Ginna Nuclear Power Plant, ~".tit No. 1 Docket No. 50-244
Dear Hr. Rusche:
Transm.'tted herewith are three (3) signed originals and hrenty-five (25) copies of Rochester Gas and L'lcctric Corpo ation's Amendment No. 7 to tlpplication to Convert Provxsaora3. Operatirg License to Full-Term Operat-ing License together with .,cvcnty (70) copies of Revision 3 to Supplement XV to Applicant's Tcchnical Supplement Ac-companying Application for a Pull-Term Operating License.
Revision 3 further revises Supplement IV, filed with tne Commiss'on on July 1, 1974 anti revision to thc Su?~plcment, filed August 23, 1974 and November 1, 1974. These furthe revi ions to Supplement IV reflect the addition of three organizations in thc Company which have been assigned responsibilities for control of quality-related activities and the reclari.fication of terms and re p nsibilities made necessary by the implementation of Pevision 2 to Supp'ement IV.
A Certificate of Service showirg service of these aocuments upon the person listed therein i.s enclose-.
Very truly yours,
( / a'f JI / 'I>>~iL All. L r' r /(I I~
LeBocuf, Larllb, Lciby & 11acRac Attox'ncys for Rochester Gas and ?Slcctric Corporation hOXICZ .II
,(,'I 'l, lr PORITPIS 0.. ILATS PCFO.". 'w= ItkzcnTorL. Zt g (
!:a:; t 0:i r:;Coda".Odl nroa L'0 b.*st ..Yal "tblo n-4 COPY LO Ocr L ChO brOOdnRt IInRII 4'A) 4 nlr44 1 A;L. iP il Il'
)4 i 1
/ ~ W E P 4P 4
~ ~
N BJ:I ORE TJJJ: UHITED STATJB liUCLEAJ< RJ:GI:ueZORY Cou W JSSION In the Matter of )
)
JtOCJIESTER GAS AJ~O ELECTRIC ) Docket No. 50-244 CORPDJJATION (R. E. Ginna )
Nuclear Poorer Plant )
V>>it I'o. 1) )
AViJ:NDViE!iTNO. 7 TO APJ'LICATION TO CONVER'I'RGVISICNAL 01'EPATIJxG J.JCJ:NSJ'. TO FU J.L-TJ:P! OPERXYI!iG I.ICE!'SE J
Rochester Gas and Electric Corporation, Applic<int in the above-captioned proceeding, hereby file.". Amendment No. 7 to its Application to Convert Provi ional Opera'.ing License to I'ull-Term Opr rating License. This amendment transmits Revision 3 to Supplement 1V to Applicant's Technical Supplement Accompanying Application for a Full-Term Operating License. Revision 3 further r vi es Supp!ament JV, filed w'th ti:e Ccmmission cn July 1, 1974 and revisions to the Supplement, filed August 23, 1974, and November 1, 1974 respectively.
I Thcs= further revi ions to Supplement IV reflect the addition of three organization in the Company v:hich have been as" igncd respo:isibilities for control of quality-related activities and the reclarification of terms and respon.,ibilities made necessary by the implcmcntation of th prcvio is Revision to Supplement PI.
Will:RL'I'ORL', hppllcant pray a in its origi>>ul application.
I<QCHI:S'I'I:It CPS h>lL> I:I.IX:TftIC COIO'OINTIOI!
Idion D. Whito, jr.,tJ Yice Piosident Electric a>>d Stcar~ Production Subscribed and sv>orn to beforo me this ~~ "cay of January jly.".t.rent Notary Public t:>>@note G. c i.'y c.vn:".::'i t> p'.tc l"..:ta ~). I9,:.~
~ ~
INSTRUCTIONS FOR CHANGE Revision 3 to Supple."ent IV is substantial since additional organizations are be=ng included in the program; therefore, the co~piete revised document is being distributed rather than just the cha.".'ge pages. Pages which have been revised are listed below and are marked as Revision 3 in the lower r'ght hand corner of the revised pago. Changes on the pages are -arked with vertical lines in the left hand margin.
Replace Supplement IV 'n its entirety with this revision.
Place this instruction sheet behind Instruction Sheet 2.
CG'.a ENTS OF REVISION Cover Page ZV-2O~ IV-4 3A+
IV-vA IV-20A~ IV-44 ~
IV-v'v-vi IV-21< Iv-44~
i~ IV-21A ~ Iv-45~
IV-1 p IV-22 IV-45A IV-2 ~ IV-23 zv-46<
IV-aB Iv-5P
/ IV-25'V-26
~
Iv-4 7/
Iv-48 Zv-5A~ ZV-27~ Iv-51 IV-7r IV-28 IV-53 Iv-8 ZV-29~ Iv-5F~
IV-9 Zv-30 IV-56 IV-9A Iv-30A Iv-57 IV-10~ ZV-31+ ZV-59~
IV-11 IV-32+ IV-60 through IV-73A IV-12 IV-33'v-35 IV-74A through IV-74C ZV-12A< IV-75A through IV-75I IV-12B IV-35A IV-76A through IV-76D ~
IV-13 Iv-37 IV>>77 zv-14 IV-.37A~
IV-15~ Zv-38~ Iv-78/'v-78'v-79'V-8O6 zv-16 zv-ao IV-16A .
IV a i~
IV-17+ Iv-alA- zv-81 P IV-18 IV-42 ~ ZV-82>
IV-19 IV-43> zv-84+
Instructions - 3 Revision 3 February 1, 1976
r 14S'RUC IObi'S FOR aiAKINi'G PAGE C)VsoeGES
=he follovinr. is a .listing of material furnished as Revision 1 to serve as a check list for entering net pages. Enter the net pages as listed, discarding any superseded material.
File this instruction sheet in the front of Supplement IV as a record of change.
CO.". E.':.S aF REVISIO:i IV-i IV-vi IV-ii IV-vi1 IV-iii IV-4A IV-vi IV-~1k IV-v IV- eC Instructions 1 P vision 1 August 1974
ZtlSTRUCTIONS FOR Cl)ANGE Pevision 2 to Supplement IV is substantial due to organ>>
izational changes; therefore, the complete revised document is being distributed rather than just the change pages.
Pages which have been revised areelisted below and are markec! as Pevision 2 in the lower right hand corner of the revi ed page. Changes on the pages are marked with vertical lines in the left hand margin.
Peplace Supplement XV in its entirety with this revision.
Place this instruction sheet behind Instruction Sheet l.
CO.'!TK'.iTS OF PFVIS IO."I Cover Page IV-19 XV-46 IV-v IV-20 IV-47 IV-vA ZY-21 IV-48 IV-vii XV-22 IV-49 IV-1 IV-23 IV-50 IV-2 ZV-24 IV-51 IV-3 IV-25 XV-52 IV-49 EV-26 IV-53 IV-5 IU-27 IV-54 IV-6 IY-30 XV-55 IY-7 IV-31 IV-56 IV-9 IV-33 ZV-57 ZV-9i~ IV-34 IV-58 IV-12 I'V-35 ZV-77 IY-13 IY-38 IV-78 V-14 IY-39 IV-79 IY-15 IV-42 IV<<30 IV-16 XV-43 IY-83 IY-17 IV-44 IV-18 IV 45 Instructions 2 Revision 2 November 1, 1974'