NHC r onM 199 (2r76 I U.S.'NUCLEAR REGULATORV COMMI Slof'I r
DOCKET NUMBER 50-244 NRC DISTRIBUTION FoR PART 50 DOCI(ET MATERIAL FILE NUMBER fLFTTER ORIGINAL CIcoPv DESCRIPTION ONOTORIZED QfVN C LASS I F I E D TO:g Mr. Karl Goller PROP INPUT FORM ENCLOSURE FROIVI:
Rochester Gas
& Electric Company Rochester, New York L. D. White, Jr.
DATE OF DOCUMENT 2/23/77' DATE RECEIVED 2/28/77 NUMBER OF COPIES RECEIVED One si ned Ltr. re our 10/1/73 ltr....concerning inspection of hydraulic shock, absorbers (snubbers).........
DO NOT REMgr@I PLANT NAME R. E. Ginna No.
1
,5CN03VLEDGED SAFETY ASSIGNED AD:
~JiIEwu LXC ASST Wambach She ard FOR ACTION/INFORMATION r
3 2
RANCELC
~
PROJECT MANAGER:
LXC ASST INTERNALDISTR I BUTION R
~
RC PDR OELD GOSSXCK & STAFF MXPC CASE HANAUER lfARLESS PROJECT MANAGEMENT BOYD
- r. C01.1.INS HOUSTON PETERSON hfELTZ HELTFMES SKOVHOLT PIER ~ L ons N Y LPDRo TXC:
NSXC:
ASLB:
ACRS CYS
%61:9%86/
E SYSTEMS SAFETY HEXNEMAN SCHROEDER ENGINEERING hfACARRY BOSNAI<
SIEiiKIL rAWL CK REACTOR SAFE ROSS NOVAK ROSZTOCZY CHECK AT & I SALTZMAN RUTBHRG EXTERNAL DISTRIBUTION NAT LAB REG V,XE LA rDR CONS ANTS:
PLANT SYSTE1fS TEDESCO oolKA IPP01 ITO OPERATING REACTORS STELLO OPERATXNG TECH EISENHUT B
E Q1G 0ES BLOOQIMEKJJAX~Bo SXTS SASS+~{j 0
7 ERNST BALLARD SPANGLER SITE TECH GAhBfILL STEPP HULhfAN SITE ANALYSIS VOLL1fER BUNCH J
COLLINS KREGER CONTROL NUMBER
/d'OQ NRC FOIIM 196 (2.76)
A l
li A
r a
F I
~ 4 ~ t ~
A(
r
~
1 A 0 1 0 4 4 I
~
0
'I 4
0
~
Illf(58$ 'liaÃ/
'0
)
AH S zspysir zznmz Ius~isidikl uzsizu ROCHESTER GAS AND H
s I
J>>
IIA'N ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR.
VICE PRESIDENT TELEPHONE AREA CODE 7IS 546-2700
-NEIJLUMP Ilgwu(<I rLg I,gr."]
February 23, 1977 Director of Nuclear Reactor Regulation ATTN: Mr. Karl Goller Assistant Director for Operating Reactors Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Inspection of Hydraulic Shock Absorbers (Snubbers)
R. E. Ginna Nuclear Power Plant, Unit No.
1 Docket No. 50-244
Dear Mr. Goller:
In accordance with Mr. Skovholt's letter of October 1, 1973, con-cerning periodic inspection of hydraulic shock absorbers (snubbers),
an inspection of all snubbers both inside and outside of containment was completed on February 3, 1977.
All snubbers were considered operable at this inspection.
Very truly yours,
~
~
~
S Jl L. D. White, Jr.
@44