(BISTRIBUTION AFTER ISSUANCE OF OP TING LICENSE NRC FORM 195 U.S. NUCLEAR REGULATORY COMMI t2-7/I.4'RC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMBER FILE NUMBER TO."
Mr. A Schwencer FROM:
Rochester Gas 8c Electric Company Rochester, New York L. D. White, Jr.
DATE OF DOCUMENT 12/19/77 DATE RECEIVED 12/27/77 ETTE R
@ORIGINAL C1 COP Y DESCRIPTION CINOTORI2ED UNCLASSIFIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED Consists bf request for relief re restrictions concerning system pressure tests at Ginna Stationi ~ ~ ~ ~
(].-P.)
PLANT ~i:
Ginna Unit No, 1
~ RJL 12/29/77'AFETY BRANCH CHIEF:
7 FOR ACTION/INFORMATION S
Ie>C I
EG F INTERNAL0 RIBUTION IST PDR:
EXTERNALDISTRIBUTION CONTROL NUMBER ASA tg 773460075
P c
lf
/ II5IIIIII 'IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE, JR.
VICE PRESIDENT QQ c
. ~ I c ~ II 5
> TELEPHONE AREA COOE I 155 546.2700 December 19, 1977 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Operating Reactors Branch No.
1 U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Schwencex:
On February 8, 1977, Rochester Gas and Electric Corporation submitted Revision 2 of the "Ginna Station Insexvice Inspection Program for the 1977-1979 Period" which was approved by the Nuclear Regulatory Commission as documented in your letter of May 17, 1977.
In our Inservice Inspection
- Program, Revision 2, the holding time at pressure for system pressure test was specified as four (4) hours in accordance with the requirements of the 1974 Edition through Summer 1975 Addenda of Section XI to the ASME Boiler and Pressure Vessel Code; Article IWA-5000, para-graph IWA-5210.
Since that time the 1977 Edition of Section XI to the Code (Article IWA-5000, paragraph IWA-5210) has clarified the length of holding time for exposed areas of systems to a ten (10) minute holding time, with the four (4) hour requirement remaining for unexposed systems.
This letter is to request that the Nuclear Regulatory Commission grant Rochester Gas and Electric Corporation relief from the four (4) hour holding time for all systems, so that.
exposed systems may be pressurized for the ten (10) minute perio'd as specified in latter editions of the Code.
This relief will allow Rochester Gas and Electric Corporation to conduct system pressure test at Ginna Station in a more efficient manner and still meet acceptable Code criteria.
This relief would not result in any decrease in the effectiveness of the Inservice Inspection Program nor result in any unreviewed safety question.
Very truly yours, L. D. White, Jr.