Responds to Violations Noted in Insp Repts 50-338/84-19 & 50-339/84-19.Significant Progress Made Toward Achieving 850331 Completion Date for Rev to Procedures Used by Control Operations Group for Testing Activities
ML18142A569
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 03/29/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
475A, NUDOCS 8507230345
Download: ML18142A569 (2)


Text

~-

WiLU4ML STEWART Vice President Nuclear Operations cc. f'\\)R 9

\\.)J

.\\

I\\

0

\\

  • *':),,,

.; *Li Nuclear Operations Department Post Office Box 26666 One James River Plaza Richmond, Virginia 23261 March 29, 1985 Dr. J. Nelson Grace Regional Administrator Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

VIRGINIA POWER Serial No: 475A NO/sbe: cfm r::_--::-~=~..

Docket nos.

~-280 I 5 (r-'2'81"j 50-338 50-339 License nos.

DPR-32 DPR-37 NPF-4 NPF-7 In our letter of September 7, 1984, which was in response to a notice of violation on IE Inspection Report Nos.

50-338/84-19 and 50-339/84-19, we stated that the expected completion date for the revision to the procedures used by the Control Operations Group for testing activities at North Anna and Surry Power Stations was March 31, 1985. Since that time, significant progress has been made toward achieving this goal.

For North Anna Power Station the revision to the procedures have been completed by the Control Operations Personnel to include the items referred to in the violation response. These procedures are now in the review process and are expected to be completed by April 30, 1985. To date 180 out of 228 procedure revisions have been reviewed and approved for implementation.

For Surry Power Station the revisions to the procedures have been completed, and are now in the final review, approval and implementa-tion process.

To date, 104 of 177 procedures have been approved, and the remaining procedures will be approved prior to implementation.

In order that the review and approval process may be completed in a thorough and quality manner, an extension until May 31, 1985 is required.

&.i(f~"J W. L. Stewart

cc:

Mr. Roger D. Walker, Director Division of Reactor Projects Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. M. W. Branch NRG Resident Inspector North Anna Power Station Mr. D. J. Burke NRG Resident Inspector Surry Power Station