ML18142A473

From kanterella
Jump to navigation Jump to search
Requests Addl Time to Review Issues & Records Re Implementation Plan for Generic Ltr 83-28,per NRC 850313 Request for Addl Info.Proposed Changes to Tech Specs Anticipated
ML18142A473
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/19/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
85-211A, GL-83-28, NUDOCS 8506250132
Download: ML18142A473 (2)


Text

(

I L W'lll.lAML STEWART Vice President

-Nuclear OperaJioiis- - --- - ---

June 19, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

VIRGINIA POWER

---=-=.:....-==-----"" --

e Nuclear Opemtions Department Post Office Box 26666 One James River Plaza Richmond, Virginia 23261 VIRGINIA POWER 85-211A Serial No.

NO/EJL:dn Docket Nos.

50-280 50-281 License Nos. DPR-32 DPR-37 SURRY STATION UNIT NOS. 1 and 2 GENERIC LETTER 83-28 ITEM 4.5.3 REQUEST FOR ADDITIONAL INFORMATION BY THE NRC Your letter of March 13, 1985 requested that we submit a description of the specific implementation plan for Generic Letter 83-28 Item 4.5.3 for Surry Units 1 and 2. Subsequent to receiving your letter we have reviewed topical report WCAP-10271 (Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection Instrumentation System),

WCAP-10271 Supplement 1, the Westinghouse guidelines for proposed changes to the Technical Specifications, and the NRC letter dated February 21, 1985, accepting for referencing the licensing topical report WCAP-10271.

As discussed with Mr. D.

Neighbors of your staff on June 5, 1985, and again on June 10, 1985, additional time is required to thoroughly review and analyze the issues and associated station surveillance records as a basis for any changes.

We are continuing our evaluations and currently anticipate proposing changes to the Technical Specifications.

Our schedule is to send you a description of our specific plans by August 30, 1985. If you have any questions, please contact us.

Very truly yours,

~ij~-t1

"'t; W. L. Stewart 8506250132 850619 --~

PDR ADOCK 05000280 p

PDR

cc:

Dr. J. Nelson Grace Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station

--- -,-----~

e VIRGINIA POWER