Application for Amend to License DPR-37,changing Tech Specs 4.17.A & B to Postpone Visual Insp of Snubbers from Jan 1985 to 10-yr Inservice Insp Outage Beginning on 850322,to Prevent Unnecessary Personnel Exposure
ML18142A256
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/04/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18142A257 List:
References
761, NUDOCS 8501100192
Download: ML18142A256 (3)


Text

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NucLEAR OPERATIONS January 4, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Serial No. 761 NO/JDH:acm Docket No. 50-281 License No. DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO. 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License No. DPR-37 for Surry Power Station Unit No. 2.

Technical Specification 4.17.A specifies the visual inspection interval for shock suppressors (snubbers); 4.17. B specifies the acceptance criteria for visual inspections.

Based on inspection results during the last visual snubber inspection, conducted November 9-17,

1984, the next inspection interval was determined to be 62 days+/- 25 percent, or no later than February 1, 1985.

Because inspection of all snubbers sufficient to satisfy the criteria in Specification 4.17.B cannot be conducted at power, Unit 2 must be shutdown for approximately.ten days in late January,

1985, to conduct the required inspection.

However, a major refueling and ten-year ISI inspection outage is scheduled to begin shortly thereafter on or about March 22, 1985.

During the refueling/ISI outage, visual and functional testing of the snubbers, as required by Technical Specification 4.17.C, will be performed.

Because these duplicate efforts, if conducted as presently scheduled, would result in unnecessary personnel exposure, we believe that a one-time change to Technical Specification 4.17.A is warranted.

The proposed Technical Specification changes are provided in Attachment 1.

A discussion of the proposed Technical Specifications is provided in Attachment

2.

The basis for the exigent request has been provided in Attachment 3.

In accordance with 10 CFR Part 170, an Application Fee of $150 is also enclosed.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this change does not pose an unreviewed safety question as defined in 10 CFR 50.59 and does not pose a significant hazards consideration as defined in 10 CFR 50.92.

8501100'192 850104 PDR ADOCK 05000281 P

PDR

e VIRGINIA ELECTRIC AND PowER COMPANY TO Mr. Harold R. Denton Because the proposed Technical Specification change has direct impact on our power generation capability for January - February, 1985, we would appreciate your prompt attention to this request and issuance of the change by February 1, 1985.

If you have any questions, or need additional information to process this request, please contact us immediately.

Attachments:

1.

Proposed Technical Specification Change

2.

Discussion of Proposed Changes

3.

Basis for Exigent Request

4.

Application Fee cc:

Mr. J, P. O'Reilly Regional Administrator NRC Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. C. Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. John Olshinski NRC Region II Very truly yours, l}_t. (LJ W. L. Stewart

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.

L. Stewart who is Vice President -

Nuclear Operations, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this My Commission expires:

(SEAL)

S/001 a

i day of?~

.2.. -

.)--<{,

, 19

9 'i.,