MONTHYEARML19238A2192019-08-26026 August 2019 Tva'S Post-Hearing Supplemental Information ML19214A2472019-08-0202 August 2019 Tennessee Valley Authority'S Amended Witness List ML19207A6992019-07-26026 July 2019 TVA Pre-Filed Testimony (Including Certification of Daniel Stout) ML19207A7002019-07-26026 July 2019 TVA Curriculum Vitae of Daniel Stout ML19207A7032019-07-26026 July 2019 TVA Responses to Pre-Hearing Questions ML19207A7042019-07-26026 July 2019 TVA Witness List ML19197A2842019-07-16016 July 2019 Notice of Appearance of David A. Codevilla ML18271A0252018-09-28028 September 2018 Notice of Withdrawal of Blake J. Nelson ML18271A0242018-09-28028 September 2018 Notice of Appearance of Ryan C. Dreke ML18174A0752018-06-22022 June 2018 Intervenors' Reply to Responses in Opposition to Motion for Leave to File Contentions 4 and 5 ML18166A3362018-06-15015 June 2018 Tennesee Valley Authority'S Answer Opposing Intervenors' Motion for Leave to File Contention 4 and Contention 5 ML18163A4362018-06-12012 June 2018 Intervenors' Response to Motions to Dismiss Contention 2 as Moot ML18163A4402018-06-12012 June 2018 Intervenors' Unopposed Motion to Establish June 22, 2018 as a Fixed Deadline for Filing a Single Reply to Responses to Intervenors' Motion to Admit New Contentions 4 and 5 ML18162A2132018-06-11011 June 2018 Notice of Appearance for Julie Ezell on Behalf of NRC Staff ML18162A3312018-06-11011 June 2018 Notices of Appearance of Michael Lepre, Timothy Walsh, and Anne Leidich on Behalf of TVA ML18162A3632018-06-11011 June 2018 NRC Staff Motion to Dismiss Contention 2 as Moot and Answer to Intervenors' Motion for Leave to File Contention 4 and Contention 5 ML18141A8922018-05-21021 May 2018 Attachment 3 (Declaration of Dr. Edwin S. Lyman) to Intervenors' Motion for Leave to File Contentions 4 and 5 ML18141A8882018-05-21021 May 2018 Intervenors' Motion for Leave to File Contention 4 (Inadequate Discussion of Environmental Impacts of Spent Fuel Pool Fires) and Contention 5 (Impermissible Discussion of Energy Alternatives and Need for the Proposed SMR) ML18141A8912018-05-19019 May 2018 Attachment 2 (Safety Features of the NuScale Design) to Intervenors' Motion for Leave to File Contentions 4 and 5 ML18141A8892018-05-19019 May 2018 Attachment 1 (Spent Fuel Pool Safety) to Intervenors' Motion for Leave to File Contentions 4 and 5 ML18141A8932018-05-18018 May 2018 Attachment 4 (Declaration of Dr. M.V. Ramana) to Intervenors' Motion for Leave to File Contentions 4 and 5 ML18124A1262018-05-0404 May 2018 Joint Motion for Clarification of Scheduling Order ML18117A4222018-04-27027 April 2018 Notice of Appearance for Megan A. Wright ML18116A6652018-04-26026 April 2018 Notice of Appearance for Olivia Mikula 2019-08-26
[Table view] |
Text
Attachment 1 5/19/2018 NuScale Power - Spent Fuel Pool Safety Why SMR? Our Technology NuScale SMR Benefits About Us Spent Fuel Pool Safety The NuScale spent fuel pool provides storage for up to 10 years The NuScale spent fuel pool of spent fuel storage, plus temporary storage for new fuel and dry cask storage can assemblies. The pool water volume provides a minimum of 30 safely store all of the spent days of passive cooling of the spent fuel assemblies following a fuel from 60 years of loss of all electrical power without the need for additional operations.
water.
The NuScale spent fuel pool is a below-grade, stainless steel lined concrete pool adjacent to the reactor pool. The stainless steel liner is seismically isolated from the concrete pool wall. Its below-grade position greatly reduces potential for loss of http://www.nuscalepower.com/smr-benefits/safe/spent-fuel-pool 1/2
5/19/2018 NuScale Power - Spent Fuel Pool Safety cooling water. A clean-up system reduces the build-up of contaminants.
After removal from the reactor core, spent fuel assemblies are placed in dedicated spent fuel storage racks in the below ground spent fuel pool, which contains four times more water volume for cooling per fuel assembly than current designs. Use of standard LWR fuel allows leveraging extensive experience and infrastructure for the storage, handling, and shipment of Spent Fuel Storage spent reactor fuel. Our facility is designed for ease of spent fuel transfer to a dry cask storage system. Within approximately 5 years, the thermal load of the spent fuel assemblies is reduced significantly, and can be moved to a secure dry storage area.
The plant site layout includes space allocation adequate for the dry storage of all of the spent fuel for the 60-year life of the plant.
More about NuScale's protection against extreme events to safeguard the public, workers, and the environment.