e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 W. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS March 1, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. D. G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Serial No. 087 NO/HWB/TAH:jab Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 VIRGINIA ELECTRIC POWER COMPANY SURRY POWER STATION UNITS NO. 1 AND 2 NORTH ANNA POWER STATION UNITS NO. 1 AND 2 CONT!OL ROOM DESIGN REVIEW PROGRAM PLAN In accordance with our April 15{ 1983 response to Supplement 1 to NUREG-0737, Serial No. 006, the attached Frogram Plan is provided to delineate Vepco' s approach for the performance of the Control Room Design Review (CRDR) at our North Anna and Surry Power Stations.
Our current schedule date for completion of the Control Room Design Review is August 30, 1985.
At that time, Vepco will submit a Final Summary Report containing:
a)
Review findings b)
A description of the review process c)
A summary of the identified Human Engineering Discrepancies (HEDs) d)
Proposed corrective actions e)
Proposed implementation schedules As directed by Supplement 1 to NUREG-0737, the implementation of the CRDR and the development of new symptom-based EOPs are highly integrated.
Please note therefore, that the results of the upcoming March 13 meeting on EOPs between the NRC and the Westinghouse Owners Group could have a significant impact on the implementation of the CRDR.
For this reason, it may become necessary for Vepco to revise Section 4.4 SYSTEM FUNCTIONS AND TASK ANALYSIS, Section 4.7
/
e VmorNIA ELECTRIC AND PowER CoMPANY To Mr. Harold R. Denton VALIDATION OF CONTROL ROOM FUNCTIONS, and to reschedule the CRDR completion date.
If this occurs, Vepco will provide a schedule for developing the required revisions within thirty (30) days after the resolution of the EOP issue.
Attachments cc:
Mr. James P. O'Reilly Regional Administrator Region II USNRC Suite 2900 101 Marietta St.
Atlanta, Georgia 30303 Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing Mr. J. Don Neighbors Surry Project Manager Mailstop 438 7920 Norfolk Ave.
USNRC Bethesda, Maryland 20014 Mr. Leon B. Engle North Anna Project Manager Mailstop 438 7920 Norfolk Ave.
USNRC Bethesda, Maryland 20014 Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Very truly yours,
\\JJS~
W. L. Stewart j