e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L. STEWAXT VICE PRESIDENT NUCLEAR OPERATIONS Mr. Harold R. Denton, Director March 2, 1984 Office of Nuclear Reactor Regulation Attn:

Mr. Darrel G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY Serial No. 095 NO/TAH:acm Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 SURRY AND NORTH ANNA POWER STATIONS RESPONSE TO PROCEDURE GENERATION PACKAGE ISSUES Your letter dated January 25, 1984, received January 31, 1984, requested additional information in order to conduct a detailed review of the Vepco Procedures Generation Package (PGP).

Following receipt of this letter, a telephone conference was held between Messrs. Leon Engle, Sam Bryan, and William Middleton of the NRC and Vepco representatives.

In accordance with the positions agreed upon during this conference, the following information is provided.

Items 1 and 2 will be addressed by May 30, 1984.

During the ninety (90) day period we will provide a description of our methodology for conversion of generic guidelines to plant specific Emergency Response Procedures (ERP).

In addition, we will identify deviations between our specific plants and the reference plant on which the generic guidelines were based.

These deviations will be evaluated for strategic safety significance.

Should strategic differences in mitigation actions be determined, a schedule for analysis and justification will be provided.

With regard to Item 3; we concur that this concern should be addressed generically by the Westinghouse Owners Group (WOG).

The WOG and NRC representatives will meet to discuss this issue on March 13, 1984.

The results of this meeting could have significant impact on Vepco response to both Control Room Design Review (CRDR) and the ERP generation effort.

/

I I

.6403080091 840302 PDR ADOCK 05000280 F

PDR l

e e

VIRornu. ELECTRIC AND Pow.ER CoMPANY To Harold R. Denton Therefore, we feel it is inappropriate to address this item or provide a schedule for action at this time.

We will provide our schedule for response to this item within thirty (30) days of receipt of the final results of this meeting.

Attachments cc:

Mr. James P. O'Reilly Regional Administrator Region II USNRC Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. James R. Miller, Chief Operating Reactors Branch No; 3 Division of Licensing Mr. J. Don Neighbors Surry Project Manager Mailstop 438 7920 Norfolk Ave.

USNRC Bethesda, Maryland 20014 Mr. Leon B. Engle North Anna Project Manager Mailstop 438 7920 Norfolk Ave.

USNRC Bethesda, Maryland 20014 Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. M. W. Branch NRC Resident Inspector North Anna Power Station Very truly yours, J,l,~~

W. L. Stewart