ML18139C338
| ML18139C338 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/11/1983 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| References | |
| PSE-SEW:LMF:049, PSE-SEW:LMF:49, QDR-5437-212-01, QDR-5437-212-1, QDR-5437-252-01, QDR-5437-252-1, NUDOCS 8305180372 | |
| Download: ML18139C338 (3) | |
Text
'-- - -* ~
W. L. STEWART VxcE PRESXDENT NUCLEAR OPERATIONS e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 11, 1983 Mr. Harold R. Denton, Director
- Office of Nuclear Reactor Regulation Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch No.
Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
TECHNICAL EVALUATION REPORTS Serial No.:
085E PSE/SEW:lmf:0469C Docket Nos.: 50-280 50-281 License Nos.:DPR-32 DPR-37 ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT SURRY POWER STATION UNITS 1 AND 2 Vepco provided its thirty (30) day response to the NRC Safety Evaluatio~
Report for Surry Power Station, Unit Nos. 1 and 2 on the environmental qualification of safety-related electrical equipment by letter (Serial No.
085C) dated March 9, 1983.
The response provided in this letter did not address Category IV equipment items, since it was not required by the SER.
Your letter of April 4, 1983 advised Vepco of this response requirement.
Attachments 1 and 2 provide the Vepco response to Category IV equipment items.
Attachments 3 and 4 are equipment qualification file packages (QDR 1 s) which are submitted in support of specific equipment items identified in Attachments 1 and 2.
These QDR 1 s have not been previously submitted to the NRC.
This completes the thirty (30) day response requirements of the April 4, 1983 letter. Additionally, it should be noted that the response to the January 26, 1983 letter with regard to plans for qualification or replacement and a schedule for accomplishing proposed corrective actions (Ninety (90) Day Response) has been superceded by the requirements of 10CFR50.49.
In this regard, the Vepco response will be provided by May 20, 1983.
,8305180372 830511 PDR ADOCK 05000280 p
Q...-.--**
e VIRGINIA ELECTRIC AND POWER COMPANY TO This is consistent with the requirements of 10CFR50.49 and your April 4, 1983 clarification letter.
cc:
Mr. James P. 0 1Reilly w/attachments Regional Administrator Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Very truly yours, I
µCv'4fY W. L. Stewart ~
I-J Attachments Atta~hment 1:
Unit 1:
Response to NRC Category IV :
Unit 2:
Response to NRC Category IV :
QDR-5437-212-01: Compsip Delphi Hydrogen Analyser, Unit 1 :
QDR-5437-252-0l:
Compsip Delphi Hydrogen Analyzer, Unit 2
..: