ML18139C227

From kanterella
Jump to navigation Jump to search
Requests Approval of Route for Planned Irradiated Fuel Shipment from Facility to Bmi Facility,West Jefferson,Oh
ML18139C227
Person / Time
Site: Surry  
Issue date: 11/19/1982
From: Danese F
NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
21761, NUDOCS 8302040476
Download: ML18139C227 (2)


Text

~--*--.---

~------

.SI) -- ;2 g>()

  • .... ---:~.

Nuclear Assurance Corporation 24 Executivg-Park West

/

l '

I i I Director, Division of Safeguards U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Gentlemen:

DOCKETED USNRC Atlanta, Genrgia 30329 (404) 325-~00 Telex: 5495'57, 542703 715 Horizon Drive

-Grand Junction, Colorado 81501 (303) 245-4J20 TWX. 91092'£16334 Weinbergstrasse 9 8001 Zurich. Switzerland (01) 470844 Telex: 5727:£ November 19, 1982 FLO /8 2/ll.80 / ETS

..fo -*)-SJo c.!,*c 00 7-80.[ro R_,

V~~~;/'J,',l f fce/,i ;c ?owc,'l.. l,,7!?/J/11,j (t/t/Jco*

The Co111i11011 ** ~alt:F1 Eeli3efl i:!-elfli,'aR:)' has reques ed the Nuclear Assurance Corporation to act on their behalf to request approval of a route for a planned irradiated fuel shipment from the Surrey Station at Gravel Neck, Virginia, to the Battelle Columbus facility at West Jefferson, Ohio.

In accordance with the Guidelines for submittal contained in NUREG-0061, the following information is provided.

1. Cargo Description 12 extended burnup pins inserted in a special container.

- Model No. NLI-1/2, Cask Package No. USA/9010/B()F.

- Loaded weight of the transport vehicle is (approximately) 7.l 9 (iJOO lbs.

2.

Anticipated Schedule, Enclosed Separately as Safeguards Inforr0tion.

3.

Route Description

- Origin:

Surrey Nuclear Power Plant Gravel Neck, Virginia

- Destination: Battelle Columbus Laboratories West Jefferson, Ohio

- Proposed Route:

Surrey Station South on I-650 to V-10 V-10 West to V156 V-156 North to V-5 V-5 East to V-155 V-155 North to I-64 I-64 West to I-295 I-295 West to I-64 I-64 West to I-81 I-81 North to 1-70 1-70 West to US-40 Approximate ff.iles 10 35 5

10

_13 17

n 115
  • 128.

27

Director, Division of Safeguards November 19, 1982 Page Two

- Proposed Route (continued):

Approximate Miles 44 FLD/ja I-70 West to US-48 US-48 West to.I-79

  • I-7~ North to I-70 I-70 West to I-270 I-270 South to I-70 I-70 West to OH-142 OH-142 South to Facility Since~ely yours, NUCLEAR ASSURANCE.CORPORATION

.o/~&J~*

F. L. Danese *

  • Manager, Cask Operations 76 53 145 21 9

. 1 740 I