ML18139C150
| ML18139C150 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna, 05000000 |
| Issue date: | 12/06/1982 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0696, RTR-NUREG-696 676, GL-81-10, NUDOCS 8212090419 | |
| Download: ML18139C150 (2) | |
Text
,")
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
- w. L. STEWART VxcE PRESIDENT NUCLEAR OPERATIONS December 6, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Serial No. 676 NO/DWL:acm Docket Nos. 50-280 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY SUPPLEMENTAL INFORMATION RE:
NUREG-0696 RESPONSE In response to Generic Letter 81-10, which transmitted NUREG-0696 to the nuclear utility industy, Vepco provided information on our plans for Emergency Response Facilities (ERFs) by letter dated June 1, 1981 (Serial No. 312).
This information was supplemented by letter dated April 8, 1982 (Serial No.
102).
Recently, Vepco was contacted by the NRC with a request for additional information regarding the status of our efforts pertaining to ERF location and construction.
The requested information was given over the phone to the Surry NRC Project Manager for both the Surry and North Anna stations.
In order to formally respond to this request, the attachment to this letter provides confirmation of the information given over the phone.
If there are any questions regarding this information please contact us.
cc:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Very truly yours, QL~
W. L. Stewart
- .**.:**.-,*,* ***t",.-*;:*.,..
Attachment to Ltr. No. 676 NORTH ANNA SURRY Local EDF (Primary)
Local EDF (Primary)
Question Central EDF (Backup)
Central EDF (Backup)
Permanent Interim Permanent Interim Distance from Plant
"'* 25 miles rv.3 miles N 43 miles
"'.2 miles N 51 miles Construction Material metal frame metal frame glass, steel, concrete metal frame glass, steel, concret e Protection Factor
<5
.( 5 N/R (5
N/R Construction Start Date Oct. 1981 Existing Bldg.
Existing Bldg.
Existing Bldg.
Existing Bldg.
Construction Status Complete**
N/A N/A N/A N/A HEPA Filters (Y/N)
No No N/R No N/R e
N/A ~ Not Applicable N/R - Not Required
- Interim facility housed in planned permanent facility.
- Interim facility to be moved to permanent facility (Training Center) in 1st quarter 1983.
~ '
L *
,\\
'