ML18139C064
| ML18139C064 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 10/06/1982 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18139C065 | List: |
| References | |
| 568, NUDOCS 8210200043 | |
| Download: ML18139C064 (3) | |
Text
.....
e VIRGI'.NIA ELECTRIC AND PowER COMPANY RICHMOND.., VIRGINIA 2 3 2 61 R.H.LEASBURO VICE PRESIDENT NuCLEAll 0PBRAT:CONS October 6, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Serial No. 568 NO/ERS,Jr.:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 and 2.
The proposed changes are enclosed.
The proposed change revises Specification 3.11 by adding 3.11.B.lb and 3.11.B.lc.
T.S. 3.11.B.lb provides action to be taken if the limit given in T. S. 3.11. B. la is exceeded.
T. S. 3.11. B. le exempts T. S. 3.11. B. la from the provisions of T.S. 6.6.2.a.
These changes modify reporting and notification requirements.
The instantaneous release limit is not affected.
Additionally this change will result in a specification which more closely resembles the current standard Technical Specifications.
The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.
It has been determined that this request does not involve an unreviewed safety question.
We have evaluated this request in accordance with the criteria in 10 CFR 170.22 and it has been determined that a class III license amendment fee is required.
A voucher check in the amount of $4,400 is enclosed in payment of the required fee.
R.H. Leasburg p
VIRGINIA ELECTRIC AND POWER COMPANY TO Harold R. Denton Attachments:
- 1.
Proposed Technical Specification change
- 2.
Voucher Check No. 82659 for $4,400 cc:
Mr. James P. O'Reilly Regional Administrator Region II
\\. ' '
~OMMONWEALTH OF VIRGINIA)
)
CITY OF RICHMOND
)
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company.
He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this
~-cL.. day of ~,
19
~.,;)...
My Commission expires: ---~--_.;)-_~ __, 19 ~s-.
Notary Public (SEAL)