ML18139B946

From kanterella
Jump to navigation Jump to search
Advises of No Current Plans to Incorporate Overtime Restrictions Into Tech Specs.Info Revises 820630 Response to Generic Ltr 82-10 Re Status of NUREG-0737,Item I.A.1.3
ML18139B946
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/13/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-TM 388A, GL-82-10, NUDOCS 8207190297
Download: ML18139B946 (2)


Text

...

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23 261 R. H. LEASBURG VI<;>E PRESIDENT July 13, 1982 NUCLEAR 0PERA'J'IONS Mr. Harold R. Denton, Director Serial No. 388A Office of Nuclear Reactor Regulation NO/DWL:acm Attn: Mr. Darrell G. Eisenhut, Director Docket Nos. 50-280 Division of Licensing 50-281 U. S. Nuclear Regulatory Commission License Nos. DPR-32 Washington, D. C. 20555 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 SUPPLEMENTAL RESPONSE TO GENERIC LETTER 82-10 NUREG-0737, ITEM I.A.1.3 In our response to Generic Letter 82-10 for the Surry Power Station dated June 30, 1982 (Serial No. 388) Vepco provided information on the status of NUREG-0737 Item I.A.1.3. This item deals with minimum shift manning requirements and overtime restrictions. Vepco is in compliance with the requirements of Item I. A.1. 3 and shift manning is a Technical Specification item. However, it was incorrectly stated that the overtime restrictions were also in the Surry Technical Specifications when, in fact, overtime restrictions are administratively controlled. There are no current plans to incorporate these overtime restrictions into the Surry Technical Specifications as was done for the North Anna Power Station. Please note this correction in your review of our Generic Letter 82-10 response.

R.H. Leasburg 8207190297 820713

~DR ADOCK osooo2ao PDR

_,f ~

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Co~pany, and the statements in the document are true to the best of his knowledge and belief.

-t::L 8.;>.- .

Acknowledged before me this / 3 day of -~---..;;;..._ _ _ _ , 19

~ _ ;;;>.- 6 My Commission expires: ----===-=;.....:~...;._-- , 19 S, -=>

~;1 *

~ a' /'h_ C Jv-----__

Notary Public

~

(SEAL)

' . -~.

    • -** ...,.~...,