ML18139B546

From kanterella
Jump to navigation Jump to search
Confirms 810922 Telcon Re Relief from Hydrostatic Test Requirements.Weld Integrity Will Be Verified by Performing Volumetric Exam w/100% Radiography,Ultrasonic Testing & Inservice Leak Test Performed at Hot Shutdown
ML18139B546
Person / Time
Site: Surry 
Issue date: 09/25/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
565A, NUDOCS 8110010132
Download: ML18139B546 (1)


Text

    • -*~

e

---.;::.~,..,

,-,"7"', J_~

COMP.,,.,..,.v~.. :!:,,'

.., Cit.rr, !V(f.__t<<:

VIRGINIA ELECTRIC AND POWER n..J."..,. "

J i(tf, s

C' RICHMOND,, VIRGINIA. 23261

, O fl\\.t.. }

  • i

)

1 *

~.,

F_

2 l -

Sfp3 0 1~~1~~ r_

i :*:,

U *.s. lliJn,." R

-\\

~""~'" !:GUI.AT""'" -*3 R.H.LEASBURG V:roE P:RESXDENT NUCLEAR OPERATIONS September 25, 1981 co:,w,ssio" """"

1

  • ~

/'

/,

/\\""-

'//;'"

  • <: y' /

-~r~/

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr, Steven A. Varga, Chief Operating Reactors Branch No. 1 U.S. Nuclear Regulatory Connnission Washington, D.C. 20555 Gentlemen:

,,O:I / l~

~--

Serial No. 565A NO/RMT:rmt Docket No. 50-280 License No. DPR-32 This letter is supplemental to our 9-18-81 letter and is a confirmation of our 9-22-81 telecon concerning relief from hydrostatic test requirements.

It is our intention to verify weld integrity by (1)

Performing volumetric examination with 100%

radiography, (2)

Volumetric examination by ultrasonic testing, and (3)

An inservice leak test performed at hot shutdown.

If you have any further questions, please contact this office.

Please find enclosed a check in the amount of $4,000.00 in payment of Class 3 Technical Review fee.

Ve~

Enclosure (Voucher Check No. 47989 for $4,000.00) cc:

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II

  • 11 8110010132 810925 ".

~DR ADOCK 05000~~~:

R.H. Leasburg