Forwards Preliminary Design Details of New Concept to Provide Alternate Cooling Water Source to Charging Pump Coolers.Sys Expected Operational within 60 Wks of NRC Approval
ML18139B436
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/02/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
404, NUDOCS 8107070458
Download: ML18139B436 (4)


Text

  • --

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND_.. VIRGINIA 23261 R. H. LEASBURO VroE PBESXDENT NUCLEAR OPERATIONS July 2, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

FIRE PROTECTION DESIGN INFORMATION SURRY POWER STATION UNITS 1 AND 2 Serial No. 404 NO/SWB:ms Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 The Fire Protection Safety Evaluation Report for Surry Power Station required an alternate source of water to be provided to assure operation of the charg-ing system in the event of a fire in Mechanical Equipment Room 3.

At the present time both units' charging pumps service water pumps are located in Mechanical Equipment Room 3.

VEPCO letter Serial No.

3541/061478 dated June 30, 1980, gave a detailed design description of a modification which utilized fire water as an alternate source of charging pump service water and meet the provisions of the Safety Evaluation Report.

The NRC fire protection staff disapproved VEPCO's design in a meeting on January 19, 1981.

The purpose of this letter is to give design details of a new concept to provide an alternate source of cooling water to the charging pumps coolers.

The design removes two (2) charging pump service water pumps, one (1) from each unit and replaces these pumps with qualified pumps in the auxiliary building.

Attached are a preliminary drawing and an installation description of the proposed design.

We will proceed with the engineering and material procurement immediately after your approval of the design.

The system can be operational 60 weeks after your approval.

The long lead is required for material procurement of

e 2

VIRGINIA ELECTRIC AND POWER COMPANY TO the pumps and valve.

We are attempting to shorten the lead time by evaluating substitute material i.e., reuse of the present pumps if environmental and seismic conditions can be met.

If you have any questions, please contact us.

v;rwtl;s, i

f R.H. Leasburg Vice President Nuclear Operations Attachments cc:

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II

j

}

  • '.4
  • ,1 1_;,.

{

1 COMPONENT COOLING WATER HEAT E>CHANGER I

C D

E I

I 1URB1NE BLDG------- TURBINE BLDG/AT BLDG PIPE TUNNEL PORTION F P1PE 2"

_L _____ _

-t-AUXILIARY I~

BLDG CHARGING Pl.MP SERVICE WATER PUMPS NEW LOCATION a

Tb CHARGING PUMP

_OIL COOLERS ( UNIT*1)

EX!~ I1t:!~~L21B NEW CL21B E

~TING J-I NEW EXISTIN I

1-,t><!!o----..... -----~i----t I PORTION 1-SW-P-10A, I

30~WS-14*10 42~WS*13*10 4

11448-fM-21A (H-3 l EXISTING PIPING TO BE REMO/ED 2'

II OF PIIP_L~*

I 2-SW-P-10A i

- Ll"S-73-1~1------------------------'

I I

2tws-173-136

  • : I

~---+-+I_ ---------------l ~-~

I

~ !

~--M-l I~) ~~,

I

, Z.L I f!...-sw-P-10A I EXISTING TO BE.

RELOCATED TO I AUX BLDG i

SERVICE BLDG CHILLER ~QOM i i.

2-SW-P-10B (1154B-FM-21B,G-9) 1-SW-P-10B (1144B*fM*21B,G-9l CHARGING PUMP SERVICE WATER PUMPS

. EXISTING NEW

_PRELIMINARY TO CHARGING PUMP OIL COOLERS (UNIT*2)

J 1154B-FM-21B (F - 1) 4

.; ~* '

NUCLEAR SAFE TY s

~ :

RELATED

! i

  • Q A CAT I &II i ~ ~,'

1-4-+-------l---+---1--+---1PROPOSE D ALTERNAT 3

WATER SUPPLY w &1 r-*

1 z

TO CHARG PP COOL' S ~ ~ :c *.

l---+-=~~----~-4---4-~---1;.....;...;'----~'----'-------;lJI..J *,,

VEPCO - SURRY 1 &2 ~ ~,;

IHI 0~ f:

STONE & WEBSTER ENGINEERING CORP.

DN~~-12846.40-MKS-

-1 2 '; :,

H1u1*t1e**

A ETA oo,ao

~ ~ r_:._

t-'"-'""'"'+-"'-'-' +c'....:"-1' r"".cc"'+':.:."..,;.' +-';....;"+-'-*'+-"*'--* 1-".:..:..,*....;.'..;;;.'*+.;;.." *;.;.+-*c,,;*'-+-"":.:c"+-=-'"c.:..* +:"::.:"..:.,' i-:':.:.

.. :.:."'~":.:.;.'*+:*c:.:**c:.,* ~"::.:*'=-+' :.:.'":..:"'~":.:.' J..:'.:.:":.+:-='":.:."'+:":.:c11:.:.*i-:*...:*

--4'...:*c:.* *+=c-***:.:.* i-:-':..:."::..i'...:'.:.:"-1-":::":.:..i'L OIIIOH n

...... nT Mulvaney i-;'.:;..:".:;..:"~~".cc.";:..;c"-+---'

00="-"..c..'-..

co*** u M. Dedek

~ ~ ~,... ;

1

~

DESCRIPTION '

The present design of the charging pump service water pumps does not provide redundancy in the event of a fire in Mechanical Equipment Room No. 3.

The proposed change is as follows:

1.

A 3 in. tie in connection will be made on 30"- WS-14-10 between 1-CC-E-lA and its inlet valve.

2.

A new 30 in. Butterfly Valve (Category 1) will be installed between the new connection and 1-CC-E-lA.

3.

A 3 in. isolation valve will be installed on the 3 in. line.

4.

The 3 in. line will run down into the pipe tunnel where it will tee into two 2 in. lines that will be connected to existing lines 2"-WS-71-136 and 2"-WS-171-136.

The existing line from here back to the original pumps will be removed from service.

5.

Lines 2"-WS-71-136, 2"-WS-173-136, 2"-WS-71-136, and 2"-WS-171-136 will be replaced from the exit of the pipe tunnel with class 21B pipe.

6.

Pumps 1-SW-P-lOA and 2-SW-P-lOA will be removed from Mechanical Equipment Room No. 3 and reinstalled in the Auxiliary Building (2 ft elevation) in lines 2"-WS-71-136 and 2"-WS-171-136.

7.

Units 1 and 2 will be cross-connected on the discharge of 1-Sll~P-lOA and 2-SW-P-lOA.

9-1284640-1 PRELIMINARY

~ -

      • -*. **~**-***

~-*


,