ML18139B429

From kanterella
Jump to navigation Jump to search
Forwards Amend 4,Draft 5 to VEP-1,QA Program,Operations Phase.Revision Complies W/Current Reg Guides & ANSI Stds & Reflects Util Organizational Changes
ML18139B429
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 07/06/1981
From: Baum E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haass W
Office of Nuclear Reactor Regulation
Shared Package
ML18139B430 List:
References
401, NUDOCS 8107070154
Download: ML18139B429 (1)


Text

e Vepco VIRGINIA ELECTRIC AND POWER COMPANY, RICHMOND, VIRGINIA 23261 Mr. W. P. Haass, Chief Quality Assurance Branch Division of Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 RE:

Docket Nos.

50-280, 50-338, 50-404, 50-281 50-339 50-405 Serial No. 401 QA/MDT:bdw

~£~VE~~

JUL O 6.1981.._ 11\\

U,S. NUC.EAR REGUIJIITOl'C j COMMISSl014

Dear Mr. Haass:

"v \\

'l?,

A thorough review of the *vepco "Topical Report, Qualit.,~* "'."1':~*y' Program, Operations phase, VEP-1" has been completed.

Major change ~

been made to update the "Topical Report" to comply with current NRC Reg-ulatory Guides and ANSI standards.

Additionally, significant Vepco or-ganizational changes are reflected.

A draft revision, resulting from this review, is enclosed for your review and approval.

8-1070701 54.. 810706. -

PDR ADOCK 05000280 P

PDR Very truly yours, Executive Manager Quality Assurance