ML18139B414

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to Util 801215 Response to NUREG-0737 Re post-TMI Requirements.Revised Sections Include Plant Shielding,Dedicated Hydrogen Penetrations & Sampling & Analysis of Effluents
ML18139B414
Person / Time
Site: Surry, North Anna  
Issue date: 06/18/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-1.A.1.1, TASK-1.C.5, TASK-1.D.1, TASK-TM 358, NUDOCS 8106260145
Download: ML18139B414 (2)


Text

e VIRGINIA. ELECTRIC AND POWER COMPANY RICHMOND,V:t:aOINIA 23261 June 18, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Serial No. 358 NO/DWL:ms Docket Nos. 50-280, 50-281 50-338, 50-339 License Nos. DPR-32, DPR-37 NPF-4, NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY REVISION 1 TO NUREG-0737 RESPONSE Enclosed is Revision 1 to our December 15, 1980 (Serial No. 985) submittal titled "Response to NUREG-0737 Post-TMI Requirements".

Vepco committed to periodically update our NUREG-0737 response in the December 15, 1980 submit-tal.

The enclosed revision provides the information necessary to update our NUREG-0737 such that it reflects the current status of our implementation efforts as of May 31, 1981.

A significant aspect of this revision is that it includes the finalized requirements of NUREG-0696 (Item III.A. I. 2).

Also, no significant schedular exceptions are introduced by this revision.

The revision does, however, provide typographical error corrections to some submittal and implementation dates as well as revisions to dates which were inconsistent with other Vepco commitments.

These other commitments are due or have been made in response to requirements of other NUREG's or I&E Bulletins.

Item II.E.1.2 Part 2 has been discussed with the NRC Project Manager and Technical Reviewer in regard to Surry AFW flow transmitter qualifications.

The revision contained herein reflects that conversation.

We hope that this update will assist your staff in the review of our implemen-tation efforts.

If there are any questions or concerns, please contact this office at your convenience.

Attachment Very truly yours, lJ~-~

-\\

B. R. Sylvia,

Manager - Nuclear Operations and Maintenance

e I

ATTACHMENT TO LETTER NO. 358 REVISION 1 TO VEPCO' S *"RESPONSE TO NUREG 0737 POST-TI1I REQUIREMENTS" Please update your copy of the document titled "Response to NUREG 0737 Post-TMI Requirements" with the enclosed revised pages in accordance with the instructions given below:

Delete page(s)

Title page (Rev. O) V B-2 B-5 to B-10../

C-2 to C-10 D-2 to D-10/

./'

I.A. 1.1-4

,..,-/'

I. C. 1-6 I.C.5-3 --

II.B.2-11 to II.B.2-19 II. B. 4-3 ------

II. E. 1.1-5 to II.E.1.1-18 _.;'

II.E.1.2-PZ-7 _..,

II.E.4.1-3,,.--

II.F. l-Al-6 to II.F.l-Al-13 II.F.1-A2-4 to II.F.l-A2-6~

II. K. 3.1-3---

II. K. 3. 2-4--.

II.K.3.3-2--

II.K.3.5-3--

II.K.3.17 III.A.1. 2-1----

III.A. 2-7 ----

III.D. 3. 4-6 to III.D.3.4-7 Insert page(s)

___/

Title page (Rev. 1)

B-2 ~ _/

B-5 to B-10 C-2 to C-10 ____./

D-2 to D-10 _

_,,/

I.A.1.1-4-----

...... ---------,.;-./

I.A.1.1-7 to I.A.1.1-18 I. c. 1-6 I.C.5-3 II.B.2-11 to II.B.2-18 ~

II.B.4-3 --

I I.E. 1. 1-5 to I I. E. 1. 1-1 7__.,

II.E.1. 2-P2-7 II.E.4.1-3 ----

II.F.l-Al-6 to II.F.1-Al-14 I1.F.l-A2-4 to II.F.l-A2-6----

1I. K. 3.1-3 ~

II.K.3.2-y II.K.3.3-2~

II.K.3.5-3 --

II.K.3.17-3 to II.K.3.17-44 III.A.1.2-1 to III.A.1.2-8-_,,

III.A. 2-7 III.D.3.4-6 to III.D.3.4-7