ML18139B315

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-010/03L-0 & 81-023/03L-0
Date released: 12/10/2018 Download: ML18139B315


LER 81-023/03L-0:on 810422,PT-39B-2 Indicated Snubbers to Be Inoperable Per Tech Spec 4.17.Caused by Leakage Around Valve Block or Through Connections at Reservoir. Inoperable Snubbers Replaced
ML18139B317
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/15/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B317 (2)
LER 81-010/03L-0:on 810415,alarm Setpoints for RM-CC-105 & RM-CC-106 Found Greater than Tech Spec Limits on Several Occasions.Caused by Misinterpretation of Background & Insufficient Guidelines for Evaluation of Alarm Setpoint
ML18139B316
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/15/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B316 (2)
Forwards LERs 81-010/03L-0 & 81-023/03L-0
ML18139B314
Person / Time
Site: Surry Dominion icon.png
Issue date: 05/15/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B314 (1)