VmorNIA ELECTRIC AND PowEH COMPANY RICRMOND,V:rRGINJ:A. 23261 March 26: 1981 Mr. James P. O'Reilly, Director
/'"\\\\°"OJ,/~~
Office of Inspection and Enforcemen~~)-).._J--1-L..L[~:'!/~
- u. s. Nuclear Regulatory Commissif h ~( ~('j~. (~\\
Serial No. 063 NO/ERSjr:ms Region II t
9 flt.JuL 11 t,!) _,
Docket No. -=-o~-~2~8~0~
101 Marietta Street, Suite 3100 -, /J)'
{
- ~
Atlanta' Georgia 30303 s--=i IJ R O 6 19.o ~:-11
Dear Mr. O'Reilly:
\\ -i
- S, NuqE ol.~
\\----\\
cotA "'R RtGu
\\ -'\\
11-ils:;,'ONI.Aio:;'t
{='.
\\\\]?>
12:rrr:.-r~
~-
f\\)
IE BULLETIN NO. 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS License 50-281 50-338
~339 No --..___DPIF3"2 DPR-37 NPF-4 NPF-7 This is in response to IE Bulletin 81-01 concerning surveillance of mechanical snubbers.
Our responses for Surry Power Station Units 1 and 2 and North Anna Power Station Units 1 and 2 are attached.
Attachment cc:
Mr. Steven A. Varga, Chief Operating.Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing Very truly yours,
!J:fJkL; B. R. Sylvia Manager - Nuclear Operations and Maintenance Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
~*
I,,
e SURRY POWER STATION IE BULLETIN 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS Attachment Page 1 Surry presently has 26 Mechanical Snubbers installed on various systems.
Unit 2 utilizes 25 Mechanical Shock Suppressors and Unit 1 utilizes 1.
All
- Mechanical Snubbers installed were manufactured by Pacific Scientific Company (Model PSA-3).
During the upcoming outage on Unit 2, scheduled to commence April 17, 1981, Mechanical. Snubbers will be inspected/tested in accordance with the requirements of IEB 81-01.
Results and a description of the inspections performed will be submitted within 60 days after the completion of the inspection.
' I
NORTH ANNA POWER STATION IE BULLETIN 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS Attachment Page 2 There are no _Mechanical Snubbers installed on North Anna Unit 2.
During the
. present refueling outage on North Anna Unit 1, we have installed four (4)
Pacific Scientific Company (PSA-\\) snubbers.
These snubbers were field veri-fied to be operable.
The next inspection is planned to coincide with the next required hydraulic snubber inspection (in approximately 12 months).
--- -