ML18139B237

From kanterella
Jump to navigation Jump to search
Forwards Responses to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. Surry Mechanical Snubbers Will Be Inspected & Tested During Unit 2 Outage Commencing 810417
ML18139B237
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/26/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
063, 63, IEB-81-01, IEB-81-1, NUDOCS 8104090604
Download: ML18139B237 (3)


Text

VmorNIA ELECTRIC AND PowEH COMPANY RICRMOND,V:rRGINJ:A. 23261 March 26: 1981 Mr. James P. O'Reilly, Director

/'"\\\\°"OJ,/~~

Office of Inspection and Enforcemen~~)-).._J--1-L..L[~:'!/~

u. s. Nuclear Regulatory Commissif h ~( ~('j~. (~\\

Serial No. 063 NO/ERSjr:ms Region II t

9 flt.JuL 11 t,!) _,

Docket No. -=-o~-~2~8~0~

101 Marietta Street, Suite 3100 -, /J)'

{

  • ~

Atlanta' Georgia 30303 s--=i IJ R O 6 19.o ~:-11

Dear Mr. O'Reilly:

\\ -i

  • S, NuqE ol.~

\\----\\

cotA "'R RtGu

\\ -'\\

11-ils:;,'ONI.Aio:;'t

{='.

\\\\]?>

12:rrr:.-r~

~-

f\\)

IE BULLETIN NO. 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS License 50-281 50-338

~339 No --..___DPIF3"2 DPR-37 NPF-4 NPF-7 This is in response to IE Bulletin 81-01 concerning surveillance of mechanical snubbers.

Our responses for Surry Power Station Units 1 and 2 and North Anna Power Station Units 1 and 2 are attached.

Attachment cc:

Mr. Steven A. Varga, Chief Operating.Reactors Branch No. 1 Division of Licensing Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing Very truly yours,

!J:fJkL; B. R. Sylvia Manager - Nuclear Operations and Maintenance Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

~*

I,,

e SURRY POWER STATION IE BULLETIN 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS Attachment Page 1 Surry presently has 26 Mechanical Snubbers installed on various systems.

Unit 2 utilizes 25 Mechanical Shock Suppressors and Unit 1 utilizes 1.

All

  • Mechanical Snubbers installed were manufactured by Pacific Scientific Company (Model PSA-3).

During the upcoming outage on Unit 2, scheduled to commence April 17, 1981, Mechanical. Snubbers will be inspected/tested in accordance with the requirements of IEB 81-01.

Results and a description of the inspections performed will be submitted within 60 days after the completion of the inspection.

' I

NORTH ANNA POWER STATION IE BULLETIN 81-01 SURVEILLANCE OF MECHANICAL SNUBBERS Attachment Page 2 There are no _Mechanical Snubbers installed on North Anna Unit 2.

During the

. present refueling outage on North Anna Unit 1, we have installed four (4)

Pacific Scientific Company (PSA-\\) snubbers.

These snubbers were field veri-fied to be operable.

The next inspection is planned to coincide with the next required hydraulic snubber inspection (in approximately 12 months).

--- -