Application for Amend to License DPR-37 Requesting 30-day Administrative Extension for Visual Insp Surveillance Requirement for Inaccessible Hydraulic Snubbers
ML18139B091
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/19/1981
From: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18139B092 List:
References
106, NUDOCS 8102250556
Download: ML18139B091 (3)


Text

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 JACK H. FERGUSON EXECUTXVE VICE P.RESIUEN'X February 19, 1981 Mr. Harold R. Denton, Director Serial No.

Office of Nuclear Reactor Regulation NO/DCW:ms Attn: Mr. Steven A. Varga, Chief Docket No. 50-281 Operating Reactors Branch No. 1 License No. DPR-37 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSE DPR-37 SURRY POWER STATION UNIT NO. 2 Pursuant to 10 CFR 50. 90, the Virginia Electric and Power Company hereby requests an amendment to Operating License DPR-37 for the Surry Power Station, Unit No. 2. As discussed by Mr. J. D. Neighbors of your staff and Mr. E. R. Smith, Jr. of our staff on February 10, 1981, if has become neces-sary to request a one-time extension to the grace period for the visual inspection surveillance requirement for inaccessible hydraulic snubbers.

We are requesting that Technical Specification 4.17.A for inaccessible hydraulic snubbers be given an administrative extension for 30 days. This extension would allow the surveillance to be accomplished in parallel with a scheduled maintenance outage, thus minimizing downtime, cost of replacement power, and the ultimate cost to the consumer. The scheduled maintenance outage cannot be scheduled earlier due to the required delivery time of materials.

All accessible hydraulic snubbers will be visually inspected within the required interval. The last visual inspection performed on Unit 2 snubbers revealed zero inoperable snubbers indicating the effectiveness of the snubber maintenance and inspection program. Therefore, the 30 day administrative extension will not have any significant impact on the ability of the affected inaccessible hydraulic snubbers to respond and perform satisfactorily during a seismic event or under accident conditions.

The present cycle of operations follows an extended Steam Generator R~place-ment and Refueling Outage. During this extended outage all hydraulic snubbers were removed, rebuilt or replaced as necessary, and functionally tested satis-factorily prior to re-installation. The visual inspection interval required at this time is 6 months +/- 25%. The previous interval requirement was 124 days +/- 25% and, in accordance with Specification 4.17 .A, may be changed only one inspection interval step at a time. All accessible hydraulic snubbers will be visually inspected within the required interval.

81 0225055lP- f

e VIRGINIA ELECTRIC AND POWER COMPANY TO 2

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the System Nuclear Safety and Operating Committee. It has been determined that this request does not involve an unreviewed safety question.

We have reviewed this request in accordance with 10 CFR 170 .22. Based on the recent satisfactory functional testing of all hydraulic snubbers, the Staff should be able to conclude that this request does not involve a significant hazards consideration; therefore, a Class III license amendment fee is required. Accordingly, a voucher check in the amount of $4,000.00 is enclosed in payment of the required fee.

Your prompt approval of this request will be greatly appreciated.

Very truly yours, J. H. Ferguson Executive Vice President

.Power Enclosures cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II

.e COMMONWEALTH OF VIRGINIA )

) s. s.

CITY OF RICHMOND )

Before me, a Notary Public, in and for the City and CoDllllon-wealth aforesaid, today personally appeared J. H. Ferguson, who being duly sworn, made oath and said (1) that he is Executive Vice President-Power, of the Virginia Electric and Power Company,. (2) that he is duly authorized to execute and file the foregoing Amendment in behalf of that Company, and (3) that the statements in the Amendment are true to the ~est of his knowledge and belief.

_ Given under my* hand and notarial seal this *1q1J:! day of l-cbcua 1) 9 J.9.8.1.*.

1'y Commission expires J0-r,ua_r~ J9 1 J9 9 9

~£~ry~c (SEAL)