ML18139A708

From kanterella
Jump to navigation Jump to search
Forwards LER 80-040/03L-0
Date released: 12/10/2018 Download: ML18139A708


LER 80-040/03L-0:on 800731,in Steady State Operation, Found That Primary to Secondary Leakage Through 1C Steam Generator Was 0.33 Gpm.Caused by Primary to Secondary Leakage Through Four Steam Generator Tubes
ML18139A709
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/28/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A709 (2)
Forwards LER 80-040/03L-0
ML18139A707
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/28/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A707 (1)