ML18139A626

From kanterella
Jump to navigation Jump to search
Forwards Auxiliary Feedwater Pump Endurance Test Rept. Results of Unit 2 Steam Turbine Driven Auxiliary Feedwater Pump Testing Will Be Forwarded After Startup
Date released: 12/10/2018 Download: ML18139A626


Auxiliary Feedwater Pump Endurance Test Rept. Schematic Diagram of Recirculation Flow Path Pump Vibration Data & Flow & Temp Charts Encl
ML18139A627
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/05/1980
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18139A627 (13)
Forwards Auxiliary Feedwater Pump Endurance Test Rept. Results of Unit 2 Steam Turbine Driven Auxiliary Feedwater Pump Testing Will Be Forwarded After Startup
ML18139A625
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/05/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, VARGA S A
Office of Nuclear Reactor Regulation
References
Download: ML18139A625 (1)