VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA. 23261 August 4, 1980 Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Serial No. 623 NO/RMT:ms Docket Nos-. 50-280 50-281 License Nos. DPR-32 DPR-37 We have reviewed your letter of July 7, 1980 in reference to the inspection conducted at Surry Power Station on June 3-6, *1980, and reported in IE Inspection Report Nos. 50-280/80-21 and 50-281/80-22.
Our response to the specific infraction is attached.
We have determined that no proprietary information is contained in the report-Accordingly, the Virginia Electric and Power Company has no objection to these inspection reports being made a matter of public disclosure
- Attachment cc:
Mr. Steven A. Varga Very truly yours,
,~-J £J /) ~;
/11\\ ~~!'t::..--::;;:>
B. R. Sylvia Manager - Nuclear Operations and Maintenance B 0080 60 3 ;LO Q
... --***.. ~--- -*-*****
....,,~---**-*-*-**- --~
NRC Comments:
RESPONSE TO VIOLATION LISTED IN IE INSPECTION REPORT NOS.
50-280/80-21 AND 50-281/80-22 Attachment As required by Technical Specification 6.4.A, detailed written procedures' with appropriate check off lists shall be prov~ded for release of radioactive effluents.
Contrary to the above 9 there were no written procedures for preparation of*
efficieny calibration standard for the Ge (Li) detectors which are used to assure compliance with radioactive effluent release limits.
Response
The information is correct as stated.
of the Ge(Li) detector, however the instructions for source preparation.
A procedure did exist for calibration, procedure did not contain detailed
- 1.
Corrective steps which have been taken:
As a result of** the infraction involving insufficieqt details for the preparation of source standards, Health Physics Procedure -
3.4.2 has been written which more clearly details the preparation method... :
- 2.
Corrective steps taken to avoid further non-compliance:
Health Physics Procedure 3. 4. 2 wil 1 be used in preparation of source stand-
- ards.
- 3.
Date when full compliance will be achieved:
Full compliance was achieved July 17, 1980.
J
NRC Comments:
RESPONSE TO VIOLATION LISTED IN IE INSPECTION REPORT NOS.
50-280/80-21 AND 50-281/80-22 Attachment As required by Technical Specification 6.4.A, detailed written procedures with appropriate check off lists shall be provided for release of radioactive effluents.
Contrary to the above, there were no written procedures for preparation of efficieny calibration standard for the Ge (Li) detectors which are used to assure compliance with radioactive effluent release limits.
Response
The information is correct as stated.
of the Ge(Li)
- detector, however the instructions for source preparation.
A procedure did exist for calibration procedure did not contain detailed
- 1.
Corrective steps which have been taken:
~-,--As-a-*resiilf-of the infraction involving insufficient details for the preparation of source standards, Health Physics Procedure -
3.4.Z has been written which more clearly details the preparation method.
- 2.
Corrective steps taken to avoid further non-compliance:
Heal th Physics Procedure 3.4.2 will be used in preparation of source stand-ards.
- 3.
Date when full compliance will be achieved:
Full compliance was achieved July 1.7, 1980.