ML18139A521

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-056/03L-0 & 80-057/03L-0
Date released: 12/10/2018 Download: ML18139A521


LER 80-057/03L-0:on 800818,at 89% Power,Periodic Test 27D Revealed Low Amperage Reading for Circuit 13A Boron Injection Recirculation to Boric Acid Tanks,Panel 9.Caused by Failure of Heat Tracing Tape.Design Change Initiated
ML18139A523
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/17/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A523 (2)
LER 80-056/03L-0:on 800818,at 89% Power,Periodic Test 27D Revealed Low Amperage for Circuit 7,panel 8.Caused by Damage to Heat Tracing Tape During Mechanical Work Nearby. Defective Tape Replaced & Verified Operable
ML18139A522
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/17/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A522 (2)
Forwards LERs 80-056/03L-0 & 80-057/03L-0
ML18139A520
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/17/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A520 (1)