VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 June 30, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Retulation Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. Denton:
Serial No. 577 LQA/JEE, PRB:rab Docket Nos.
50-280 50-281 License Nos. DPR-32 DPR-37 Attached to this letter is the revised version of the Surry Power Station Emergency Plan.
The criteria of NUREG-0654 were used in the development of this revision as well as the comments and interpretations presented at the March 26th meeting in Williamsburg, Virginia, with the Joint NRC/FEMA Emergency Plan Review Team.
It should be noted that the evacuation routes and assembly points for the general population have not been identified by the State and local governments to meet the new criteria.
This information is under development by them and will be presented as soon as it is available to us.
This Plan is based on existing meterological capabilities as our plans for meeting the criteria of Appendix 2 to NUREG-0654 are still under development.
As you are aware, these criteria are currently out for comment, and therefore it is necessary that the criteria be finalized before the company commits further outlay.
An interim Technical Support Center is described in the Plan.
Development of the permanent center at the site is under way but is not expected to be completed before December 31, 1980.
The Early Warning local governments.
- However, near both the North Anna and the intent of this criteria.
the methods; placements, and the results of these studies System by statute is the ultimate responsibility of Vepco, along with the State and the local governments Surry sites are working towards systems that meet Consultants have been hired and are currently studying operation of the most effective systems.
We expect /lo'l 3 and recommendations soon.
The "Letters of Agreement" are included in Section that meet the requirements of NUREG-0654.
There are "Letters of outstanding that will be sent to you as soon as we receive them.
. /,,..
II 'V
. ) F
.t.
rt1-E C~)
Ei>a ~Dt.>t ( y)
'Be. ().)
s-k./c r';oj>>AMS
~EG f;/E?::,
VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Harold Ro Denton 2
We wish to point out that we are working. to be better prepared to meet any potential emergency* situation that may ariseat the station.
This revised plan.contains many changes to reflect the criteria of NUREG-0654.,. We are prepared to meet and discuss any item or question you may have..
Qties.tions may be directed to*Mr. P.R. Beainent at (804) 771-4411 who is responsible for the* coordination of emergency planning for the. company *.
Ve~yours,
-~A. B~&-r--
c)!;~~utive Manager~Licensing.
and Quality Assurance
Attachment:
Surry Emergency Plan (lb Copies)
York County Emergency Plan (10 Copies)
Isle of Wight County Emergency Plan (10 Copies)
UNITED STATES
- NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MEMORANDUM FOR:
TERA CORPORATION FROM:
SUBJECT:
JXl2.
US NRC/TIDC/DOCUMENT MANAGEMENT BRANCH Special Document Handling Requirements Please use the following special distribution list for the attached document.
The attached document requires the following special considerations:
tJoo not send oversize enclosures to the NRC PDR.
0 Only one oversize enclosure was received - please return for Regulato/1 File storage.
~ ~:.zf.;c information - send onlylJ.~P§id.. i;.c;oo.JiY I
t* ~ to the NRC PDR. bt-t~.~ ?.R,vo.~,4.e/.
[] Other: (specify) cc: DMB Fil.es TID~~zed Signat