{{#Wiki_filter:...----------------------------- ----- I / VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 80-03 MAR.CH, 1980 APPROVED: ~Js~ ___ 7J ___ MANAGER
i - CONTENTS Section Operating Data Report - Unit #1 Operating Data Report - Unit #1 - January Corrected Operating Data Report - Unit #1 - F~bruary Corrected Operating Data Report - Unit #2 Unit Shutdowns and Pover Reductions - Unit #1 Unit Shutdowns and Pover Reductions - Unit #2
- Load Restrictions Due to Environmental Restrictions - Unit Ul Load Restrictions Due to Environmental Restrictions - Unit 1f2 Average Daily Un+/-t Power Level - Unit #1 Average Daily Un:i:t.?c-wer Level - Unit #2 Summary of Operating Experience Amendments to Facility License or Technical Specifications Facility Changes Requiring NRC Approval Facility C'n.anges That Did Not Require NRC Approval Tests and Experi.Eents Requiring NRC Approval Tests and Experinents That Did Not Require NRC Approval Other Changes, Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Limits Were Exceeded Fuel Handling Procedure Revisions.That Changed the Operating Mode Described In the FSAR Description of Periodic Tests Which Were Not Completed 'Within The Ti.rile Limits.Specified In Technical Specifications Inse...-vice Inspection Reportable Occurrences Pertaining To Any Outage or. Power Reductic1ns Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced *Power Periods - Unit #2 - Mechanical MaiD.tenance 1~~-*.. :_*-**--~---~----*-~--~*---~~--*.:_*~~* ~~*~-... ----*.:
.,,. ***--*---~***--*-*-----*-***---* -- l l.a lb 2 3 4 5 6 7 ~ 9 10 11 11 12 12 13 14 15 16 19 20 21 24 25 28
-ii-Section Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced"'* Power Periods - Unit #1 - Instrument Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Uni:t #2 - Instrument Maintenance Health Physics Sm:mary Procedure Deviations Reviewed by Station Nuclear Safety and Operating Committee after Time Limits Specified in T.S. - - - *-*- -*--*---~--~--,- Page 30 32 34'.*. 36 38 39
r ~--------:-- ~-
--~---*-*--- *------~-------------
e e OPER/J.TING D/i..T A REPOifl.' DOCF.ET NO. 5ew280 DATE 02 APR 89 COMPLETED BY 0.J. COSTELLO TELEPHONE 894D35g*3184 OPER/J.TING S'rATUS
- 1. UNIT N~E
- 2. REPOR!IING PERIOD
- 3. LICENSED THERJO.L POWER (MWT)
- 4. NA"f.EPLt'.TE R/J.TING (GROSS KWE)
- 5. DESIGN ELECTRICAL RK?ING (NET MWE)
- 6. MAXIMUM DEPENDABLE C/J:PAC'ITY (GROSS MWE)
- i. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 8e IF CHANGES OCCUR IN CJ;.FACITY RATINGS (ITEMS 3 THROUGH i) SINCE L/J..sT
.REPOR!l'. GIVE REASONS SURRY UNIT 1 3C18G TO 33180 2441 ,----------------------~,' 84V.5 INOTES I 822 I I 811 I I ,15 I
- 1.
NJA
- 9. POWE:R LEVEii TO WHICH PSS'?Rl.-CTED& IF }.NY NJA (NET MWE) 1CI. REA.SONS FOR RESTRICTIONS* IF ANY NJA
- 11. HOURS Ill REPOR!IING PERIOD
- 12. NUMBER OF HO!JRS REACTOR WAS CRITIC/i.L
~;*.
- 13. REACTOR RES'E:ilVE SHUTDOWN HOURS
. 14. HOURS GENER~..TOR ON.. IiINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. -GROSS THERMAL ENERGY GENERATED (MWH) 1~. GROSS ELECTRICAL ENERGY GENERt'.TED (M"wH)
- 18. NF:T ELECTRICAL ENERGY GENER/J.TED (MWH)
- 19. UNIT SEilVICE FACTOR
- 20. UNIT AV /J.IL/..BILITY FACTOR
- 21. UNIT CMACITY FACTOR WSING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NE'r)
- 23. UNIT FORCED OUTAGE R/J.TE 2'lo SHUTDOWNS SCHEDULED OVER NEXT 6 MONTES (TYPE,DK!E.).ND DUR/lfION OF EACH)
- 25. IF SHUT DOWN A:! END OF REPOirf PERIOD~
ES'rIMA!fE DJE OF STARTUP
- 26. UNITS IN TES'! ST/JSUS (PRIOR TO COM..~IJ...L OPER/i.!rION)
INITI/..L CiiITIC/...LI.XY INITIA'f: ELECTRICITY COMMERCI/J.L
- CJPER-fl.TION THIS MONTH YRsTO'llDATE CUMULATIVE
~44.0 2184.0 63i68.8 e.c 1016.2 39Y6V.B O.C 182.6
- 3V31.5 Q.O 1910.4 38915.4 o.e 183.6 3i36.2 e.c 2438340.e so1ss212.e o.o
¥85655.e 29466153.o G.O ¥46816.G 27913909.V 0.0 o/o ~6.3 ojo 61.0 ojo e.~ ofa 54.V oJo 66.9 oJo e.e ojo '44.1 o/o 56.6 o)o fi.G ~Jo '11.6 oJo 53.4 o)o ~.G ojo 53.V oJ~ 26.0 G}o REFUELING l<. £i,lse 11 6 J;1KS.. 4/20,180 FORECAS'l ACHIEVED
*-*--- -- -*- --- - -----*-*-**--**----- ----- -*- *--*... --- *------*-- -*-- -- - --* ----- -------- =--- -- *-. -.. ------~
-la-
- ... i OPERATING DATA REPORT CORRECTED REPORT DOCKET NO. 50*280 DATE 20 MAH 8e COMPLETED BY O.J. COSTELLO TELEPHONE 804~359*3184 OPERATING STATUS
- 1. UNIT NAME
- 2. REPORTING ?ERIOD
- 3. LICENSED THERMAL POWER (!.J.WT)
- q. NAMEPLATE RATING (GROSS MWE)
- 5. DESIGN ELECTRICAL RATING (NET MWE)
- 6. MAXIMuM DEPENDABLE CAPACITY (GROSS MWE)
- 9. MAXIMUM DEPENDABLE CAPACITY (NET MWE)
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT 0 GIVE REASONS SURRY 1t118C
.2441 84V.5 822 811 i 11 5 NIA UNIT 1 TO 13180 I NOTES I I I I I
- 9. POWER LEVEL TO WEICH RESTRICTED 0 IF ANY NJA (NET MWE)
- 10. REASONS FOP. RESTRICTiONS 0 IF ANY NIA
- 11. HOURS IN REPORTING PERIOD
- 12. N0MBER OF HOuRS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATO?. ON~LINE
. -15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS TESRMAJ.. ENERGY GENERATED (MWH)
- 19. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECT RIC AD ENERGY GENERATED (M"wH)
- 19. UNIT SERVICE FACTOR
- 20. UIIT AVAILABILITY FACTOR
- 21. T..,'NIT CA?ACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE~DATEeAND DURATION OF -EACH)
- 25. IF SHUT DOWN AT END OF REPORT PERIOD~
ESTIMATE DATE OP STARTUP
- 26. UNITS IN TEST STATUS (PRIOR TC COMMERCIAL OPERATION)
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION THIS MONTH YR~To~DATE CUMULATIVE V44.0 V44.0 62328~C 561.4 561.4 39313.0 182.6 182.6 3~31.5 556.1 556.1 38461.1 183.6 183.6 3936.2 133U413.e 133V4V3.0 89052345.0 430185.e 43C185.V 29110683.0 409019.e 4e9019.o 2gs3s91e~o V4.i o/o V4.1 o/o 61.V o/o 99.4 o/o 99.4 o/o 6V.? o/o ve.9 o/o 90.9 o/o SV.2 o/o 66.9 o/o 66.9 oJ.o 53.9 o/o 25.3 o/o 25.3 o/o 24.8 o/o REFUELING cTUNE 19 8 6 6. rvEEKS FORECAST ACHIEVED
r**. oommG D~A RB~ORT~lb-.. m t CORRECTED REPORT DOCKET ~o. so~2ac DATE 02 J..PR 80 COMPL~T3D BY C.J. COSTELLO TELE?HON~ 8C4~357p3184 CP??~TING STATUS
- 1. UNIT NAME SURRY UNIT 1 2o R~?GETING PERIOD
~. LICENSED THER~AL POWER (NWT) ~. ~AMEPLAT? 2ATING (GROSS MWJ) 2018C 24~1 847.5 TO 22980 ~-----------------------~! I NOTES I
- 5. DESIGN "3:LECTRICAI.: El:TING (NET NWE) 822 I
I
- 6.
~AXIMUM D~?ENDAEI.:5 CAPACITY (GROSS MW~) 811 I I
- 7. ~AXI~UM DEP3NDAB;? C~?ACITY -(NET MWE) 175
'--------~--------! E. -- nr -~~p~ a~n~- T~ ~t"'ACTmv ~Am-Ne~ U/fi
- 1.t vnP..1.:.;;_,-.,
~ *..,Lr:. -** '-'*--. -J.* n *..:..1 ll ~ (ITEJ.:.S 3 TEROCGE 7) SINCE LAST R?PORT, GIVE EEASONS o r,r,r1::-;:; r::-rr~'" :'T'r. "~T.~:::
- -
- ;o~"'~I~f!'lr;D 1-;;
- ~1v 1l'/A
-JG ..,,l/l'\\_:..,1 ,;,. *.'-~'~.;_* ....1..:.J '4f_~,,_....._
- ~-*1..*..1.l'r V""-_:
~ i':.r* ~* (!,:'ET g~;-;:)
- 10. REASONS FO? RESJ.'E.ICTICNS, IF ANY 11.,
.i.. Lo
- l;~.,..
- 14.
1 ~ 0
- 16.
- 11.
- 18.
1S. 2 C: 9 "L. *.
- 23.
240 HOURS IN i?PGRTIEG P5RIOD NUMBER OF HC[25 ESAC~OR WAS CRITICAL REACTOR ??S??V? 55UTDOWN HOURS HOURS GE~?RATOR cr~~INE UNIT 2ESE?V? SEUTDOWN HOURS GROSS TEER~AL ?~SRGY GENERATED (MWE) GROSS ELECT?.ICAZ ?N??.GY GENERATED (MWE) F~T ELEC~RICAL 3[5EGY GENERATED (MWH) U~IT SERVICE FACTOR UNIT AV~ILA3ILITY FACTOR ~NIT CAPACITY FACTOR (USING MDC NET) U~IT CAPACITY F~CTOR (USING DER NET) UNIT FORC~D OUTAGE RAT! SHUTDOWNS SCEED[:ED OVER NEXT 6 MONTHS (TYP~.DATE~AND DURATION OF !ACH) 2~. IF SHUT TJOwN AT END OF REPORT PERIOD, ESTINA.T-:: DATE OF STARTUP 2E. [NITS I~ TEST STATrs (PRIOR TC COMM~RCIAL OPERATION) INITil:L CRITICALITY I!,:I~I l:.L* ~IiECT.RIC ITY CO~M~RCIA: OPERATION 'C/A TEIE MONTH YR-TO-DAT! CUMULATIVE 696.C. 1111.!Q. c 63024.0 45~.8 1D16.2 39767.6 c.o 1~2.6 ~731.5 454.3 1C1C.4 38915.4 c.c 183.6 3736.2 1100861.G 243834C.O 90153212.0 355470.0 785555.C 29466153,C 33V791.C. 746810.C 27973709.0 65.3 o/o 9C.2 o/o 61.7 o/o ~5.3 o/o 83.2 o/o 69.9 o/o .E2.6 o/o 6.9 o/o 57.3 o/o CC n o/o 6~ 1 o/o Ch n o/o ...,_~,.. w*te-.
- 311,7 o/o 29.8 c*fc*.
25.0 c./c. R~FUELING JUNE 1980 6 W£gKS 'It_ FORECAST ACHI~V'g'D
I*---*----*- -- ------==-----*---*-* *==i ' OPER).TING D).T A RE'PO?.:f OPERAPING S'.V..Tl!S
- 1. UNIT N)NE
- 2. REPOK.fING. PERIOD DOCKET NO.
so~2s1 D/J.TE 02 APR 89 COMPLETED BY 0 *.J. COSTELLO TELEPHONE 804.35V"3184 SURRY UNIT 2 30180 TO 3318fl
- 3. LICENSED THE?.MAL POWER (l.f..tT) 2441 1---------------,
- 4. N AMEPL).TE R/J.TING (GROSS MilE)
- 5. DESIGN ELECTRICf:..L R/..!IING (N3:J: M"WE)
- 6. J.:i'.XI!{"l.ff.,' DEPENDABLE C/i..?!-El1'i (GROSS M"wE)
- 7. MJ..XIMUH DEPENDABLE C A?ACITY.(NET. 1-{l'/E).
- 8. IF CHANGES OCC-1.!R IC C/...PACITY R).TINGS (ITEMS 3 THROUGH 9) SINCB i.Jgp REPOI{I', GIVE P..EA.SONS 84~.5 !NOTES I
022 I I s11 I I 11vs I l NJA
- 9. POWER LEVEL TO WHICH iEST?.IUTED, IF ANY NI A (NET M'..rE)
- 10. REP.SONS FOR RSS'!RICTIONS,, IF /..NY NIA
- 11. HOURS IN REPO.-;;:J'ING ?'EEIOD.
- 12. NUMBER OF HOURS itE~..CT!J.~ W~.S CRITICfl~
- 13. REACTOR RESE?.IE SFl.!TVo;;?i HOURS l!J. HOURS GENKR)..TO?.. orr~ 7".L!{3
- 15. UNIT RESERVE SHUTD7.*lN HOURS
- 16. GROSS THERMAL ENERGY GZNER/..TED (MWH)
- 17. GROSS ELECTP.IC/....L ENERGY GENER/..TED (MWH)
- 18. NET ELECTRICAL ENERGY GENER Ii.TED (MWH)
- 19. UNIT SERVICE FACTOR 2D. UNIT *AV /J.ILABILITY FACTOR
- 21. UNIT C/>.PACITY FACTOR WSING MDC NET)
- 22. UNIT C/J.PACiTY FACTOR ([!SING DER NET)
- 23. UNIT FORCED OUTAGE R~.TE
- 24. SHUTDOWNS SCHEDULED OVER NEX.T 6 MONTHS (TYPE 9 D).TE 0 )JiD DUR/>.XION OF EACH)
- 25. IF SHUT DCTtlN.6.!l END OF REPOirl PERIOD0 ESTIM/>.TE DAZE OF ST).ImJP
- 26. UNITS IN TES'I STl-.TUS (PRIOR TO COMMERCI/>.L OPER).TION)
INITI A.T. C.P.ITIC ALITY INITI g, ELECTRICITY COMMERCIAL OPER).:fION THIS MONTH YRwTO~Dfl.TE CUMULATIVE 944.0
- 0. (l G.O
- e. e
- e. e o.e fl. 0 o.o
- o. e e.o Q. t1 c.e fj. 0 5/22JBfJ FORECAS'r 2184.0 o.e o.o o.o Q. t1 Q.fl o.o c.o G.e
- 0. f) o.o o.o fl. fl 60648.Ei 3!!499.9 D.O 33996.2 o.e l19194083-fl 25868844.ll 24536605.{l 56.1 o/o 56.1 o/o 52.2 o/CJ
- i.19.2 o)o 21.e ojo ACHIEVED
~*
- (~,..
I No. UJliOIC 8-5 3-1~80 f: forced ti: Schedule~ C"/77} -*~'.":-::~:u UNIT SHUTDOWNS AND POWIER REDUCTIONS . REPORT MONTll _r_1ar_c_h_l9_Bo ~. 0 c_ ro ":) !lll~ .~ t? ~ c
- 8.
... :I VJ Ill t? 0 J: :; ~
- I :i::
II.I ~..c r:: °' o-
- UJ A F
744 D 1 Reason: A~F.qulpment Falllftr~ {Explain) llJ-Malntenanc~ oi T~rit ('*Refueling Uccn~cc Eve111 Report# .80-018 D-Rcgulalory Restriction E-Operator Training & Ucens11 Examlnallon f *AdmlnlstraUve G-Operatlonal farm (IExplaln) H-Other (Explain) 3 5,1. e~ Ill "' ['ti t;; ')! J;*r.:;; E-::> OU u Method: R -Manual 2-Manual ScralTI. 3-Autumalic Scram, 4-0ther (Explain) DOCKET NO. 50-280 UNIT NAME DATE COMPLl!TEIJ DY TF.LEPllONE Surry Unit 1 4-1-8.;;.0 ___ _ O.J, Costello _ill04) 357-3184 Cause & f'orrect Ive Action to Prevent Recurrence . Continuation of shutdown for .*piping restraint nodification and turbine rotor inspection which began 2-19-80. 4 Exhibit G *Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG* 0161) Exhibit I
- Same Source
- e.
I w I e I i ! I I I I I
- t.
I I I t I 1: I: 1, I
No. l>:iic 80-3 3-1-80 F: Forced S: Scheduled qiJ/77) UNIT SHUTDOWNS AND POWER REllUCTOONS REPORT MONTll March l900 0 =- 17"0 '.)
- >fl...
.2 ~ 5* c ':.I
- 8.
"l:ll *-:"I ... :I ._g ~ ~ ~ .., 0 ~ 3x IU u.c c::: 0.._. lllf: ~VJ 31 0 0 s 744 c 1 Reason:
- A-Equipment Failm1' {Explain)
B-Maintenancc oi Test {'-Refueling Uc~mmc E*1e111 Report# D*Regulatory Restrldion E-Operator Training & License Examinalion
- F-Admlnlslrative G-Operatlonal farm ~Explain)
II-Other (Explain) I 3 ~ E*t ~"1 OU U &. 't;J ~)? ~8 ~ Cl) v Method: I-Manual 2-Manual Scram. 3-Aulomatic Scram. 4-0ther ( Enrlaln) i'JOCKET NO. UNIT NAME DATE C'.OMPUffED BY TELEPHONE 50-281 ~ 4-1-0,,,,.0 ___ _
- 0. J. Costello *
(804) 357-3184 Came & rlmecilve Acl ion I u . Prevent Recurrence Continuation of shutcJa.m for refueling and steam generator replacemomt which began on 2/4/79. 4 Exhibit G. lnslructiQns for Prrrarallon or Data En I ry Sheets for Licensee Event Report (LER) File (NLIREG* 0161) Exhibit I
- S:ime Sotm:e I
.i:-- 1
- 1 l' Ii
- i. I I
. F
- I
- I I
j I i 11 . ; I i
1-- LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS . UNIT N0.1 MONTH:.MARCH~ 1980 DATE I TIME HO~"'RS LOAD 2 MW REDUCTIONS 2 MW MWH REASON None d uring this reporti1 g period. \\'<, ~ MONTHLY TOTAL 0
~------~-~-----**.. ----~-1:..
LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT.NO. 2 MONTH: MARCH. 1980 DATE TIME HOURS LOAD 2 MW REDUCTIONS 2 MW HWH REASON I None c uring this. reporti ng period I I l I I I I I ! I i i I I I l I I I I I I I MONTlil.Y TOTAL 0
- ---*--*---~-:--*---*----*. - -*-**-***-**... *-**----.... ~...;...-**:---:..-..----.._.,.------~~-__._...,._. __ _,............_............ DAILY UNIT POWER LEVEL FORM INSTRUCTIONS e
DOCKET NO 50:280 UNIT SURRY I VATS 4t!1ir80 COMPLETED BY 0 J COSTELLO ON THIS FORM& LIST THE.AVERAGE DAILY UNIT POWER LEVEL IN MWE~NET FOR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED 'fO PLOT A GRAPH FOR EACli REPORTr: ING MONTE. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF THE l!NIT >> THERE MAY BE OCCASIONS WEEN THE DAILY AVERAGE POf.lER EXCEEDS THE 100 o)o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES. THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT. ANOMALY.
I I '---~- ****-*--**-***- --*-~-**- -******-*---- -***.. __ _, ________________.. ___ ---------*-**--*----~*---:- "f:1.Q."/i.Zil: MARCH so AVERAGE DAY 1 2. 3 5 6 i s 9 10 11 12 1S 14 15 16 DOCKET NO UNIT DATE COMPLETED BY AE~E~~! Q~ZLr ~MZZ fQ~~ L~r~L DAILY POWER LEVEL
- AVERAGE (MWErtNET)
DAY "
- Cl 111
- e. e 18 o.o 19 fi
- fJ 20 fl. e 21
- 0. el 22 G.I*
23 v.o 24 O.G 25 e.e 26
- e. fl 2V'
@., e 28 o.e 29.. fl 0 Cl 30 @ c (I 31 c.e ~. DAILY UNIT POWER LEVEL FORM INSTRUCTIONS 5 (h*2 81 SURRY II 4,,1.. so 0 J COSTELLO DAILY POWER (MWE!tNET) . l.D l'. e o.e o.o
- o. e
'* f) e.o 8.0 &l. I o.e G.O ft., O a.o
- O~ 0 o.o LEVEL.
ON THIS FORM,, LIST.PH'E AVERAGE Dli.ILY *UNIT POh'ER LEVEL IN MWE.., NET I'Oil EACH DAY :Ill" THE REPORTING MONTH. THESE FIGURES WILL BE USED TO PLO'I' A GRAPH FOR EACH REPORTY: ING MONTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITY FOR THE NET ELECTRICAL RA.TING OF THE UNIT & THERE MAY BE OCCASIONS WHEN ~.'HE DAILY. AVERAGE POWER EXCEEDS TEE 10C oJo LINE (OP. THE RESTRICTED POWER LEVEL.LINE). IN SUCH CASES. THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY..
:---- -----:.... -... - -----*--"'"-- - *--:-**** -*-***---~--*-------~... --.:..-...... _.. ;.... __ --**- ------.. ---* ----
A ~9-S'OMW.Y OF OPERATING EXPERIENCE MARCH, 1980 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in sign-ificant non-load related incidents. UNIT 1 March 1 March 31 UNIT 2 March 1 March 8 March 9 This reporting period begins with the unit at cold shutdown for piping modifications and turbine inspection. This reporting period ends with the unit at cold shutdown. This reporting period begins with the unit at cold shutdown, all fuel removed from the reactor and steam generator replacement in progresso At 2042 commenced pressurizing Unit 2.containment to 45 psig for Type A.test. Containment pressure reached 45 psig at 0707. March 16 ~ At 0210 commenced depressurizing containment. Containment over~ pressure (Type A) test aborted to allow repair of those leaks discovered during test. Another ~-ype.A test will be performed after repairs are complete. March 31 Th;~ reporting period ends with the unit at cold shutdown~
.. -........ -~~~*-*-**"*'.. "***-------~***'**.. -*--*-* ----** --~J--------..,----* ---------- ,AME11Dl.S TO FACILITY LICENg~-OR TEcm9...AL SPECIFICATIOUS
- MARCH, 1980
- On March 4~ 1980, the Nuclear Regulatory COiilI!lission issued Amendment Nos. 56 and 55 to the Operating License for the Surry Power Station Unit Nos. 1 and 2, respectively, which are designated as Technical Specification Cha~ge No. 63.
This change is the result-of an NRC request to add require-ments for low temperature overpressure protection. Of significance are the following changes:
- 1.
Addition of limiting conditions for operation of the Reactor Coolant System overpressure mitigating systE!Dl.
- 2.
Addition of surveillance requirements for the Reactor Coolant System overpressure mitigating system. On March 4, 1980, the Nuclear Regulatory Commission issued-Amendment Nos. 57 and 56 to the Operating License for the Surry Power Station Unit Nos. 1 and 2, respectively, which are designated as Technical Specification Change No. 64. This change*.is the. result of our request to modify our heatup and cooldown curves. Of significance are the following changes: L Revision of the heatup and cooldown curves.
- 2.
Revision of the materials irrad~.ation testing method.
- ~
IJ.;!TY CllANGES REQUIRD~G .... NRC APPROVAL MARCH, 1980 None during this reporting periQd. FACILITY CHAUGES THAT
- DID.NOT.REQUIRE NRC APPROVAL
- ~* ----*----.. **-
The following facilitY change was implemented during the month of March: ~sign Change. Unit
- 1.
DC-79-SOl - Spare Conta.inment Piping Penetrations 2 This design change provides for capping those unused piping penetrations which are presently capped only at one end (inside containnlent). The.. additional capping outside containment will insure compliance with Surry FSAR 5.2-10. Summary of Safety Evaluation The added welded caps to these penetrations do not create an unreviewed safety question since no new or intensified accidents have.been created and the defined margin of safety has not been reduced.
ST-35
- TESTS AND EXPERIMENTS RE,LING NRC. APPROVAL.
MARCH, 1980 None during this reporting period. TEST AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL ---~* ----------- UNIT NO. 1 Inside Recirculation Spray Pump Test was conducted on 2-08-80 on 1-RS-P-lA and l~RS-P-lB. the. purpose of this test is to provide data which can be used in updating the acceptance* criteria for the periodic test of this inside Recirculation Spray Pump (PT-17.2)
~13-e OTIIER~GES,.. TESTS.AND EXPERIMENTS MARCH, 1980 None during this reporting period.
SURRY POWER STATION
- i.
CHEMIS-TR.Y REP.ORT T..S. 6. 6.A.ll PRIMARY COOLANT UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINIMUM AVERAGE MAXIMUM MINIMUM AVERAGE Gross Radioact.-, it Ci/ml 7~'46E-3 3~01E-2 ' 9. 72E-2 + + Suspended Solids, ppm 0.1 o.o o.o + + Gross Tritium, llCi/ml + + Iodine-131, llCi/ml + + I-131/I-133. l * + + Hydrogen, cc/kg + + Lithium, ppm + +
- Boron-10,_ ppm +
416.89 253.82 364.266 + +- .Oxygen-16, pp!n I 1.6 .06 1.1 + + ~ Chloride, ppm .07 <.05 <oOS + + pH @ 25°C .5.25 4.52 4.93 + + + :&oron-10
- Total I'*oron x 0.196 Phosphate Sulfate 50% NaOH NON~RADIOACTIVE CHEMICAL (1)
RELEASES, POUNDS T.S. 4.13.A *.8 164 ~or on 70 169 Chromate 1.6 ~---...-~-----~--~~ 0 Chlorine 0 ~~~~----~--~- +.. 0.1 + I'.. + + + + 53.704 '\\
- '.{ :r
+ '<,05 4.85 - Remarks:_ Values for Primary Coolant Analysis reflect ~ 29 workday period for the month of March. The second & third were not covered due to snow.
- Unit _at cold shutdown + Letdown flow secured from sample room - only one local
- sample ~or the month.
(1) Bas.ed on these decimal release concentrations, no majo*r adverse environmental impact has been observed or is likely to result from continued operation of Units i* & 2.
DES.ION OF ~-INSTAl~CES WHERE e THERMAL DISCHARGE Lil1ITS WERE EXCEEDED MARCH. 1980 At 0515 and again at 0745 on M3.rch 16, 1980 7 the-temperature change at the station discharge exceeded 3QF/hr. At the times these events occurred both units were at cold shutdown and these events are a result. of the temperature detector coming out of the water during extremely.low tide condition.
- -** -* *-**--*-*----***-*****- *-----**.~~---**-- ------*- *--**--- ------***--
~CH, 1980 Sixteen (16) ne~ assemblies for Unit 1, Cycle 6 were received during March, 1980. ,r_. j.,
~ ~- -JJ-e UNIT . 1 FUEL "HANDLING !MRCH, 1980 DATE NO OF ANSI NO. NEW OR SPENT FUEL ~RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEl 03-06-80 8 LM08NL/3.2% 2.5mR./hr. LM08Ml/3.2% . 2. SmR/hr. LM08NB/3.2% 2.SmR/hr. LM08MJJ 3. 2% 2.SmR./hr. LM08N3/3.4% 2.SmR/hr. LMOBN7/3.4% 2.SmR/hr. LMOSML/3.4% 2.5mR/hr. LM08N4/3.4% 2.SmR/hr. 03-13-80 8 LMOSMH/3.4% 2.SmR/hr. LMOSNJ/3.4% 2.SmR/hr. LMOSMB/3.4% 2.SmR/hr. LM08N2/3.4% 2.SmR./hr. ~~ LM08Ml1/ 3. 4 % 2.SmR/hr. I LMOS!IB/3.4% 2.5mR./hr. LMOSNN / 3 *. 4i; 2.SmR/hr. LM08M5/3.4% 2.SmR./hr. t I I
-*--*--*-*-----c....-~.---.J--*--=-*-- --..... -**--*-* -******--*- ***-~-------- -- --*----**-*---- -*------ -------------------. dI'fu&%t&G
- Mlt Pr.H - 1 qso DATE I
NO OF SHIPPED/RECEIVED I ASSEMBLIES PER SHIPMENT ANSI UO. INITIAL ENRICHMENT I I None dur ling this reporting period . NEW OR SPENT FUEL SHIPPING CASK ACTIVITY LEVEI
- -----,..--~-.:.__---+-------i-----.-----._,,.....-.
-_;,.._---+-----------+-------r-------.--.
.--i---~~-+-_..,;_--~--r------**
' I ..;.__------+-----+------r----~,
PRocA REVISI~;:-THAT CHANGED THE e *. OPERATING MODE DESCRIBED IN THEFSAR ~CH, 1980 None during this reporting period.
i I I A A ~ESCRIPTION OF PERIODIC TESTS tJ'!rCH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS
- MARCH, 1980 PT-27.C The Heat Tracing Test was not completed on Unit No. 1 when scheduled (02-13-80).
The test requires verification that both channels of heat tracing are operable on lines containing 12% Boric Acid Solut.ion in eves and SI Systems. The test was conducted on March 14, 1980, 22 days beyond tqe 25% grace period. PT-44.1 The Piezometer Readings were not taken on the date scheduled (03-04-80). This test which documents the depth of the water table at Surry Power Sta.tion was conducted on March 31, 1980, twenty days beyond the 25% grace period.
!fARCH, 1980 Eddy current gaging inspection of Unit #1 Steam Generator tubing i~ complete. The inspection was conducted in accordance with VEPCO NDT Procedure 14.1. Eddy current inspections were performed at lOOKHZ and 400KHZusing .650,.610 and.540 probes. As a result of the eddy current inspection the following nt.I!!l.ber of tubes were plugged: 11A 11 S/G ~'B" S/G "C" S/G 11 18 25 Due to leaking plugs, 6 previously plugged tube ends were repair welded in "A!' S/G, and 8 tube ends were repair welded in "C" S/G in accordance with approved Westinghouse procedures. Eddy current *inspection of the main: condenser tubing, Unit 2, is in progress. Visual inspection of the Unit 1 Hanger M.Odificatd:ons. iS in progress.* The Westinghouse ultrasonic inspection* of fll and f/2 Low Pressure Turbine is complete with no reportable indications noted_. Magnetic Particle inspection of fll Low Pressure Turbines is in progress. The Westinghouse*Inservice Inspection per Technical Specifications on Unit 2 is in progress. J
IJNI'1'1w q/12/G8 <<lllAIN7'El'IANCE OF lUl'f'l:'T'Y RP.LA'T'F.TJ SYSTP.Hll. Dl/RING Ofl'l'Ar:lf OR Rll:Dr!Cl':TJ fflrl'ir:R lir:Rinn.tt~ Rr.'f.';'l>:fN Tlf SYS CflHf' HARKNO ,<;f!MHARY JIKl'r.T?F 03125/00 SI Pll'ING
- PERFORM ~lSIJAL INSPF.CTION CONDUCT VT EXAM NO t.tAKAr:E AT WtLDS 03)25/BD Cl/
PIPING PERFORM VISUAL INSPf.CTION CONDUCT VT EXAM NO LgAKAGE AT JlgLVS 03)25/80 RH ~'lf'ING l'ERFOllH VWllAr. IN!:t'F.C7'ION CONfJUC'f v*r F.X NI NO LP. AK Aa/r A1' IJ[f [,/J,'i 03!25/80 RS l'll'ING . l'ERFOllN VlSllAL wm*r.C1.'Wfi (,'ONIJllCT V'l' s;x AN NO 1.P.AKAr:E.42' wt um 03,125/80 FC rll'ING 'PERFORM VISUAL INSl'F.C'T'WN CONIJllC'T' VT l':X AM Nn r.r. Al(Af;K AT JfRWS 03.f25/8CI cs l'II'ING PERFORH VISUAL INRl'ECTION CONIJllC'f V2' ~If AH N(I U;Al{A(Uf A'f llEr.f/,'l 11ans111e RC PIPING
- Pf.RFO!IH VISUAi. U!!J!'f:[;TION COND//CT 'IT P.XAH NO. MAKAG!f A'l'.ll~Wfl IJ.'oU,'I' TOTA[,
- u MR TO'T'TNN?'M
' l H208100fl ~'12 l I02001801 692 1 Dl200D002 697 1 u11211nooo:i li'12 t 01170000115 li"2 1 002DllU011 r.n 11031!i1!iO!I !li12 IJ!l'lll e i N N I I I I i
,r Rfi:'l'SF:RVIJ'f 13/25/Rll oaJ25Jeg 03/25/00 . oa/25/oq 03/25.l.BO 03/25,480 Dli:Pl' TOTAL SYS COMI' Cll l'JPil'IG SI l'll'ING RS l'll'ING cs nrING RH l'H'ING CH l'.ll'll'IG UN1T2n ll/02/86 (/llAlNTENANClr nr SAIFF:T'f RF.C,ATF.D,":YSTP.MS Dl/RING Oli.TAGF. OR RF.DUCll:D WJIF.R PERIODS) MARNNO SllMMARY WKl'ERF PERFORM 'f]{SUAL INSl'ECTIOFI CONDUCT VT /l:HAM NO C,F.AKAGE AT WELDS l'ERFORH VISUAL INSl'ECTION CONDUCT VT EXAM NO C,EAKAGE AT WEC,VS l'ERFORM VlSIJA[, INSl'F.:CTTOfi CONDUCT VT /l:XAM NO MAflAGE A1' WELDS PERFORM VISUAli INSlfi.:CTCON CONDUCT VT EXAM NO LEAKAGE AT WE~VS l'ERE'Oi?M 'IISUA[, INsn:CTION . CON[)IJCT V'I' EXllH NO [,EAKAGE AT 1a:ws l'ERE'ORH 'Ill.BUAL INSlf!:CTION CONVUC'l' VT !:!(AN NO /1/l:AllAG/I: A1' W/l:/;vs II MR 2 ~02eeooo11 2 002fJAOOOG ~ oe2onontv ~
- 02001009 2
1117001019 2 l)O:tt!itr.1111 TOTIJWNTM q110 ~02 q9B
- 170
- 110 1!lR
....... 'l'l
- 1~!12 I.
N w I I..
J R:EPORTABLE OCCURRENCES PER.'!A~G TO ANY OUTAGE OR POWER REDUCTIONS - MARCH, 1980 None during this reporting period.
-~_,,..,... -.. ---*--*~-~--=----- -:....: ___..:.. --- --. ¥..aintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT Ill Mechanical Maintenance . ____________...:...*~-- :- :..-
VP.IT"'MECll ~ Al~ RO ~ 121311 TW 1'/IGF. 1 UNIT1.. 111112/eo ~HAIIVTENANCF. OF SAPP.TY R'f.f,ATF.TJ SYST.r::MS Vl/llING 01/Tt.riF: OR R'f.TJTJCF.TJ l'OWF.R rrmcnns> RTi;'l'Sl':fi'V TYI' SYS com* MAI/KN() Sl!MMAR'I WT<T'fWF fl Mii TOTTIWN'I'M OJ/OIJ/00 Cll l'IT'ING a.. c11,,99 lJC ~!l.. S32C INSTALL STRAP CON.'l'T'llAINT COMT'[,/l;'n:n 1 1102101:1119 312 IJJ}OIJ/80 cc PIPING 1;.. cc.e1.. 1s1 DC 99,,532c Sf/IM com*r, rsTP.: v 1 002251711 l so 11a/oq/eo cc. l'lf'ING s-cc.. 01 DC 99.. SJ'JC SI/IM cm,,*r.1r.*n:D 1 002251912 111'1 13/0!i/RO 17L l'll'ING 3.,RL*'ii DC 99.s:12c INS'fA[,f, srRAP CONS'l'RAIN'r com*r,r.*rm 1 0021013112 t9:7 03/0!'i/80 vs ffl,To".:R i.vs.. r.. n REl'f,ACF. ni*rr.n c11ANrm11 nr:rr.ns 1 ooi2'11 t1Jo 165 e 13/06)80 MS* VALVF. t*MS,.5 R8SF.AT + RP.l'ACK RF..'l~,'A'l'IW ANIJ RF.l'ACKTW VAt;VI\\' 1 1102nocrnr. 1Yl1 03/06/8~ MS VALVE 1"HS*1 RESEAT ~ RF.l'ACK llfo.'SP.A'l'F:D AND R,:1*ACKF./J VAJ,Vf. 2 ~oin";39 lYl'I 03/10/00 CTI l'I1'ING a.. c11.. 99 VC 99*53?.C INSTALL STRAI' CONSTRATNT CO/lfl'Lr.Tf.TJ 1 11ono1:111v 1166 03/10/00 cc f'IflNG l!i*CC.. 98/81!1 DC V9mS32C RF.HOVE CONSTRA£NT COMl'Li!;TF:TJ 1 lll!l221t*111R 2!17 03)10/80 cc nnrm 15.. cc..ts6Jt60 lJC 99~S3'JC REMOVF. CONSTRAINT COMrL&TED 1 00:121111119 n11 i3/1'/8flJ Cl/ Pll'IWG 2 1)2'1CH vc ws~s3?.C iN5TALL CON.~fRAINT C(}Jlfl'L'i:TTW 1 0022!i170'1 2811 03/111/0fl Cl/ PIPING 2 1/l~CH VC V9~S32C INSTALL CONSTRAINT CO/lfl'L'g'!ED 1 !902251'100 3fl0 03/1"/88 cc E'Il'ING 18*CC*1!i INS'.lALL Sf1IM COMrLETeD 1 9"'2291318 i22 13/111)81) Cf/ rI1'ING a.. c11.i.. 1 so2 INS'.lALL STRAP CONSTRAINT COf.IPLF.:'I'EfJ 1 fl0229132V
- 122 113/10/80 CH 1'IPIHG 3.. c11.1.. 1su INSTALL CONSTRAINT COMPUTED 1
002291331 119 03/12/BS SW MOV Hov.. sw.11sB V AL'IE BINDING REPAIRED VALV~ 1 9121!211101! 388 03J13/80 RL f'IE'ING a.. nL*G VC V9*832C INS'.lALL CONSTRAINT COMPLET/l:D j\\ 002181333 53'1 03/13/88 CTI
- l'Il'ING 2*C:H.. 2111 DC VSmS32C INSTALL STRAP CONS'lRAINf COMPLETED 11 Oll21R13!il!
369 03)13/90 Cll Pl1'ING 2*Cllrs21q DC f9uS~2q INS'rALL STRAP CONS'.lRAINT COMPLETED 1 002181351 369 03/13)80 RL rIPING a.. RL*G DC 99.,s:i2c INSTALL STRAP COWS'.lRAINT COHPLf.'fED 1 092181356 393 I N 13/13/Bf VG VAL11F: nv.. vr...io2 FLANGE Lfi:AK RF.JIORK.'fD AND RESEATP.D VALVg 1 GIJ'J23135!1 123 °' 03)13/RO Cl/ rIPING 3.,cH.. 99 DC 'l9wS32C INSTALL CONS'l'RAINT. COHl'Lir.TElJ
- 1 00225171!6 360 I
03/13/80 cc l'Il'ING 1h*CC*21J8/2119 DC 99~S3?.C INSTALL CONSTRAINT COMl'LETF:D 1 !102251913 Jfj9 03/13)80 Sf{ TIX t.CC*/?"18 REFURBISH HF.AT EXCHANGER REFURBISHED HX 1 H3H1831 'Ill "3/111/80 Cll VALVE iwCfle:!28 HUPl'URF:D DIAPHRICM R~l'LACED VALVE 1 0031311*10 217 03/1q,1eo cc l'lPJIVT 1*s.. cc.112 COPPER TUBE BROKE RF.:PAIRED TUBING jl. 0!1313111115 "3)20)80 Cll PIPING 3*Cll* ht 562 INSTALi STRAP CONS'lRAINT COMPLETED 1 11022913?.9 360 1Ja;20/eo Cl/ l'IPING 2 1/2wCll lNS'.lAiL STRAP CONS'.lRAINT co.lf PLf.TED 1 1102291332 190 e 113/21!/BO SI rlPil\\'G
- i.. shv2.isoa DC 'l9*S32C INSTALL CONSTRAINT COMI'LfSTIW 1
0113111332 1911 tl3/20/80 CH f'Il'fiVG 3.. c11.. 'l 9*1 sea VC 99~S32C INSTALL CONSTRAINT CO.llPLETED 1 003111333 190 03)20/80 RL Pli:'IiVG 3*RL.,6 VC 19~S32C INS'.lALL CONSTRAINT COMPLETED 1 00311133'1 190 G3ft;?!J/80 RL
- f'IrING 3*RL..:ll DC ~9*83'.C INSTALL CONSTRAINT COMPLF.TED 1
0113111335 190 193/21/1!0 FC VALVE 1.. FC*'J!i SPENT FUEL l'IT FLTR VLV LF:AKS RF.PT.AC8fJ VALVE REM:R ROD 1 IP0229061!i 212 r~ 03/21}80 SW HX 1.. cc.E.. 1c RF.FURBISH llEAT EXCHANr.ER RE8l1R8ISHF:D Hf.AT EKCHANGER 1 030'111>31) 196 i 03/23/BO [); FUM!P t.. [J.1.p.. 5B *" l'UMl' WILL NOT ROT ATE. f'Uilfl' GOOD TWT UN ON OIL 1 0032223S!i 3 ~-* 03/211/B'J CH l'IPWG 2.c11.. 122 DC 99.. sa2c INTALL CO~STRAINf COrlfrLfSTF.:D 1 002181336 fi!lfj 03/24/BO CH E'IPI1VG 3*Cf/*1,.1502 INSTALL S'rRAI' CONSTRAINT COMI'LE'fF:D 1 002291328 q56 03/211/BO Cf/ 1*r.rwr.
- M.'11*23 VC 7!l~.'l32C IN.'!'fALL CONSWAINT C(}/lJl'LF.Tll:D 1
OOJ1113:J1 21111 03/211/00 Cl/ l'll'INf; a-c11.. *1 g DC 79,..<;3').C JN,t;'fAU, CONS'rRAT.NT C(Jiltl'LETF:D t 003111522 169 03J2q/eo cc f'Ir!NG s~cc.. e!l DC 79.. s32c INSTALL CONSTRAINT COMPLF.Tr<:D 1 003111523 169 03/25/~0 PL 1'11'1NG 2pvs.. r.:.. 1111... c 118.. ROUT rif'F: RF.ROUTW l'II'E 2.. v5.. r,.. qAc 1 003t1112Ci 6 03/25/80 Cf/ Pll'ING a-c11,,.19 DC 19.,S3'2C INSTALL CONSTRAINT Ct,,. l'L5TF.D 1 003111!i21 190 1)3/25/80 cc l'll'ING 5,,cc.1ss DC 99... S32C INSTALL CONSTRAINT CONPLE:TTW 1 003128936 190 "3/25/80 cc l'IrING s... cc.. rno VC 99*S3'2C IN,'i'l'AT.L CONSTRAINT COMI'LETT!:D 1 003120937 1!10 03/25/00 IA VALVE 1.. JA.,925 TRAP LU1KING RP.SOLDERV ARr.A L~AKING 1 003191200 120 03/26/BD fl/ INS'ri/ MANUFACTURE Tf/RF.ADF.:TJ f'Il';;s.(2~) MANUFAC'f/JRF.:V l'IP!':S 1 0032!i1319 7 03/27/80 IA CO/lff'R!'::SS 1.. 111.. c.. 1 f/AMM!iRING NOTSP. INSI'F.CT8D mrm NOTTIING flRONG 1 0113750601
" -' -!* '~. UNITh qJe21eo (HAINTENAlfCfl: Of,<;P,Ff.'fT Rtr.LATF:O !iYSTF.H,r; TJl/RlNG OClTllGfl: <1R Rfl:TJfJC'f.11 r<JJIF.R l'P.RinTJ,<;) RF.TSF.il'l TYi' SY,<; CON!!' rWiNNO SllHHflftff WNPF:llF 03,128,IOCI re Pli'lffG ll2*Fl'*1 DC 99,.93211 INS'rALL CON.'iTR/llff'f COfW£,HTP:D 113,128/80 cc l'Il'lNG 6*CCw89/!DW INSTALL CONSTRAlNT COUI'LETED 1!13/28/00 CH l'll'J.NG 3*CH*'9 - DC 99*S32C INSrALT. STRAP CONSTRAINT COHI'LF:'rf.TJ i'i3/28,l80 CH Pil'ING 2.. Cl/*99 DC 99~S32C INST/ILL CONTRAINT c°"rnrm:o 03/28/80 Cll l'll'ING 3,.c11.vg DC V9uS32C INSTALL CONSTRAINT COMl'T.~:TF.D 03,128/8" CH l'll'lNG 3*Cf/*99 DC 99-S32C INSTALL CON!iTRllINT COHI'Ll\\TF.IJ 03,120/80 CV PU'ING
- 811CV*D*151 DC 99~S32C INS'fALL CONS'fRAINT COHI'LETl!:D 113J28,l8Q RC f'Il'ING ll*RC,.111+115 DC 99~S32A MODIFY CONSTRAINT COMl'C.ETED 03)28/80
[;[ l'Il'ING 3.,,r;1.ve DC 99,.532c INSTALL CONSTRAINT COME'LTITF.D 113/28/80 Cll rll'ING 3cCH"1 DC 99~S32C INSTALL Sl'RING 11/INGER COMPLETED OEPI' TOTAL 7 Al'R Iii! 6 12131! I'M T'.~llF: 2 ll HR 'r(]T/Jf/N'r!.f t oe22111131 30R 1 ll02291326 5!i8 1 11131115Ui '2'1tl 1 1103111519 271! 1 003111518 '2'10 -1 OOJ111!i19 2U 1 110321111116 103 1 00321111126 103
- a 9132111~116 1113
- a 1103201~~'1 1G3
""e***11c 6*"""" e I N -.J I . " l I I I
¥..aintenance of Safety Related Systems During Outage or Reduced Power Periods Mechanical Maintenance
.. __ __._:;._. ______ ~ *.--., __ -- i
lif"T!~ , I Df.1'1'.. M.S:C II 2 Al'R es <I 121 '*II l'M .f'AGT\\ 1 UNI'r:l* ll/tJ'J/n; (MATNTENANCFr OF.IAFJ!:TY R'P.T,ll'f'!W,r:Y.'iTF:MS DURJNG otJTAGr. OR R1':f111CF:D rorll':R rr.RinD!I) Rr.rsr.r.v 11r S'IS COMI' MAfl<<NO llt'MMllR'f Wl(1'F.8F fl MR 'f'O'f'/NN'f'M 03/111/80 Rll l'IJt 2.. Rs.. 3.. 1c fll'l'ER FLANG'f. ON fl,<;,<;IfJf. T.F.AKS TIGllTri:N FI.ANG~ 'J on:n91 '1*111 f\\O O:J/02/80 IA VALVE 'J,.IA11'93 C.EAKS TllRU REl'TiACf.D VAl.V.-;" 2 1102281522 1211 113/05/80 vs flLTER 2.. vs.F..t111 Rf.l'LACP. Fit;TJr.fl CllANGF:fJ FllrTERS 2 llll229111:li 1'111 03/05/811 cs V llLV F: 2-cs.. 2*1 OISASSF:Ml/T,E CU1.AN REl'AlR CU AN ED.lN'ffl:RNALS 2 002291106 163 03/0!i/OO Ill VALVE 2*IA*70'1 PACKING 4 llOllY TO llONNE'f MAN RF:l'AUlfl:D U:AN 2 00301tV31 2*1 03/05/8$ CV VALVE ncv.. cv.. 2111 STF;M LP.Ill( ON 11cv-cv.. 2110 llf.f'ACKi'm VALVF: 'l 00311UV33 211 03/05/80 RS Vllf.VE 2*RS*11 PACKING GLAND NUTS MISSING lN!i'f ALL~fJ NUT 2 1031120!JO!'i 2*1 03/t6/BO RS llX 2*RS..E.,1C INSTALL Sl'ETACLE Fr,ANGF: COMfr.F..'TEfJ 'l 1111n nnu J(itl 113/!16/80 RC 1NS'l'1'1 t/i';.2.*183 LW l'RES,<;SURE VENT ll&'fAl'lISD CONNfoX:TIONS 2 111:ie*11:i:i11 1'1 03/09/80 vs FILTER 2.vs.. r.1c CLEAN OR REPLACE FILTERS REl'LACED FILTF:RS 2 OOJl'ltl!Ot! 33 !13/fl'l/BO vs FlL'fER 2.vs"r.111 . CLfi:AN on REI'L/ICE FJr.TER RF.PLACED FILTERS' 2 !!030111001 31 113/10)80 VS l'Il'J.NG Mov.. vs.. 201 IrlSTllLL fLANGF. RT':MOl(f.D FLANGE 2 10228120'1 780 03,#11/811 cs VAl,VE ' 2*CSw13 DISASSEMllLE Cf,EAN AND REPAIR CLEANED AND INSPECTED 2 1112291115 129 03/10,IBri IA VAZ.Vii: 2-IAw86'1 2wIA*B6q HAS BODY TO BONNN'FJJ' LEAK REl'AIRED B TO B LEAIC 2 I031111'138 1111 03J10Jeo BD VALVE rv.. oD.. 20118 ADJUST PACKING Rll:l'ACKED VALVE 2 093DV1100 68 113/10/80 RS VALVE 2.R.r:.11 REPACK OR ADJUST AW 1'/l.CKING 'l 0030'110118 6'1 i 13/12JAO BS !'Il'lNG DJC,9.. 01 INS'f ALL l'Il'E I'WGS INSTALLED l'EN CAPS DC 99*91 2 905250!10!1 3581 03/111/80 cc INSTR ri.cc.nnc REMOVE SIGHT GLASS INS'fALLED N'FJI SIGHT GLA,t;S 2 9110!i!19fl0 1656 113/18/80 RM MONITOR UN Fc.fH Tl/ROUGH MONITOR REPLACED l'fJHI' 2 H221097tl 111 I oaJ1eJeo cs l'Il'ING Mov.cs.. 2ei1J INSTALL RJ,ANK FLANGE INS'f ALLED BLANK 2 H22812ll0
- 101 N
113)18/BO cs l'l'i'ING Mov.. cs.. 2118 lNSTALL '1hANK FLANG~ INSTALUW '1LAIVK 2 111220! 2111 40!! \\0 11:1,#teJot cs l'Il'ING Nov.. cs.. 201c INSTALL BLAN~ FLANGR INSTALLED BLANK 2 902281202 llBI! I 03/18/8rJ cs Pn'lNG Mov.cs.. 2110 INSTALL PLANK fhANG~ INSTALLF:D BLANK 2 8022012!13 48!1 13/1!1/Bll l'R SIVU88fl>R ao.. SHPv103 CHECK FLl/ID LEVE£ INSPECT~fJ AND REP£ACED SNU888R 2 1111319119112 3fl 03/l9)8' RC rr /Ji.:rm 2*RC.. 52 VALV~ RAS PACKING LEAK REPACKEO VALVE 2 91213!190q 2352 03,121/BO RC '{liDr/i'~ 2*RC*19 BROKEN rACKING FOLC,OW~R REPLACED 2*RC*19 VALVE 2 912311513 1922 ~3/2'J/80 RM l'UMP RH.. va.. 10~ MOTOR rO VACUUfli'WMt' Rti:PLACED Bf.LT 2 9113229551 6 03)22/00 SS ff![,Vfl: rv.. ss.2n EXCESSIVE LEAKAGE ON fT 16.4 REI'LACEV :,ILVF. 2 909131819 51811 13/23)80 F"I MDV MOV
- F'fl., 2 511!
Rtwovr. NOV FOR USE ON UNIT 1 COMPLF:TEfJ 2 1901tl620q6 186!i 03)211/80 'l'G v tir:ns 2*IU"153 VALVE NAS RT"'11N DIAf'NRN:N REPLACED DIAr.RRAGN 2 1102260930 236 03/211/BI RS l'If'lNG ?*RS*lr.*1A Ff,ANGTS LEl.K REE'LACED GASKET 2 ltJ311!i12tltl 51 03/25/BO fH OT!i?.fl RF:MOV~ TRl.NSF8R TUBE BLANK FLANnr* R910VEV BLANK FLANGE 2 to:fa11en2e 11 o3J2SJoo DA lNS'rlJ f.'l'*DA*2H CONNECT ROD TO FLOAT F.'IX f'f,OfiT 2 0032*mu ~ 0312SJeo RC !'MP f(fR 2*11!:*P*1A INSrEcT f'UMP MOTOR SEALS COMl'LETED 2 902051111 9Btl6 e IJ3A25/BD RC l'MP flrl'R 2*RC"P"1A.. REMOVE 2"RC~P*1A MOTOR COMl'LETF:D 2 9020511122 98W8 D3J26/BO SI VALVB w.. 2os9 REMOVE RELIEF VAC! RTmOVED RK!UF VALVB' 2 H72*1133tl 935 t3A26Jeo cs 'l'ANK 2.cs.rK.. 1 OPEN FOR INSPECTION Rfl:PLACl'm NANWAY CO'lr.R+TIGll'tElf 2 00319113'1 169 113)2V/80 cs VA.i;v'E Mov.cs.2010 lNS'fALL srECTACLE FLANGE RF:MOVE SPECTACLE F£AKG! 2 093191151 199 03/2'1/0Q DA f'if l'I.VG 2*DA*!'i3 INSTALL TT!:..<;T FLANGE COHPLE'fF.D 2 Ol31!111!i9 q9 03/29/BO cs . 1'UMP 2*CS*Pw1A l/NCOUI'l,I!; !'UMP FROM MO.TOR UNCOUI'LJr.D 2 0032611100 33 03/29/80 cs V11LVE MOV"cs.. 201J1 INSTALL SPECTACLE FLANG~S REMOVED SPECTACLE FLANGE 2 003191150 225 03/31/80 IA COMi'RESS
- i.. IA11C"1 SEAL f,Elli'C REPLACF
- D VALVE 110.3250600 120 DP:l'l' TO'fA[,
\\; ~ Y.:.aintenance of Safety Related Systems.During_ Outage or Reduced Power Periods UNIT Ill Electrical Maintenance
~ " - ~. OEl'l',.F.LEC 7 Al'R 9IJ " 121311 l'M l'AGF: 3 UNlT1* *1/fl2}8fl (MAINTENANCE OF SAF'f.'T'1 Rfl:LA'fF.D SYS'l'FMS 1'l1RlNr. 0/1'/'AGlf on* RTWUr.F.n IYJJIFr.R rrr:RIODS) RF.TSP.RV IJT S'IS COMl' MARl<Nfl smm11R11 llKl'F:RP fl MR 7'07'11WNTM 1'13/05/00 MS MO'IJ Nf1V *HS"1 O'l/ 11.U.L on:w ONT.Y 1/lf IWCll CrJHl'liP.TF:/J AS f'F:R fl:Hr.. c.Hnv.. 1 htR 1 081230'1311 1!108 03.'05/80 FW VAL'll'f: FCv.. 1w.. t!iOA MAIN FEED PUMP RECIRC VALVE LIMlT SWI'l'CllES AIJJUS'fED i 111'12202018 221 03/H/Bt HS NRV NRV*H!i*101A VAliVW 'JIILL NO'/' nn:nATfl: ET.F:c VAf.V/I: RF:TllRNED TO SF.RV ICI': 1 11122tl1Vt!O 3Rll 03/12/80 vs FAN Wl'R 1.. v.o;.f.,'IA FAN MTR ll8ARING NOISE n.r.:PArR.F:IJ llRGS ANO RUNS'l'ALLl!:D 1 912202325 11mo 03/13/80 Cll . f/'f CH'f2111'N1!1 STRIP llF.ATF.llS DEf'F:C'rIVF.: 11~:1'[,ACtn llF:AfERS AND.7'/lf':llMOSTATS 1 D03100930 69 03)18/00 1111 llT Rtl'AIR CIR lf.4 l'NL 8 R,:N.EWF.:IJ f/F: AT TAl'T~ 1 0072911135 192 03/18/80 Fii l'UMl' ll..,.,...,,,.,39 NO.. LOAV /IMPS PI CURVE SAT 1 OO:t011!ilf6 26 03J10Jeo E'C Rl'l RrI*1 RICK DOOR BOWKD IN HIDDLI! ADJUSTTW 3/15/U 1 0931211011 133 03/18/BD
- rr:
Rl'I Rl'I"lf BAC~ RICK DOOR NOT CLOSING AIJJUST.S:n 3,l15/0e t 0113120802 133 13/18/80 Cfl llT CK'l'qAl'NLIJ REPAIR HEAT TAPE RENEWED HEAT TAPE 1 oo:J11111015 91 !l3/18/BO CH HT Cll.T'1'.ll'NL9 REPAIR HF.AT TAPP. RP.NEWED llEAT TAI'E 1 0031110816 96 03/19/81!1 CH llT CKT25l'Nf.9 REl'LACE llEATER RF.PLACED B'J'Ril' HEATERS 1 003131l916 28 03J19/8t CH llT CKT.. 25PNLS REPLACE HEATER REl'LACF:D SfRIP HEATERS 1 003130920 . 28 03/2!/Bt Cll HT l'NL 9+9 CICTS9JJ. CIRCUITS HAVE £(]';1 AMl'F.RJr.E TESTED SAT 1 00311101139 139 03)'.tlfSO Cll /IT 1'NL9CKT'I REPLACE HF.AT TAPE TESTED SAT. 1 1031111105 139 03,12a;ea BS HT CKT15PNL1U RF:l'Lll.CE Hl':ATER CK'l' 15 l'NL iiJ INSTALLED NEY I/EATER 1 0031521115 111 ll3,l23/80 Sf! Dli':SEL 1.. sr.r.. r.u DIESEL rlJHl' rlILT, NOT START . REl'LACED BATTERY WG 1 003222315 5 f13J25/90 CH llT CKT 2118 REPAIR AT CKT 2118 l'ANEL 8+9 TESTED SAT i 11121181251 1111'1 113/25/80 Cll HT REl'LACE EXISfING HEAT TAPE COMPLETED SAT 1 H22112DO 117 i G3,l25/89 CH llT REPLACE EXI!iTING f/EAT TAPE C(X.fl'LETED SAT 1 H2211201 11'1 w 03/26/80 CTI HT REPAIR BEAT TAl'E TFSTED SAT 1 003021259 !i79 ~ 03/26/Bfl CH II'! REPAIR OR REl'LACE CIR 2118 PNL'.'J TESTED SAT 1 0031911031 182 I 113/26/81! SI HOV HOV"186'1C DISCbNNECT FOR MECH RECONN1X:TED /lfOV 1 003180'1112 1'1'1 fl3/'l5/8t SI MO'lf MOV*l969D DISCONNECT FOR HECll RECONNFCTED HOV 1 H3180~113 199. C13/~6/8f CH HT PNLCKlw'1311 R8PLACE HEAT TRACING TESTBO SAT 1 0032596115 31
- ~*"*
DEf'I' TO'f' AL 66911
___ _.,___._ -.:-- --~---*--*-------------*- - ~..2.intenance of Safety Related Systems During Outage or Reduced Power Periods UNIT /12 Electrical Maintenance
I Dr.t'f's'f.Lfr.C 2 ArR l'lfl,.. 171*111 rM 1'AGF: 2 UNIT'J., *1/C2J8fJ JHATN'l'ENANC~ OF f1AF1r.TY Rtr.T.ATF:IJ SYSTF.M,<: Dl/RING OU'I' 11Gll: OR RF:lllJCF:IJ mr.JP.R l*S:RJOTJt:) Rr.*rsr;IV 11r SYS (.'(JP.I]' MARP<NO !illf.fMAR'f
- Wl'if'TifiF'.
II Mt7 'f()'C/1'./N'rM tl:l/05/RO ns oru.-:11 Tl/I: f1TV',r, rn fir17AY RINr. c Anc.r.s 1Jl!iCONNF.:C'fF:O 2 '0'1011111 9'1 03/05}00 Sii nov ~IOV,.,r;w,. 21111 D HOV ff.IS l'f.RE'ORHEn AS l'F.R mr.. 1*.. Mov.. 11 !j.,1 n 2 901251530 528 03/07/R!I ,r;r 11'8' Cl<'l'*l*l'NL 11 RF.l'LA<.'E 'H'il:AT TRACING RF:l'LACF./J TAl'Tr. 2 11!12171131 1100 03/0'l/ll.ft SI llT Cl<'f'l1.rNL 18 RF:PLACE HF.AT TRACING Rf.f'l,ACP-D 'f Al'E 2 11171'1'31 1!05 O:l/tt/80 SI /IT l'Nf,10.CKTlB REl'LACE iJAD llEAT TArllJ RF.'1'(,AC!m TAl'E 2 !l0701iBriO 5011 113/Hl/80 SI HT rNL11wCKT1B REPLACE lJAD HF.:AT TAl'E REl'f,ACED TAl'E 2 002or.1551 !iDCI o:i/toJee El'DC nA'r1' A GROUND ON SYSTEM INDICATED COllRF:CTF:D GROUND ON.IJC f,JGTJTING l! Ot2202t!'i!i 289 03/10/llO RC 1"1.R ll'IR 2 C11ECK CABLES NO DAMAGJI: 2 003010700 210 03/10}80 ErDC BATT EG0-2 l'ERFORM AT 23. llC rr.RFOl/f.f!W T'1' 2 91111!111102 ?.9!i7 03/12/80 RT RF.LAY 25C:l RT ms l'.r>:RFOii'MED F.Mrel'*RT,.6!1 SAT 2 9012611115 '1920 i lil:J}12/BO RT RELAY 25113 RT l'MS COMPLETED KMl'*P*RT*70 SAT 2 90121WI 16 '1920 el 03112/811 RT RELAY 25113 RT ms COMPLETED EHP*P*RTs*1 SAT 2 91112fi11117 '1!120 fl3/12/80 RT RELAY 2B UV RT ms COMPLETED EMP..PwRTw1112 SAT 2 9012611133 8136 03}12/80 RT RELAY 2581 RTfflS COMPLETED EMP*P*RTw1115 SAT 2 9012611136 12!i 03/12181 RT RELIJY '258'1 R'1' m,q COMPLr.l'ED EMPwP*RT*162 SAT 2 9112611151 17.6 03/13/80 CH HT CKT 28 REeINSTALL.REAT THJK:ING HEATERS RF.PLACED HEATERS 2 907oqeo:io 568~ 03/211)811 EPR BREAKER 25A3 BREAKER f'MB PM COUPLET.'!: 2 901251313 9501 03J211/80 El'fl fJRIW!ER 2583 BREAKER ms ffl COMPLETE 2 91112!i1372 96Cl'1 03"211/80 EPll BRF.:AKER 2!iB6 BREAKER ms PM COMPLETE 2 911251325 91109 I I 03}25}80 FW HOV 111ov.. w.. 2s1a-DISCONN'EX:T MOV FOR MECR~NICS RECONNECTED AND TESTED NOV 2 0010620115 1182 w fl3J25J88 SW MOV MOV*Sfl.,2138 DIS:ONNECT + RPX:ONNECT FOR HECii OISCONNPX:TEO MOVwsr/*213 2 91122211BClll 911!1 w 03fl25/81 SW MOV MOV*Sfl,.203A DISCONNECT + RECONNECT FOR MECH Dl!X:ONNECTED MOVwsrlw293A 2 02221809 9110 I 113ns1ao f'W MOV HOV,.Ff1*251E MOV ms PERFORMED ms ON HOV 2 9012511110 9V86 Dll:f't TOTAL ' j I 1: 1
~..aintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT /fl Instrument Maintenance
] DEIT.,,INST. 2 lll'R 118 " 121:1*1 rM I'AflF: *1 I* VNITi.. *1flrn/8t '\\ (HAlNTENANCE OF !UlFF:'T'Y RF.LATTW SYS'l'F:M.'J D/JllING 01/'l'AGTs: rm RP:IJTJCF:n r<JTIF:R T'F:RIOVS) RfffSF:RV /1f .r,y,c; COM1' MARii NO 81/MMARY Wlll'F:llF u Mii TO'T'INNTM 03/0G/OfJ MS lNS'.fR 1*1.. 1.. q911 FAILF.D llIGfl CflF:CKIW TRANSMITTF.11 CAT.InRATP:/J ll 000311355 23 113}06/90 NI MISC Nlla'l5 BWE CllANNF.:L DOES NOT INN. rROl'EfiT,Y . fiF.T'f.ACE/J DfilVE MOTOR 1 002291139 2S 03/t*1Jee RC lNSTR '/'11118 RODS S'n:r 01/T J/1'1'11 NO VF.VIA'fION Cl/P:CllTW SY!iTF.H ANV E'OUNV NO rnnnum 1 001292JJIJ USG 03/111}80 RC INSTR TF."1"'118 FAIUW frfTJ INSfAf.f,E/J RTIJ I'F.RFORMIW CALWllATr:D t0'.11911820 911 03,ltlfJBI L.'f INSTR l'*Uf*1HA lNTr.RMl'rTAN'f.'U'JI{/? ON Ill Ill: CL.'l ClllWll SWNAT,S FOii NOTSfi:.WONt: 1 Oll:Jt119!i0 20 11311'1/80 cs INSTR 'l'leCS-11108 FAILED HlGfl fl°f':l..UUGE/J 11/IOKfi:N CON/JllC2'0fl 1 00:11*1unoo 1 O:J/211/80 cc INSR icv.cc.io1 INSPF.CT CONTROLLER LF:V SF.T['(}INTS CllP.CKIW OllT SAT 1 tfl3l!i1'123 3Y 03}29)00 SI INSTR l'l*19113 REPLICE l'RF:SS GAGE lNSTALLF.D Nli'W CALIBRATF.IJ GAllGTC 1 113191532 2 03/21,109. RM MONlTOR IW*CC>!US LOWER ALARM TO 1.* tE5 cm CHANGED SETl'OINT
- i OUl'IOAOI 3'1 93/23/BI MS INSTR r1.. 1.11vs READS 1H PSI VOLTS+INDICATOR SAME AS ALL ormms 1
H32to23!i oaJ23Jee RM INSf"R mf*lJt'*108 READING ~Htt TO llTH CliECKED READING FOUND RHADING Oil i 1032102*12 2 113/23}80 RM INS'lR RM*CC*U6 READING !ill'UTO llTH CHECKED READING FOUND READING ON. i ll!J321l021f 3 911 e 03J23/B!l RM INS'fR RM*CCwU!i READING 9Xi9 CHECKED READING FOUND READING OK i 183211!1211'1 03/31/80 RC INSTR rI"1=15!iA SEAL DIFFF:RENTIAL PRESS NIGH RF.PLACED OSCILLATOR AND CALIBRATION 1 l!IJ3t3t!i211 . 91 DF.lT TOTAL 1590 i w Vt I . i I i
!-f.a.intenance of Safety Related Systems During,
Outage or Reduced Power Periods UNIT #2 Instrument Maintenance
-~ UNIT2* to/e'J/89 (HATN'fF:NANC/f Of SAF~TY R/l:LAT/l:IJ SYSTEMS flllRING OUTAr.P. OR RP.DllCF.D 1'0Jtfo:R l'li:RIOTJ,<:) R/l:TS'f.HV 111' SYS (:()MU' MARKNO
SUMMARY
WK1'f':llF o:i/oq/nt CV lfJSTR '1CV.,CV*2185 RF:l'LACF: Jl;fi I' REl'f,ACED Ell' Cl/'f.CK/l:D OUT SA"fl!: 03/11/00 CTI lNS'fR
- 'h11D EMER BORATE FL(]fl INDICATOR RF.'I'ATRED INDICATOR ?./l:RO AIJ,TrJSTMti:NT o:i/tq/oa cs lN.'lTR rnr.ssimr. GAG/f: UTIOKF.N lNS'fAIN.'D NF.II GAllGE ll:J/19/80 cs INS'f P.
rRESSURF: GAGE nnoKF.N 1 N sr AU,F./1 N Ew a AUG ff V3/29/BO 171' O'.f/IF;R FM., '.lrl"q II NOISY Ol1Tl'llT Tll\\l'LAC~.'/J CAT'ACJTORS 93/21/BQ RC INSTR DEf'ICI/i:NCY l'fJNCR LIST CONNF.CTF:D CARLE ll3/21)1l1J RS IWSTR RTn.. ns.. 2~08 DEFICIFJNCY l'UNCll UST RTIJ rmr.L IS BF.NT RTCJ FllNCTIONll 01( ~3lnJaw RP OTFIF.R E'M*'2.,119qA NOISY OUTl'IJT Rf..'l'LACED CAl'ACITORS Q3J21J8Q RI' OTflTiJR FM*2*q911B NOISY OUTPUT RF.l'LACF.D CAPACITORS E3"21/8tl BC ll'JSR
- n*.. 2.q310 REPLACE RTD REI'LACF.D RTD fJ3}25/80 RS INSTR LlwRSw251A L'SVEL INDICATOR BOUNCING WROTE MR TO MF.CRANICS TO SECUTIE DECK 113/26,480 RC INSTR TEw2ell13 REPLACE RTD REE'LAC8D RTD 113/31.18!1 RM MONITOR Rf.t.,.Rf.t.,262 REINSTALL AND CALIBRATE DETECTOR REINSTALLED DETECTOR+CALIBRATED DEIT TOTAL
\\,.. If MR 2 H21120IUI 2 9112317qf 2 Clll:ll91lli01 2 0031Uli0~ 2 00319!10:19 2 11821'1111:Jfi 2 0112191111111 2 !1113190839 2 003199039 2 911052323 2 11113232222 2 9110523211 2 IJB32ll0930 'T'OTIJWN'rM 199 liA 11111 211 1 211 '2fl 15 15 3290 1q 3302 3V ...... fl V'2'29
- I I w
-...J I I:
- 1.
i 6 HEALTH PHYSICS !1ARCH, 1980 There was no single release of radioactivity or radiation exposure specifically associated with an outage that accounted for more than 10% of the allowable annual values in 10CFR20. /
NillIBER OP-lA(A-1)
- PROCEDURE DEVIATIONS REVIEWED BY STATION NUCLEAR SAFETY AND OPERATING COMMITTEE AFTER TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS
!1ARCH, 1980 UNIT TITLE DEVIATION 1 Pre-Startup Checkoff List Step B - References to PC-BR-108A changed to PC-BR-109A The above procedure was deviated on January 5, 1980, and reviewed by the Station Nuclear Safety and Operating Committee March 20, 1980. l Startup Checkoff List Change to'C:onformwith'actual flow conditions. The above procedure was deviated on January 5, 1980, and reviewed by the Station Nuclear Safety and Operating Committee 11arch 20, 1980. OP-1A(C02) 1 Control Room Change l-CH'."""TK-1 to 1-CH-TK-lA The above procedure was deviated on January 5, 1980 and reviewed by the Station Nuclear Safety and Operating Committee March 20, 1980. OP-lB l Containment Checklist l-RC-29 closed. The above procedure was deviated January 6, 1980, and revi.ewed by the Station Nuclear Safety and Operating Committee ~larch 20, 1980. PT-16.4 2 Containment Isolation Valve Leakage Steps 4.36.8 and 4.36.9 - 45 psig vice 40 psig. The above procedure was deviated February 20, 1980, and l'.evi.ewed by the Station !faclear Safety and Operating Committee 1'-Iarch 7: 1980'.}}