MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML18153C3661990-09-20020 September 1990 Forwards Topical Rept VEP-NE-3-A, Qualification of WRB-1 CHF Correlation in VEPCO Cobra Code. ML20065D5671990-09-20020 September 1990 Forwards Rev 15 to Security Personnel Training & Qualification Plan.Rev Withheld ML18153C3701990-09-18018 September 1990 Forwards Addl Info Re Facility Containment Isolation Valve Type C Test,Per 900914 10CFR50,App J Exemption Request ML18152A2341990-09-14014 September 1990 Requests Exemption from 10CFR50,App J Section III.D.3 Re Local Leak Rate Testing During Every Reactor Shutdown. Basis & Justification for Exemption Encl ML20059J3341990-09-13013 September 1990 Forwards Rev 15 to Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H7391990-09-10010 September 1990 Forwards Rev 15 to ISFSI Nuclear Security Personnel Training & Qualification Plan.Rev Withheld ML20059H2931990-09-0707 September 1990 Advises of Review & Approval of ASME Section XI Inservice Insp Program Interval 1 Repair & Replacement Program Change to Applicable Code Edition & Addenda ML20064A5201990-09-0707 September 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-15 & 50-339/90-15.Corrective Actions:Procedures Revised to Include Tolerance Bands for Temp Control Switch Setpoints & Involved Personnel Counseled ML18151A2901990-08-31031 August 1990 Forwards Rev 10 to Updated FSAR for Surry Power Station Units 1 & 2,representing Second Updated FSAR Submitted This Yr ML20059E5481990-08-31031 August 1990 Forwards Supplemental Info Re Deletion of Pressurizer Safety Valve Requirement During Mode 5.Current Tech Spec Requiring One Operable Safety Valve in Mode 5 Unnecessary & May Be Deleted ML18153C3451990-08-29029 August 1990 Forwards Proprietary Semiannual Fitness for Duty Program Performance Data Rept for 900103-0630.Rept Includes Summaries of Mgt Sanctions Imposed,Actions Taken to Correct Program Weaknesses & Events Reported to Nrc.Encl Withheld ML18153C3381990-08-22022 August 1990 Responds to NRC 900723 Ltr Re Violations Noted in Insp Rept 50-280/90-21 & 50-281/90-21.Corrective actions:as-found-as- Left Conditions of Auxiliary Feedwater Evaluated & Found Operable ML18153C3391990-08-22022 August 1990 Requests Approval for Use of Plugs Fabricated of nickel- chromium-iron Uns N-06690 Matl (Alloy 690) to Plug Tubes in Steam Generators for Mechanical & Welded Applications ML20063Q1241990-08-15015 August 1990 Provides Supplemental Info for 900115 Tech Spec Change Request Re Max Allowable Control Rod Drop Time.Retained DNBR Margin Tracked & Documented by Calculational Note ML20058N5941990-08-0808 August 1990 Responds to NRC Re Violations Noted in Insp Repts 50-338/90-11 & 50-339/90-11.Corrective Actions:Procedure Revised to Limit Applicablity to Small Refueling Cavity Leaks & Listed Evaluations & Revs Will Be Made to EOP ML18153C3171990-08-0101 August 1990 Resubmits Synopsis of Changes to Updated Operational QA Program Topical Rept Vep 1-5A ML18153C3161990-08-0101 August 1990 Provides Supplemental Response to NRC 900629 Ltr Re Electrical Crossties,Load Shedding on Nonblackout Unit & Emergency Diesel Generator Reliability.Emergency Diesel Generator Reliability Program in Place,Per Reg Guide 1.155 ML18153C3091990-07-30030 July 1990 Provides Outline of Plan to Meet 10CFR50 App G Requirements, for Low Upper Shelf Energy Matls,Per NRC 900521 Request ML18153C3061990-07-30030 July 1990 Forwards Revised Tech Spec Pages,Addressing Constitution of Quorum & Timeliness of Mgt Safety Review Committe Meeting Minutes,Per NRC Request ML18153C3101990-07-26026 July 1990 Forwards Decommissioning Financial Assurance Certification Rept..., Nuclear Decommissioning Trust Agreement & Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement, Per 10CFR50.75 ML18153C3051990-07-26026 July 1990 Advises That Util Submitted Decommissioning Funding Plan & Financial Assurance Info W/Isfsi License Application ML18153C3041990-07-26026 July 1990 Responds to NRC 900626 Ltr Re Violations Noted in Insp Rept 50-281/90-20.Corrective Actions:Leaking Drain Plug & Upper Drain Plug on Motor Replaced W/Oil Drain Assemblies Composed of Piping & Valves ML18153C3031990-07-26026 July 1990 Advises of Withdrawal of Request for NRC Review & Approval of Engineering Evaluation 8.Revised Evaluation Will Be Maintained Onsite for NRC Audit During Future Insps,Per Generic Ltr 86-10 ML20055H5651990-07-20020 July 1990 Requests for Temporary Waiver of Compliance from Requirement of Tech Spec 3.3.1.1,Table 2.3-2 Re Response Time Testing. Request Does Not Pose Significant Hazards Consideration ML18153C2901990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Listed Transmitters Compiled.Transmitters Found Installed within Reactor Protection or ESFAS Have Been Replaced ML20055F9361990-07-16016 July 1990 Advises That No 30-day Rept Will Be Made Re Degradation of Seismic Support Bolts of post-accident Hydrogen Recombiners 1-HC-HC-1 & 2-HC-HC-1 ML20044B3501990-07-13013 July 1990 Forwards Monthly Operating Repts for June 1990 & Corrected May 1990 Rept Pages for North Anna Power Station ML18153C2861990-07-12012 July 1990 Requests Cancellation of Operator Licenses for Listed Individuals.Licenses No Longer Required ML18153C2871990-07-11011 July 1990 Responds to Violations Noted in Insp Repts 50-280/90-18 & 50-281/90-18.Corrective Actions:Permanent Drain Line Installed & Matrix Which Describes Proper Ventilation Alignment for Plant Conditions Provided for Personnel Use ML20055E8121990-07-0909 July 1990 Requests Cancellation of Licenses Listed ML18153C2851990-07-0606 July 1990 Forwards Response to Generic Ltr 90-04 Re Status of Generic Safety Issues ML18153C2831990-07-0303 July 1990 Advises That MW Hotchkiss No Longer Needs Operator License SOP-20548-1.Cancellation of License Requested ML18153C2821990-07-0303 July 1990 Requests Exemption from 10CFR50,App J,Paragraph III.A.6(b), Which Requires That When Two Consecutive Periodic Type a Tests Fail to Meet Applicable Acceptance Criteria Type a Test Shall Be Performed at Plant ML20055D4841990-07-0303 July 1990 Requests That Operator Licenses for Listed Individuals Be Cancelled.Licenses No Longer Required ML20055D4831990-07-0303 July 1990 Requests That Operator License for Bl Shriver Be Cancelled. License No Longer Required ML20055D7701990-06-29029 June 1990 Submits Supplemental Response to Violations Noted in Insp Repts 50-338/90-04 & 50-339/90-04 Re Failure to Take Timely Corrective Action for Repair of B Low Head Safety Injection Pump (1-SI-P-1B).No Addl Purchasing Procedure Required ML18153C3591990-06-28028 June 1990 Responds to SALP Repts 50-280/90-16 & 50-281/90-16 for Period 890701-900331.Corrective Actions Focus on Issues of Maint Backlog,Maint planning,post-maint Testing,Staffing & Procurement ML18153C2611990-06-21021 June 1990 Responds to NRC 900522 Ltr Re Violations Noted in Insp Repts 50-280/90-07 & 50-281/90-07.Corrective actions:as-built Configurations of 120-volt Ac & Dc Vital & Semivital Panel Breaker Installations Verified to Be Acceptable ML20043H9421990-06-21021 June 1990 Forwards Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, Per Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Rept Withheld (Ref 10CFR2.790) ML18153C2591990-06-18018 June 1990 Forwards Response to NRC 900524 Request for Addl Info Re NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Engineering Will Initiate Study to Evaluate Enhancements of Cooldown & Possible Heatup Operation ML18153C2581990-06-18018 June 1990 Forwards Reissued Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. Rept Contains Info Re SR-89,Sr-90 & Fe-55 Analytical Results for Liquid Composite Samples ML20055C8661990-06-15015 June 1990 Forwards Application for Reissuance of NPDES Permit ML18153C2541990-06-15015 June 1990 Forwards Corrected Tech Specs Page 3.1-3,per Identification of Typo in 900522 Application for Amends to Licenses DPR-32 & DPR-37 ML20043G5711990-06-15015 June 1990 Forwards Response to Request for Addl Info Re Insp Rept 50-339/89-20 Concerning Plant Safety Sys Outage Mod Insp. Response Withheld (Ref 10CFR73.21) ML20043H1131990-06-15015 June 1990 Concludes That Removal of Temporary Loose Parts Monitoring Sys Does Not Increase Probability of Acccident,Create Possibility of New Kind of Accident & Does Not Reduce Margin of Safety ML20043G8731990-06-14014 June 1990 Discusses Evaluation of ASME Section XI Testing for Outside Recirculation Spray Pumps ML18153C2521990-06-14014 June 1990 Responds to NRC 900515 Ltr Re Violations Noted in Insp Repts 50-280/90-09 & 50-281/90-09.Corrective Actions:Abnormal Procedures & Fire Contingency Action Procedures Being Upgraded Via Technical Procedure Upgrade Program ML20043H2091990-06-13013 June 1990 Forwards List of Corrective Actions & Current Status in Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. ML20043F4531990-06-0808 June 1990 Forwards, Core Surveillance Rept for North Anna 2,Cycle 7 W/Extended License Burnup Limit. Rept Contains Specific Power Distribution Limits Applicable for Cycle 7 Operation W/Burnup Limit Extension ML18153C2501990-06-0808 June 1990 Confirms That Primary Policy Re Onsite Property Damage Insurance,Provided by Nuclear Mutual Limited 1990-09-07
[Table view] |
Text
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VrROIN .lA 23261 March 31, .1980 Mr. Harold R. Denton, Director Serial. No. 298 Office of Nuclear Reactor Regulation LQA/WRM:rab Attn: Mr. A. Schwencer, Chief Operating Reactors Branch No. 1 Docket Nos. 50-280 Division of Operating Reactors 50-281 U. S. Nuclear Regulatory Commission 50-338 Washington, D.C. 20555 50-339
Dear Mr. Denton:
The Virginia Electric and Power Company, in order to assist the Staff in their review of the proposed Technical Specification changes for the North Anna and Surry Power Stations resulting from the management.reorganization of April 1, 1980, encloses two attachments of information pertaining to the revision of various departmental positions.
Attachment 1 contains resumes of the individuals who currently hold the revised positions. Attachment 2 contains job descriptions of the revised positions shown in the proposed Technical Specification changes.
Very truly yours,
~
C. M. Stallings Vice President-Power Supply and Production Operations Attachments:
- 1. Personnel resumes
- 2. Job position descriptions cc: Mr. O. D. Parr Light Water Reactors Branch No. 3 Division of Project Management
(-
0 I
\
0
\ 0
e ATTACHMENT 1
e Executive Vice President - Power BS/ME - 1960 Colorado State University 1960-1971 General Electric Company Reactor operations, technical support, operator training, and irradiation testing*..:*
Project management of design, development, construction and_
startup of first commercial nuclear plant training simulator, and completion and startup of Tsuruga Nuclear Plant,. Japan, :
and Nuclenor Nuclear Project, Spain.
1971-1972 Daniel Construction Company Manager, Technical Services - provided technical-support to nuc~ear and fossil power projects 1972-1974 Westinghouse Electric Corporation Project Manager for KoRi Nuclear Project - Korea, and ¥..anager, Far East Projects 1974-1979 JA Jones Construction Company - Charlotte, N.C.
Vice President, Energy Division
.:1979-1980 Consultant to Houston Lighting & Power, assisting ~th organizational development and design and construction of nuclear and fossil projects Elected to present position*effective February 1, 1980.
e Manager-Nuclear Operations and Maintenance - B. R. Sylvia Formal Education - BSEE from Virginia Polytechnic Institute and State University, 1961. Completed 30 semester hours toward a Master of Commerce Degree at University of Richmond Night School. Received graduate degree in nuclear engineering from North Carolina State University, Raleigh, North Carolina, 1968 Training - Completed Westinghouse Reactor Operator Training Program qµalifying as Reactor Operator for the Saxton Reactor,, Saxton, Pennsylvania, 1 year.
Received Senior Reactor Operator License Surry Nuclear Power Station~ July 1972.
Experience - January 1962 to 1968 various positions in Vepco Power Generation
- October 1968 to August 197Z Supervisor Engineering Services Vepco~ Surry Nuclear Power Station.
- August 1972 to January 1974, Superintendent Station Operations
. Vepco North Anna Power Station.
- January 1974 to October 1975, Supervisor of Nuclear Operations Vepco General Office.
- October 1975 to April 1980, Director Nuclear Operations.
Present ~osition April 1980.
e Director-Maintenance & Operation Services - W. L. Stewart Formal Education -*Wellsburg High School, Wellsburg, W. Va.
Training - Electrician Mate School - 12 weeks*
U. S. Submarine School (U. S. Navy) - 6 weeks U. S. Nuclear Power School (U. S. Navy) - 26 weeks U. S. Navy Nuclear Power Prototype - 26 weeks Westinghouse Reactor Operator Training Program - 8 weeks Certification - SSW Nuclear Power Plant Qualified Previously held Surry Power Station License; Received RO May, 1972, SRO June 1973 Experience - 9.5 years U. S. Navy experience with 7 years being nuclear Employed .in power generation with Vepco since February 1970 and in supervisory positions since Octo'.Jer 1972 Promoted to Shift Supervisor December 1973 at Surry Power Station
~
- . Promoted to Operating Supervisor April, 1975 Promoted to Superintendent Station Operations July, 1.976 Promoted .to Station.Manager. Surry. Power Station January, 1979 Promoted to Director Maintenance & Operation Services April, 1980
e Section Supervisor-Training - J. A. Hanson, Jr.
Formal Education - BS Physics, Old Dominion University, 1976 Training - Electronics Technician "A" School - U. S. Navy Basic Nuclear Power School - U. S. Navy Nuclear Prototype Training Unit - U. S. Navy Reactor Operator and Senior Reactor Operator Licenses (NRC) for Surry Units 1 and 2 Experience - 1965-1971 Electronics Technician, Reactor Operator, Nuclear Prototype Instructor - U. S. Navy
- 1972-1979 Surry Power Station as:
Assistant Control Room Operator Assistant Shift Supervisor Shift Supervisor Nuclear Training Coordinator Nuclear Training Supervisor
- 1979-1980 Supervisor-Pro1uction Training Programs Development April 1, 1980 Present Position
e Section Supervisor-Nuclear Administrative Services - R. L. Baldwin Fonnal Education - B. Metallurgical Engineering, Cornell University
- J, yr.* .Postgraduate Sciences and Mathematics Curriculum,"
U.S. Naval Postgraduate School, Monterey California Training - Basic Naval Nuclear Power Training Nuclear Po;.;rer Prototype Training on DIG Prototype Marine Engineering School - 6 months Experience - 1958-1960 Destroyer Engineer Officer Executive Officer:
Amphibious Ship 1962-1963 Replenishment Ships 1969-1971 1971-1975 Nuclear Power Training Unit Idaho Falls 1967-1969 Navy Weapons Station Concord CA 1973-1975 Maintenance Inspection Team, Aircraft Carrier 1975-1978 Main Propulsion Assistant
& Engineering Officer of the Watch, USS Enterprise 1965-1967 Nuclear ~raining Coordinator, Surry Power Station, 1976-1978 Supervisor Administrative Services, *surry Power Station 1978-1980 April 1~ 1980, Present Position
e ' .
Section Supervisor-Nuclear Operations and Maintenance Support - L.A. Johnson Formal Education - BS United States Naval Academy
- MS Physical Oceanography, Old Dominion University Training - Basic Naval Nuclear Power Training
- Nuclear Power Prototype Training on SIC Reactor Plant
- Qualified Engineering Officer of the Watch
- U. S. Navy Submarine School
- Qualified Senior Reactor Operator (Surry Power Station)
Experience - I&C Officer and Engineering Watch Officer, SIC Reactor Plant,-1960-1961
- Machinery Officer, USS John Marshall (SSBN611), 1961-1963
- Engineer Officer (Department Head) USS Daniel Webster (SSBN 626), 1963-1965
- Shipboard and Engineering Accident Analyst, Submarine Safety Center, 1965-1968
- Executiye Officer, Replenishment Ship, 1968-1970
- Accident Investigator and Analyst, (Cruiser Destroyer)
Naval Safety Center, 1970-1975
- Engineering Supervisor on Performance and Surveillance, Surry Power Stationj 1975-1977
- Supervisor of Engineering Services, Surry Power Station 1977-1978
- Senior Staff Engineer and Personal Assistant to Director of Nuclear Operations~ System Office, 1978-1980 April 1, 1980~ Present Position
e Manager-Nuclear Technical Services - J. T. Rhodes Education: BS Nuclear Physics, North Carolina State University, 1963 MS Nuclear .Engineering, Catholic University, 1968 PhD Nuclear Engineering, Purdua University, 1972 Experience: - 1963-1964, Associate Engineer (auxiliary Power Systems Group),
Martin-Marietta Corporation-Nuclear Division
- 1964-1968, U. S. Army Nuclear Power Program, Project Engineer and Senior Project Engineer, Nuclear and Thermal Hydraulic Analyses for 5 ANPP PWR reactors.
1968-1971, Purdue University, AEC fellow working in ,Co.re Analyses andoptimized planning methods for different types of commercial reactor designs.
- 1971-1972 Nuclear Physicist, Virginia Electric and Power Co.
- 1972-1975 Supervisor, Nuclear Fuel Design and Operation
- 1975-1977 Director, Nuclear Fuel Engineering and Operation
- 1978-1980 District Manager Aprill,1980 Present Position
Director-Safety Evaluation and Control - E. R. Smith, Jr.
Formal Education - BSEE - Virginia Polytechnic Institute and State University (with Nuclear Option) - 1971 Training - Westinghouse Instrumentation and Control Engineer Course
- SRO Training - Surry Power Station Experience Fossil-fueled power station engineering staff - 1 year Nuclear power station engineering staff - 6 years (includes 1 year, 1972-1973, at Surry Power Station)
- NRC SRO license~ Surry Power Station 1976 (expired)
- Engineering Supervisor - North Anna 1976-1978
- Supervisor Engineering Services 9-1-78 to 1-1-79
- Participated in Unit 1 Pre-op and Startup testing program
- Superintendent-Technical Services 1979-1980
- In present Position, April 1, 1980
e Director-Technical Analysis - R. M. Berryman Formal Education - BSME, North Carolina State University, 1970 Experience - 1970-1974, Various engineering positions at Vepco
- 1974-1977, Staff Engineer
- 1977-1978, Supervisor Nuclear Engineering Services
-1978-1980, Superintendent Engineering Services
- April 1, 1980 - Present Position
e e Director-Chemistry and Health Physics - W.W. Cameron Formal Education - BS Chemistry, University of Richmond MSPH, Radiological Hygiene, University of North Carolina Experience 1955-1959, Various chemistry oriented posit~ons with Vepco
- 1960-1967 9 Project chemist CVNPA test reactor 1967-1968, Staff position, Vepco 1968-1969, University of North Carolina
- 1970~1976, Supervisor Health Physics, Surry Power Station
- 1976-1978, Health Physics Staff positions 1978-1980, Superintendent Technical Serv.ices*
April 1, 1980 - Present Position
e e ATTACHMENT 2
e Manager-Nuclear Operations and Maintenance
- The Manager-Nuclear Operations and Maintenance has responsibility for the suvervision of the Nuclear Station Managers in the operation and maintenance of the Company's operational nuclear units. This includes responsibility for coordinating and directing all nuclear plant operations and maintenance planning and scheduling, insuring qualified station staffing is in place at all times, providing the necessary information to and communications within the Company and regulatory agencies re-garding nuclear plant operations, and providing input to and review of new nuclear plant design and existing plant modifications.
e Director-Operation and Maintenance Services The Director-Operation and Maintenance Services has responsibility for coordinating operational and maintenance support with nuclear unit activities. This includes responsibility for providing personnel re-cruiting and staffing, and overseeing the corporate nuclear training program.
e Section Supervisor-Training The Section Supervisor-Training has responsibility for providing corporate and station nuclear training programs. This responsibility includes the development and review of the content of the nuclear training programs~
and providing specialist support to the po~er stations
e Section Supervisor-Operation and Maintenance Support The Section Supervisor-Operation and Maintenance Support has responsibility for scheduling and m,onitoring of operational and maintenance activities.
This includes responsibility for reviewing operations and maintenance *input to design changes and coordinating Corporate support activities with the station.
e Section Supervisor-Administration The Section Supervisor-Administration has responsibility for office services. This responsibility includes interfacing with public relations, budget analysis, labor relations, and personnel staffing and recruiting.
e Manager-Nuclear Technical Services The Manager-N~clear Technical Services has responsibility for technical services activities required to support the Company*s operational nuclear units. This includes responsibility for evaluating and responding t~
NRG requests, bulletins, and orders, provide chemistry and health physics support, oversee all work on plant design changes and modifications in sufficient detail to ensure nuclear safety criteria are met, review plant performance and problems and recommend engineering solutions, and disseminate operating experience and performance information to the appropriate functional groups within the Company.
e -*
Director-Chemistry and Health Physics The Director-Chemistry and Health Physics will provide support to the nuclear stations in the areas of chemistry and health physics.
r e
Director-Safety Evaluation and Control The Director-Safety Evaluation and Control is responsible for offsite safety review of nuclear power station operations. He will have staff responsibility for the safety engineering review function. He will have direct communication with and give technical direction to the station Safety Engineering Staffs in the .identification, evaluation and resolution of safety concerns. Re will also be responsible for the submittal of License Events.Reports, routine reports and correspondence concerning non-compliances. He will also follow activities of NSAC and INPO and other organizations involved in nuclear safety related functions.
e . *.,,_
"r *. ,. ..
Director-Technical Analysis The Director-Technical Analysis is responsible for furnishing support for station design modifications and responses to NRC requirements. His group will also provide responses to I&E Bulletins. He will provide general operations support and economic analyses. He will also participate in industry ownersv groups.