ML18139A029

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
Date released: 12/10/2018 Download: ML18139A029


LER 80-013/03L-0:on 800206,during Accumulator Tank Recirculation to Obtain Samples,Valve HCV-1852A to Tank 1-SI-TK-1A Delayed Closing 30-s to 50-s After Operating Control.Caused by Moisture in Air Lines.Valve Cycled
ML18139A030
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/05/1980
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A030 (2)
Forwards LER 80-013/03L-0
ML18139A028
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/03/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A028 (1)