5/10/18 Summary of Public Meeting with Nuclear Energy Institute to Discuss Staff Observations of Licensees Performing Facts & Observation Closures in Accordance with Appendix X to NEI 05-04, NEI 07-12, and NEI 12-13
ML18137A276
Person / Time
Issue date: 07/06/2018
From: Geoffrey Miller
Special Projects and Process Branch
To: Doug Broaddus
Special Projects and Process Branch
Miller G
References
Download: ML18137A276 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 July 6, 2018 MEMORANDUM TO: Douglas A. Broaddus, Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: G. Edward Miller, Project Manager~(

Special Projects and Process Branc blJ cJ Division of Operating Reactor Lice ing Office of Nuclear Reactor Regulatio

SUBJECT:

SUMMARY

OF MAY 10, 2018, PUBLIC MEETING WITH NUCLEAR ENERGY INSTITUTE REGARDING APPENDIX XTO NEI 05-04, NEI 07-12, AND NEI 12-13, FINDING AND OBSERVATION CLOSURE PROCESS On May 10, 2018, the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting 1 with staff from the Nuclear Energy Institute (NEI). The purpose of the meeting was to discuss the independent assessment finding and observation (F&O) closure process described in Appendix X to NEI 05-04, NEI 07-12, and NEI 12-13. Specifically, the meeting was to discuss a process for making observation reports publically available and to provide the NRC staff's feedback from previous observations of licensee implementation of the F&O closure process.

During the meeting, the NRC staff presented slides that provided feedback from NRC staff observations of licensees implementing the F&O closure process. 2 As detailed in the slides, the NRC observed that one licensee had peer review results based on a full scope peer review performed before NEI 00-02 and other supporting documents endorsed by RG 1.200 were issued. The NRC staff stated that the license amendment requests submitted using peer reviews performed prior to the NEI 00-02 guidance were resulting in increased review efforts and longer schedules. The NRC staff provided options to address this issue. The NEI representatives indicated that it may be a small population of licensees that have the issue and, therefore, it may not need a generic solution. The NEI staff indicated that they would determine how many licensees had peer reviews performed prior to NEI 00-02.

The NEI staff gave a presentation of their feedback on the NRC's observation of the closure process. 3 The presentation indicated that the industry was supportive of, and saw benefit to, continued NRC observation of the F&O closure process. Additionally, NEI indicated that there was a desire to allow licensees who hosted observations to have an opportunity to provide a fact check on the NRC observation report prior to publication. The NRC staff indicated that 1 The original meeting notice is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18087A011.

2 The NRC slides are available under ADAMS Accession No. ML18130A744.

3 The NEI slides are available under ADAMS Accession No. ML18129A396.

D. Broaddus there were several current programs for other NRC products that provided for factual verification by the subject of the product (e.g., plant-specific information used in an Information Notice) and that those processes could be applied to F&O closure observations. The NRC staff committed to evaluate the programs to find the most appropriate process to use to make F&O closure observations reports publically available.

No regulatory decisions were made and both the NRC and NEI staffs indicated that they would consider the items discussed in the meeting.

Following the discussion, an opportunity was afforded to any other participants who wished to ask questions or make comments. No questions or comments were received in the meeting.

Following the meeting, a voicemail was received from a member of the public who was in attendance, who indicated that they felt the process was not rigorous.

Enclosure:

List of Attendees

ENCLOSURE LIST OF ATTENDEES

Public Meeting to Discuss Sign In Sheet Appendix X F&O Closure DATE: May 10, 2018 Process Name

Public Meeting to Discuss Sign In Sheet Appendix X F&O Closure DATE: May 10, 2018 Process Name Organization

\l,A: 'PKorJ<E' S.f\l',.)Lr.::Y Lc::v1/\JS0"' ~/V\A-TO~t

-:Jo'K,-.> L!oNLY U-ICT"~Ec GER/2. '-/ l~lr,)f:>Rt?!> TvA

v1 I KG' WA-<..1£1
YZ 1\/4

°bkrv j<(~4-'2NA-C"tt1A-,-J JvA

'R(ZA-'t) Tu l A- ...J -rvA

-:-r-Acol3> ToHl'lS"O,.J 'JV~

~V\Dfi_v"""~ f'70Lu~140(:'N~77..i(7 S:,'V.

ri<.A \(, A) ,£Robt \')..., I.A IN\ ON Koe, Posr l)~,v\1,vlON A- L\. ~-"' J.1n Lb fJ HA-uJ;; (( Yo"" 11w ION Yoorve"1 -Jo _$o1. fTl-tt ~tu

JoN /(Af' JT.:C A)(

C5,A-R GAACI'\- 1. mtRG,y MMK K~SSA-fl1 Xue... f;.J~Rc.., ,/ I l<J(:X)DY LorvrvF O'JE"RC-r>, !UoRT1-tWSt

ML18137A276 *via e-mail OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NRR/DRA/APLA/BC NAME GEMiller JBurkhardt SRosenberg DATE 5/23/18 5/23/18 5/23/18 OFFICE NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM NAME DBroaddus GEMiller DATE 6/15/18 7/16/18