Text

T. Rausch

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100

KING OF PRUSSIA, PA 19406-2713

May 15, 2018

Mr. Timothy S. Rausch

President and Chief Nuclear Officer

Susquehanna Nuclear, LLC

769 Salem Blvd., NUCSB3

Berwick, PA 18603

SUBJECT: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

INFORMATION REQUEST FOR THE CYBER-SECURITY INSPECTION

NOTIFICATION TO PERFORM INSPECTION 05000387/2018403 AND

05000388/2018403

Dear Mr. Rausch:

On October 15, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a team

inspection in accordance with Inspection Procedure (IP) 71130.10P Cyber-Security, issued

May 15, 2017 at your Susquehanna Steam Electric Station, Units 1 and 2 (Susquehanna).

The inspection will be performed to evaluate and verify your ability to meet full implementation

requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR),

Part 73, Section 54, Protection of Digital Computer and Communication Systems and

Networks. The onsite portion of the inspection will take place during the weeks of

October 15-19, 2018, and October 29 - November 2, 2018. Experience has shown that team

inspections are extremely resource intensive, both for the NRC inspectors and the licensee

staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for documents needed for the

inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber security Inspection Procedure. This

information should be made available via compact disc and delivered to the regional office no

later than July 23, 2018. The inspection team will review this information and, by

August 20, 2018, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of your plants Cyber Security Program selected for the cyber security inspection.

This information will be requested for review in the regional office prior to the inspection by

September 17, 2018.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, October 15, 2018.

T. Rausch 2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Jigar Patel. We understand that our regulatory contact

for this inspection is Mr. Charlie Manges of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 610-337-5188 or

via e-mail at Jigar.Patel1@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-387 and 50-388

License Nos. NPF-14 and NPF-22

Enclosure:

Susquehanna Steam Electric Station

Cyber Security Inspection Document Request

cc w/encl:

Distribution via ListServ

ML18136A614

SUNSI Review Non-Sensitive Publicly Available

Sensitive Non-Publicly Available

OFFICE RI/DRS RI/DRS

NAME JPatel GDentel

DATE 05/14/18 05/15/18

1

SUSQUEHANNA STEAM ELECTRIC STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000387/2018403 and 05000388/2018403

Inspection Dates: October 15 - 19, 2018 and October 29 - November 2, 2018

Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date May 15, 2017

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber Security Inspection, Issue Date October 26, 2017

NRC Inspectors: Jigar Patel, Lead Louis Dumont

610-337-5188 610-337-5183

Jigar.Patel1@nrc.gov Louis.Dumont@nrc.gov

NRC Contractors: Alan Konkal Timothy Wright

Alan.Konkal@nrc.gov Timothy.Wright@nrc.gov

NRC Observers: Catherine Allen

301-287-3620

Catherine.Allen@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Program (CSP) elements to develop a site-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management (O&M) security control portions of the CSP

to be chosen as the sample set required to be inspected by the cyber security IP. The first

RFIs requested information is specified below in Table RFI #1. The Table RFI #1

information is requested to be provided to the regional office by July 23, 2018, or sooner, to

facilitate the selection of the specific items that will be reviewed during the onsite inspection

weeks. All requests for information shall follow the Table RFI #1 and the guidance document

referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the lead

inspector by July 23, 2018. Please provide four copies of each CD submitted (i.e., one for

each inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file on a CD. These CDs should be indexed and hyper-linked to facilitate ease

of use.

If you have any questions regarding this information, please call the inspection team leader

as soon as possible.

Enclosure

2

SUSQUEHANNA STEAM ELECTRIC STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Reference Section 3, Paragraph Number/Title: Items

1 List All Identified Critical Systems and Critical Digital Assets All

List CDA Facility and Site Ethernet - Transmission Control

2 Protocol/Internet Protocol (TCP/IP) Based Local Area Networks (LANs) All

and Identify Those LANs That Have Non-CDAs On Them

List CDA Facility and Site Non-Ethernet TCP/IP Based LANs Including

3 Those Industrial Networks and Identify LANs That Have Non-CDAs On All

Them

Network Topology Diagrams (Be Sure To Include all Network Intrusion

Detection Systems (NIDS) and Security Information and Event

4 All

Management (SIEMs) for Emergency Preparedness (EP) networks and

Security Level 3 and 4 Networks)

List All Network Security Boundary Devices for EP Networks and All

8 All

Network Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)

11

with Them 11.a.2)

SIEM Documentation for Critical systems That Have CDAs Associated 12.a.1)

12

with Them 12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems All

Cyber Security Assessment and Cyber Security Incident Response

25 All

Teams

In addition to the above information please provide the following:

(1) Electronic copy of your current Cyber Security Plan

(2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to

support those changes, made to the originally approved Cyber Security Plan

(3) Electronic copy of a matrix that summarizes what controls are in place to satisfy the

controls required by Policies and Procedures

(4) Electronic copy of the Updated Final Safety Analysis Report and technical specifications

(5) Name(s) and phone numbers for the regulatory and technical contacts

(6) Current management and engineering organizational charts

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI (i.e., Table RFI #2). The inspection team will

submit the specific systems and equipment list to your staff by August 20, 2018, which will

identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber security

inspection.

3

SUSQUEHANNA STEAM ELECTRIC STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific systems

and equipment to your staff by August 20, 2018 for the second RFI (i.e., RFI #2). The

second RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of your stations CSP selected for the cyber-security inspection.

The additional information requested for the specific systems and equipment is identified in

Table RFI #2. All requested information shall follow the Table RFI #2 and the guidance

document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

September 17, 2018. Please provide four copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet

file on a CD. These CDs should be indexed and hyper-linked to facilitate ease of use. If you

have any questions regarding this information, please call the inspection team leader as

soon as possible.

Table RFI #2

Section 3, Paragraph Number/Title: Items

Plant Computer System Block Diagram (If Plant Computer System Is

5 All

Selected for Inspection)

Plant Security System Block Diagram (If Security Computer System Is

6 All

Selected for Inspection)

Systems That Are Distributed Block Diagrams (For Systems Selected

7 All

For Inspection)

Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)

10

Systems Selected for Inspection) 10.a.2)

List all Maintenance and Test Equipment Used On CDAs for Systems

13 All

Selected for Inspection

15 Configuration Management All

16.b.

16.c.1)

16 Supply Chain Management

16.c.5)

16.c.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

20 Vendor Access and Monitoring All

21 Work Control All

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last NRC Inspection All

In addition to the above information please provide the following:

  • The documented CSP assessment and analysis for each CDA in each of the selected

systems

4

SUSQUEHANNA STEAM ELECTRIC STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide the

following RFI (i.e., Table 1ST Week Onsite) on a CD by October 15, 2018, the first day of the

inspection. All requested information shall follow the Table 1ST Week Onsite and the

guidance document referenced above.

Please provide four copies of each CD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These

CDs should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1ST Week Onsite

Section 3, Items

Paragraph Number/Title:`

10.a.3)

Host-Based Intrusion Detection System Documentation for CDAs

10 thru

for systems selected for inspection

10.a.12)

11.a.3)

NIDS Documentation for Critical Systems That Have CDAs

11 thru

Associated with Them

11.a.15)

12.a.3)

SIEM Documentation for Critical Systems That Have CDAs

12 thru

Associated with Them

12.a.14)

16.c.2)

16 Supply Chain Management 16.c.3)

16.c.4)

19 Cyber Security Event Notifications All

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them:

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan;

e. Latest Individual Plant Examination for External Events/Probabilistic Risk

Assessment Report; and

f. Vendor Manuals

(2) Assessment and Corrective Actions:

a. The most recent Cyber Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective

actions) generated as a result of the most recent Cyber Security QA audit and/or

self-assessment.

5

SUSQUEHANNA STEAM ELECTRIC STATION

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the