ML18136A290

From kanterella
Jump to navigation Jump to search
Forwards LER 79-037/03L-0
Date released: 12/10/2018 Download: ML18136A290


LER 79-037/03L-0:on 791119,during Normal Operation,Heat Tracing Circuit 13A (Panels 8 & 9) 1 & 2 Boron Injection recirculation-to-boric Acid Tanks Failed.Caused by Overheating of Heat Tracing Tape.Tape Replaced
ML18136A291
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/11/1979
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18136A291 (2)
Forwards LER 79-037/03L-0
ML18136A289
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/11/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18136A289 (1)