ML18136A242
| ML18136A242 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/30/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7912030189 | |
| Download: ML18136A242 (1) | |
Text
e VIRGINIA ELECTRIC.AND POWER COMPANY RICHMOND, VIRGINIA 23261 November 30, 1979 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:
Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
Serial No.
9 49 PO/WRR:baw Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 We have amended the approved security plan for Surry Power Station, Units 1 and 2, to clarify potentially ambiguous and incongruous phraseology, to correct typographical errors, and to upgrade the provisions of Chapter 10, Special Security Measures During Construction Operations.
These changes do not represent any degradation in the physical security program, therefore, we are submitting them for your review and approval pursuant to the provisions of 10 CFR 50.54(p).
Five copies of each of the amended pages are enclosed.
These documents are considered proprietary by Virginia Electric and Power Company and should be withheld from public disclosure in accordance with the provisions of 10 CFR
- 2. 790(d).
cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Very truly yours, C. M. Stallings Vice President-Power Supply and Production Operations 1:Jcf>:,,~
79 \\ 1.030 /~9