ML18136A094
| ML18136A094 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna |
| Issue date: | 10/08/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7910240044 | |
| Download: ML18136A094 (1) | |
Text
- - -------*-----------. - --------*. ---*----- ___....,____. __ ---- *-
- -~ -*~. --- - - **** **--- -----* --- --
e.
USrJRC REGl'::r: :~
'Tt. r*-,1.
r***-*.
~,;1. *..: 1 VxR*o1Ni.* t ELECTRIC AND Pow ER. COMPANY RICHMOND,VIBGINIA 23261 790CTIO A9: 4i:!
October* 8, 1979-Mr. James P. O'Reilly, Director Office of Inspection and Enforcement
- u. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Serial No.
622B PO/FHT:baw Docket Nos. 50-280~
50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 CPPR-78
Subject:
IE Bulletin 79-17 Surry Power Station Units 1 and 2 North Anna Power Station Units 1 and 2
Dear Mr. O'Reilly:
We have reviewed the subject Bulletin, "Pipe Cracks in Stagnant Borated Water Systems at PWR Plants", and have had discussions with your Mr. :Economos and Mr. Herdt about the scope of the required UT inspections and the techniques to be used.
We understand that a revision to this bulletin is forthcoming clarifying the inspection requirements.
We therefore request a 90 day deferral of the completion date for the inspections until January 23, 1980, or until 90 days after the issuance of the revised bulletin, whichever is later.
We wiil forward the results of the inspections consistent with the requirements of the bulletin.
cc: Director Division of Operating Reactors Office of Inspection and Enforcement Washington, D. C.
20555 Very truly yours,
~.)/)?, ~~~~
C. M. Stallings Vice President-Power Supply and Production Operations 7910240 oY Cf--