ML18136A044

From kanterella
Jump to navigation Jump to search
Forwards Proposed Startup Test Procedure 1-ST-9,Revision 0, Voltage Profile, in Response to 790808 Request.Also Submits Info Re Adequacy of Electric Distribution on Sys Voltages in Event of Loss of Both Offsite Sources
Date released: 12/10/2018 Download: ML18136A044


Proposed Startup Test Procedure 1-ST-9,Revision 0, Voltage Profile.
ML18136A045
Person / Time
Site: Surry 
Issue date: 08/24/1979
From: Heacock D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML18136A045 (15)
Forwards Proposed Startup Test Procedure 1-ST-9,Revision 0, Voltage Profile, in Response to 790808 Request.Also Submits Info Re Adequacy of Electric Distribution on Sys Voltages in Event of Loss of Both Offsite Sources
ML18136A043
Person / Time
Site: Surry 
Issue date: 10/09/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, GAMMILL W
Office of Nuclear Reactor Regulation
References
Download: ML18136A043 (2)