Dominion Energy Nuclear Connecticut,. Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com

  • S1e

~

Dominion Energy

. May 7, 2018 U.S. N*uclear Regulatory Commission Serial No. 17-465E Regional Administrator, Region I NSSL/TFO R3 2100 Renaissance* Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos.

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEM C.1 On November 21, 2017, the Nuclear Regulatory Commission (NRG) issued Confirmatory Order EA-17-077 to Dominion Energy *Nuclear Connecticut, Inc. (DENC).

Section V of the Confirmatory Order requires DENC to complete Item C.1 within 180 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. On April 9, 2018, DENC completed an evaluation of its oversight of the security contract organization. The evaluation reviewed reporting relationships, Licensee and contractor responsibilities for individual performance management, and the means in place to verify that regu,latory requirements are being met. Results of the evaluation were captured in a Station Performance Improvement Report (PIR). The PIR identified recommended enhancements, which are being reviewed for implementation.

As specified in Item C.1, the evaluation results are available* to the NRC for review during an inspection.

  • If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.

Sincerely,

,~7(J_.--;(

Gerald T. Bischof . u Senior Vice President Nuclear Operations & Fleet Performance Dominion Energy Nuclear Connecticut, Inc.

Commitments made in this letter: None

Serial No. 17-465E Docket Nos. 50-336/423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector Millstone Power Station