Forwards Revised Draft Orders & Safety Evaluations Re Facility Operation.Orders Will Not Be Issued Until All Supports Are Evaluated
ML18130A587
Person / Time
Site: Surry, FitzPatrick  Dominion icon.png
Issue date: 08/09/1979
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Ahearne J, Bradford P
NRC COMMISSION (OCM)
Shared Package
ML18130A589 List:
References
NUDOCS 7909190040
Download: ML18130A587 (2)


Text

DISTRIBUTION:

1-1. R. Denton E. G. Case R. Mattson R. Russel 1 D.

  • Eisen hut i,J. Russell

. MEMORANDUM. FOR:

FROM:

SUBjECT:

Commissioner Bradford Commissioner Ahearne AUG Darrell G. Eisenhut, Acting Director Division of Operating Reactors*

9 1979 By memornndum dated August 6, 1979, NRR forwarded a draft-order and safety

. evaluation relating to resumption* of operation of Surry Unit 1:. By memorandum dated August 8 ~ l 979 ~ NRR al so forwarded a* draft order and..

safety ev_aluation relating to resumption of operation of Fitzpatr,ck.

I.

.The. revision to these orders simplify them to say the 11 job is done 11 The prev*ious drafts referred to a small number of supports that require additional evaluation prior to startup.

  • Since we are not issuing the Orders until i_

. this work is.completed (within the next couple of days)~ the Orders are

  • ---- modified to reflect this situation.

)

Enclosed-for your consideration are copies of the. following documents: (a) revised draft order far Surry 1, (b) revised draft safety evaluation for

  • surry 1, (c} revised draft order for.Fitzpatrick and (d) revised dra'ft safety evaluation for Fitzpatrick.

cc:

Chairman Hendrie Commissioner Gilinsky Commissioner Kennedy L. V. Gossi ck SECY OPE OGC OFFICE~

SURNAME~

DATE~

..Original Signed By:

~11 G. Eisanhut Darrell G. E1senhut5 Acting Director Division of Operating Reactors

.... NRC FORM 318 (9-76) :t-rn.CM 0240

MEMORANDUM FOR:

FROM:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Commissioner Bradford Commissioner Ahearne Darrell G. Eisenhut, Acting Director Division of Operating Reictors AUG 9 1979

SUBJECT:

REVISION TO DRAFT ORDERS AND SAFETY EVALUATIONS RELATING TO FITZPATRICK AND SURRY UNIT 1 OPERATION By memorandum dated August 6, 1979, NRR for~arded a draft order and safety evaluation relating to resumption of operation of Surry Unit 1.

By-memorandum dated August 8, 1979, NRR also forwarded a draft order and safety evaluation relating to resumption of operation of Fitzpatrick.

  • The revision to these orders simplify them to say the "job is done 11 The previous drafts referred to a small number of supports that require additional evaluation prior to startup. Since_we are not issuing the Orders until this work is completed. (within the next couple of days), the Orders are modified to reflect this situation.

Enclosed for your consideration are copies of the following documents: (a) revised draft order for Surry l, (b) revised draft safety evaluation for Surry 1, (c).revised draft order for Fitzpatrick and (d) revised draft safety evaluation for Fitzpatrick.

cc:

Chairman Hendrie Commissioner Gilinsky Commissioner Kennedy L. V. Gossick SECY OPE OGC