ML18129A230

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure. Includes EPIP 5.7.19, Revision 15, On-Site Radiological Monitoring
ML18129A230
Person / Time
Site: Cooper 
(DPR-046)
Issue date: 05/02/2018
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2018022
Download: ML18129A230 (1)


Text

Nebraska Public Power District NLS2018022 May 2, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q)

The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.19, On-Site Radiological Monitoring (Revision 15), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.

This letter contains no commitments. If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

. s;el~

~Y.~

{/

~:ensing Manager

/bk

Attachment:

Report of Change and Summary of 50.54( q) Analysis Emergency Plan Implementing Procedure 5. 7.19, Revision 15

Enclosure:

Emergency Plan Implementing Procedure 5.7.19, Revision 15 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region N Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

Nebraska Public Power District NLS2018022 May 2, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, License No. DPR-46

Dear Sir or Madam:

50.54(q)

The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.19, On-Site Radiological Monitoring (Revision 15), and provide a summary of the associated 10 CFR 50.54(q) analysis for the change to the EPIP.

This letter contains no commitments. If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

. s;el~

~Y.~

{/

~:ensing Manager

/bk

Attachment:

Report of Change and Summary of 50.54( q) Analysis Emergency Plan Implementing Procedure 5. 7.19, Revision 15

Enclosure:

Emergency Plan Implementing Procedure 5.7.19, Revision 15 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region N Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com