Independent Spent Fuel Storage Installation Annual Radiological Environmental Operating Report for 2017
ML18128A263
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/25/2018
From: Lane N
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18128A283 List:
References
18-170
Download: ML18128A263 (2)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 25, 2018, United States Nuclear Regulatory Commission Serial No.18-170 Attention: Document Control Desk NAPS/DPM Washington, D. C. 20555 Docket Nos. 50-338/339 72-16 72-56 License Nos. NPF-4/7 SNM-2507 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT In accordance with North Anna Units 1 and 2 Technical Specification 5.6.2 and the North Anna Independent Spent Fuel Storage Installation Technical Specification 5.5.2, enclosed is the 2017 Annual Radiological Environmental Operating Report. The Radiological Environmental Operating Report provides the details associated with the Radiological Environmental Monitoring Program.

  • If you have any questio,ns or require additional information, please contact Mr. Donald R. Taylor at (540) 894-2100.

Very truly yours, l??rµ_*

N. Larry Lane Site Vice President Enclosure Commitments made in this letter: None

§-cz5 Ntv1~s2-(p

,Jf<_/L .

µtv1-5S

Serial No.18-170 NAPS Annual Radiological Environmental Operating Report cc: U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission I Washington, D. C. 20555 NRG Senior Resident Inspector North Anna Power Station