ML18127B505
| ML18127B505 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/26/2001 |
| From: | Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 8770-G-078, Rev 11 | |
| Download: ML18127B505 (1) | |
Text
8770-G-078 SH 111C OIL LIFT PUMP CONTROLS SS
>>72 UPPER GUIDE BEARING CD I
CD O
CD NO DATE 1 0 8/25/97 REVISIONS BY DESCRIPTION JCG CH CM DB APPROVED SHM UPPER OIL RESERVOIR COOLER
>>76 O
O Ct\\
~CR 0:
REDRAWN WAA GIAN BCRRDOOIO REV (85 C5)
>>76 D
~TO RCP CONTROLS LJ J
FLYWHEEL STATOR TEMPERATURE 1-RC-671 I/2-RC-644 2
Q V1278 PS
>>75 V1321 Pl
>>74 EXCESS FLOW LINE HS P-IBI CD V1458 PS
>>78 PS
>>77 MOTOR AIR COOLER MOTOR AIR COOLER MOTOR WINDING TE
>>75 CtO O
PV C/I DC CD O CD CD 3-RC-657 1/2-RC-644 V1329 UPPER OIL RESERVOIR LT LIA H
>>ze
- 3)
>>Te PS
>>76 OIL LIFT PUMP A
FS "0--XE-VIBRATION SWITCH So SZ O'C ~sz-OI-ec 1-RC-672 TO OIL COLLECTION TANK 8770-0-091 SH I OC D3 1-Rc-665 V01004 I/2-RC-840 V1325 LT LIA H
>>77
)j 1>>7
~A LOWER OIL RESERVOIR OO EX:,a c5 2
g Ch P
C3 I Oe V1274 OIL LIFT PUMP B
O O 0
LOWER BEARING OIL COOLER A
NEH vs o
vLsoe I
o THRUST BEARING AND RUNNER KHM V1342 KHN V1354
)F034N I
o 77))77LOWERGUIDEBEARING
>>78
))
1>>S
~A UPPER SHOES LOWER BEARING OIL COOLER B
>>79
))>>79 LOWER SHOES II75 1177 SO 2
H 8
D FROM CCW SUPPLY 8770-G-083 SH 18 CC C6 D
To CCW RETURN 8770-G-083 SH 18 CC 86 FROM CHARGING PUMPS 8770-G-078 SH 1208 CH D5 FL 1-3/4-CH-812 Ictus BA Vl I
I V1390 PT
>>72 V1286 1-3/4-RC-227 VI386 1-3/4-RC-662 VO>>06 Vo>>07 Vo>>08 3/4-RC-600 V1290
/V 1-3/4-RC-255 50-01 7 1-3/4-RC-182 I
A 8
LOWER SEAL CAVITY MIDDLE SEAL CAVIIY LOWER SEAL VAPOR SEAL DRAIN CAVIIY LOW PRESSURE VAPOR SEAL CONTROLLED BLEEDOFF CAVITY UPPER SEAL UPPER SEAL CAVITY MIDDLE SEAL
>>74 TE
>>74 I
8 10 Vl I
A 1-3/4-RC-176 1-3/4-RC-186 V1282 CL V
O C
I 50-01-3 PIA
//
>>73 I-I-RC-259 1-3/4-RC-235 1-3/4-RC-251 PT
>>73 FIA H
>>70 y
L
~ Eb-
)
FIT
>>70 1-3/4-RC-190 I
r I
FE V1334 J
FE->>70 1-3/4-RC-235 V1382 PT yq PI
>>71
'7)>>71 V1338 PI
>>70 I
8 TO V2302 8 VCT 8770-G-078 SH 121A U1362 CH Cl CONTROLLED BLEEDOFF I
8 REFERENCE DRAWINGS
- PIPE, VALTIE 8 IAISTRUMENT SYMBOLS VALVE LIST LINE lTST VALVE OPERATIONAL NUhlBER INDEX INSTRUMENT INSTALlATION DETAILS INSTRUMENT LIST REACTOR COOM!NT PUMP OUTLINE 8770-G-078 SH 100 8770-A-051 8770-8-052 8770-8-053 8770-8-231 8770-8-2700 8770-15 CC 03 2
TO CCW RETURN 8770-G-083 SH 18 CC 87 FROM CCW SUPPLY 8770-0-083 SH 18 CC 07 LOWER SEAL HEAT EXCHANGER D
I I/2 I I/2 D
TO REACTOR 8770-G-078 SH >>08 RC C7 I
A I-30-RC-121 PUMP COVER HEAT BARRIER I
A C
CD DR 3/4-RC-166 V1378
>>7O GASKET LEAKAGE NOTES 1.
ONE OF SIX STATOR TEMPERATURE ELEMENTS CHOSEN DURING PUMP TEST WILL BE MONITORED.
2.
LOCAL PRESSURE TAPS ARE SUPPLIED IN THE PUMP SUCTION AND DISCHARGE FOR PUMP CALIBRATION.
3.
LINES WITHOUT NUMBERS ARE PART OF THE PUMP MOTOR PACKAGE OR INSTRUMENT PACKAGES.
NOTE:
THIS DRAWING IS MADE FROM REV.
9 PF DRAWING 8770-0-078 SH>>1 I
A REVISION OF THIS DRAWING MAY REQUIRE UPDATE OF THE FOLLOWING DOCUMENT:
FSAR FIGURE 5.5-7 I-30-RC-121 I
A FROM STEAM GEN 18 8770-G-078 SH >>08 RC 07 NUCLEAR SAFETY RELATED IN PART ONLY FLORIDA POWER
& LIGHT COMPANY ST LUCIE PLANT 1976 890 MWe INSTALLATION UNIT I FLOW DIAGRAM REACTOR COOLANT PUMP 181 FLORIDA POWER
& LIGHT COMPANY SCALE:
NONE DNI MECH DR J
CIPE CH P
BERGERON APPROVAL DATE:
8770-G-078 SHEET 11 USM00248.0W0