ML18121A296

From kanterella
Jump to navigation Jump to search
Submittal of 2017 Annual Radiological Environmental Operating Report
ML18121A296
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 05/01/2018
From: Geyer J
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18121A295 List:
References
ULNRC-04631
Download: ML18121A296 (3)


Text

Amerell MISSOURI CaIIaa PLmt May 1.2018 ULNRC-0463 I U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington. DC 20555-0001 40 CFR 190 10 CFR 72.44(d)(2)

Ladies and Gentlemen:

DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 2017 ANNtJAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Please find enclosed the 2017 Annual Radiological Environmental Operating Report for the Caltaway Plant (Callaway Energy Center). This report is submitted in accordance with Section 5.6.2 of the Callaway Plant Technical Specifications and Appendix B to the Callawav Plant Operating License.

The report concerns the environmental monitoring program established for the Callaway Energy Center. which also pertains to the independent spent fuel storage facility at the plant consistent with Section 5.1.b of Appendix A to the HI-STORM UMAX Certificate of Compliance.

This letter does not contain new commitments.

If there are any questions, please contact Johann S. Geyer at (314) 225-1589.

ceiy J hann S. Geyer Director, Radiation Protection JPK/

E nd osure P.O. Box 620 Pulton, MO 65251 AmerenMissouri.com

ULNRC-0643 I May 1,201$

Page 2 of3 cc:

Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Director Division of Spent Fuel Management Office of Nuc lear Material Safety and SafeLuards U. S. Nuclear Regulatory Commission Washington. DC 20555-0001 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman. MO 65077 Mr. L. John Klos Project Manager. Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 081-14 Washington. DC 20555-0001

ULNRC-0643 I May 1,2018 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place. Suite 1050 Fort Worth. IX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be macic via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. IIerrmann B. L. Cox R. C. Wink J. S. Geyer T. B. Elwood C. C. Graham G. P. Gary Corporate Communications NSRB Secretary Mrs. Collette Linder. REP Manager (SEMA)

STARS Regulatory Affairs Mr..Jay Silherg (Pillsbury Winthrop Shaw Pittman LLP)

Mr. Chris Wieberg (DNR)

Mr. Steve Feeler (DNR)

Mr. Dnt Buntin (DNR)