ML18116A467

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16
ML18116A467
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/23/2018
From: Pat Navin
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML18116A467 (6)


Text

_.,,

SAFEGUARDS INFORMATION

Exelon Generation~)

April 23, 2018 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Peach Bottom Atomic Power Station, Units 1, 2 and 3 Facility Operating License Nos. DPR-12, DPR-44 and DPR 56 NRC Docket Nos. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision*16 to the Peach Bottom Atomic Power Station (PBAPS) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (Security Plan). The changes to the PBAPS Security Plan was implemented on March 9, 2018. In accordance with 10 CFR 50.54(p)(2), EGC is submitting this change within 60 days of implementation (i.e., no later than May 8, 2018).

The PBAPS Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program have been revised:

1. In section 9 of the PSP (refer to Attachment 2)
2. Section 11.2.1 of the PSP (refer to Attachment 2) 3.. Section 11.2.2 of the PSP (refer to Attachment 2)
4. Section 14.4.1 of the PSP (refer to Attachment 2)
5. Section 3.6.3.(1) of the PSP Appendix B (refer to Attachment 2)
6. Section 3.6.3.(5) of the PSP Appendix B (refer to Attachment 2)
7. Section 3.6.3.(10) of the PSP Appendix B (refer to Attachment 2)
8. Section 3.6.4 Bullet 1 and 2 of the PSP Appendix B (refer to Attachment 2)
9. Section 3.6.4.1 Bullet 1 of the PSP Appendix B (refer to Attachment 2)
10. Critical Task #25 of the PSP Appendix B (refer to Attachment 2) 11: Critical Task #26 of the PSP Appendix B (refer to Attachment 2)
12. Section 4.1.2 of the PSP Appendix C (refer to Attachment 2)
13. Section 7 of the PSP Appendix C (refer to Attachment 2)
14. Section 2 of the PSP Appendix D (refer to Attachment 2)
  • SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS D.ECONTROLLED 3 f)D I
Jtv15SZ/,o
ii~~.
iJM~s

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission March 27, 2018 Page2 EGC has concluded that the changes do not decrease the safeguards effectiveness of the PBAPS Security Plan, Training and Qualification Plan; and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program. and Attachment 2 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390,*"Public inspections, exemptions, requests for withholding," paragraph (a)(1 )(i), and 1 O CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1)(i).

If you have any questions or require additional information, please contact Shelly Griffith at 717-456-3025.

Patrick D. Navin Site Vice President*

Peach Bottom Atomic Power Station Exelon Generation Company, LLC

  • Attachments: 1. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 including Figures 1, 2, 3, and 4 (Contains Safeguards Information)
2. SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change Submittals (Contains Safeguards Information)
3.
  • Supplemental Letter of Support Information cc:

Regional Administrator - NRC Region I w/attachments CCN:

  • 18-06.

SAFEGUARDS INFORMATION ATTACHMENT 1 and ATTACHMENT 2 CONTAIN.SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission March 27, 2018 Page 3 bee:

Sr. Vice President, Mid-Atlantic Operations Sr. Vice President, Operations Support Vice President, Engineering

  • Site Vice President, PBAPS Plant Manager, PBAPS Director, Operations, PBAPS Director, Security.

Manager, Site Security, PBAPS Director, Site Training, PBAPS Manager, Regulatory Assurance, PBAPS Manager, Licensing - KSA3-E Commitment Coordinator - PBAPS Records Ma~agement - PBAPS SAFEGUARDS INFORMATION w/o attachments ATTACHMENT 1 and ATTACHMENT 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 1 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16 (Includes Figures 1, 2, 3, and 4)

SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 2 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 SY-AA-101-104-F-03, Table of Changes for Site Security Plan Change Submittals SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 3 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Docket No. 50-171, 50-277, 50-278 and 72-29 Supplemental Letter of Support Information For:

Peach Bottom Atomic Power Station Physical Security Plan, Revision 16 SAFEGUARDS INFORMATION ATTACHMENT3 UPON SEPARATION THIS PAGE IS DECONTROLLED