Responds to Expressing Concern Re Adequacy of Supply of Electric Power in Light of Unavailability of Plants.Reanalysis & Investigation of Both Stations Necessary to Assure Health & Safety of Public
ML18116A375
Person / Time
Site: Surry, North Anna  
Issue date: 07/24/1979
From: Gossick L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Edmunds J
VIRGINIA, COMMONWEALTH OF
Shared Package
ML18116A376 List:
References
NUDOCS 7908170488
Download: ML18116A375 (3)


Text

-

The Honorable James r. Edmunds Commonwealth of Virginia Senate Richmond, Virginia 232i9

Dear Mr. Edmunds:

This letter is in response to your letter of June 13, 1979 to the Chairman of the Nuclear Regulatory Commission.

In that letter you expressed concern regarding the adequacy of the supply of electric power to the customers of the Virginia and Electric Power Company (VEPCO) in light of the.current unavailability of both the.Surry Power Stat i off, 1Unit 1 and the North Anna Power Station; Unit 2 *. I share your concern in this regard.

With respect to the reanalys*is of the s~ismic stress levels at the Surry, Pm<Jer Station, Unit 1, VEPCO advised us* by letter dated June 27, 1979,, a copy of which is enclosed, that additional facility modifications are required to correct pipe overstress conditions whicb would occur during a postulated design basis earthquake. rhese _modifications vJere attributed to differences between the original design requirements and the field verified 11 as built 11 *co*nditfons.

VEPCO's earlier estimates that significant modifica-tions would not be required based upon the results of early analyses are no longer valid; VtPCO will be required to complete all piping reanalyses within the plant and all pipe support reanalyses within containment prior to startup.

Also, a11 modifications identified at that time will be*

made prior to returning the Surry unit to pov1er.

VEPCO has estimat.ed that these actions will be completed sometime in.August.

The NRG staff re.mains available for prompt review of the VEPCO submittals regarding thes~ re-analyses and modi fi cat i ans*.

The Surry unit wi 11 be permitted to return to pov1er following our satisfactory review of these submittals. * *

  • With regard to the North Anna Power Station, Un.it 2, the NRC staff is, as you know,,currently conducting a thorough investigation of the March 28, 1979 incident at the Three Mile Island Power Plant, Unit 2.

This investigation includes studies of the potential design deficiencies in the plant, operat9r respons~ to the accident including operator errors and/or misinterpretation of plant instrumentation and all other aspects of the accident ~hich might lead to inforniation that vmuld improve the safety of nuclear pm,,er plants.

The results of these inve!itigations will also be applied to plants that are_ H2-'

19081~1o~St ccp

. I

  • r

.. l t

l 1 *. _*..

OF'l"IC~;,..

\\

~

... ~... _......................... ~

....................... C.......................... ~.................... *+**:........................... +*':*:******

DATE>

............................................,...............................,....................... ~***"......,.................

i : L

The Honorable James current.ly under construction and for which operating licenses have been applied for but not yet issued such as the North Anna Power Station*,

Unit 2.

Any new safety requirements arising from these investigations will be evaluated to determine vthether they are applicable to the North Anna Power Station. Uni~ 2 and will be applied to Unit 2 accordingly.

~Je recognize that these investigations will delay the*_ issuance* of an operating license for Unit 2 and that a hardship will be placed on VEPCO and its customers.. However; we are proceeding on the basis that primary consi.deration should be given to the public 1 s health and safety and that our investigation of the Three Mile Island incident should progress to the point where the implications regarding that incident c6uld be assessed to

  • determine the impact,_ if any_. on the North Anna Power Station, Unit 2.

I trust this letter,has been responsiv~ to your concerns.

Sincerely, ORIGINAL SIGNED BY R._ G. SMITH lee,V. Gossick Executive Director' for Operations Enclosure VEPCO Letter of 6/27/79

  • DI STR IBUTI ON Docket Files NRC PDR LPDR Ryan Stello JCook
  • HRDenton EGCase DVassalo Muller Schroeder Eisenhut PFine DMCrutchfield NRR R/F EDO R/F PSS R/F SECY 79-1811 (3)

GErtter(ED0-6611)

MGroff(ED0-6611)

I'

\\

.. \\

\\

Ol"l"ICG~.~.~-~.:?.~~""""*'.~.~-~.:?.~~""""*'.. ~.~'~"'"""""""' ~~~.=...,",......... -~~~,.~!.~.. ""'"'.. ~~-\\... ~

IIUftNAMK~.~.rn.i.ehru.;piib.... D.~1C.r.1.1.t.c:.b.f.i.e.l.d. ~Cunnfoghat'l.. ::.... Eq~~............ HRQ~to.u..

  • L vfo=s-; i ck DATE~ 1/..12/./.9............7./.1.2/.7.9............. 7./.J.6/.7.9........... ?. !..~!.?.?..............?/. '.'.!.?.?..... :::::: 'ii~//rj""'"

NK POaK 318 (9-76) NRCM: 02-0 U,11. GQV.RNMIIIENT PRINTING OP'P'ICK: I D78 - ZIB * ; **

  • \\
  • ~*--*-.t*.::..._,,_.._
~*

The Honorable James currently under construction and for which operating-licen~es have been**

applied for but not yet issued such as.the 'North Anna Power Station, Unit 2.

Any ne\\ti safety requirements arising. from these investigations-will be evaluated to.determine whether they are applicable to the North Anna Power

  • Station, Unit 2 and will be applied to Unit 2 accordingly.

He recognize that these investigations~will delay the issu*anceJ.of an,

  • operating license for Unif 2.and that a hardship will be plaq.=?11 on VEPCO and its.customers *. However, we are proceeding on the basis that primary -

consideration shoul-q be given to the public's health and safety*.and that our investigation of the Three Mile Island inciderit should prbgr~ss to the point where the implications regarding that incident could be assessed to detenni ne the.impact, if any~ on the North Anna Pm-.ier Station) Unit 2.-

I trust this letter has been responsive to your concerns.

Si n;cerely,

Enclosure:

VEPCO Letter of 6/27/79.

DISTRIBUTION

. Docket Fi 1 es

  • NRC P'DR*

LPDR Ryan Stello JCook HRDenton EGCase DVassalo Muller

  • Schroeder Eisenhut Pfi ne DMCrutchfield NRR R/~,

EDO R/F PSS. R/F SECY 79-1811 (3)

GErtter(ED0-6611)

MGroff(EDQ-6611)

  • \\

I l

I fll OP'ir1c**'.*:rm?!}{****..,.~~~........ : '.. X~R.r;..: ~:..... 1

.. NRR.=.RP.rn.......... NR~.=.P.rn.......... '**::~~Q...... :.;..,

CURNAMII. P.f.R.... h... =.RAP...... mw....J.c::.b.f.1.~.1.. *.. f.1.(1tnnm?if.. J.(K9.S.~............... HRUanto.n....,..... ~V.G.9.s.s.i.c.lL..

7..

79 -

7 79

  • 7 -

79 DA'l"I:~

    • /./.~...... * * *...... *
  • ..
  • l. ~-*.....................!),ti...............Z/...../. Z9......... ';..... 71.... 1.7..~.......... 7:{... /.,.?.~.........
  • u.s. GQVl!CRNMEN'i' E9RINTING Ofll'P"IC!!': 1171
  • IGD
  • 711