ML18116A299

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-13.Supplements Earlier Repts W/Listing of 12 Welds Having Rejectable Indications.Repair Work in Progress
ML18116A299
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/24/1979
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7908090489
Download: ML18116A299 (2)


Text

L e

  • I Vepco VIRGINIA ELECTRIC AND POWER COMPANY Surry Power Station

,J

\\.J u A/0 : tJ D Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

I.E. Bulletin No. 79-13

Dear Sir:

P. O. Box 315 Surry, Virginia 23883 July 24, 1979 Docket No:

50-280 In accordance with the provisions of IE Bulletin 79-13, VEPCO supplements our earlier reports for Surry Power Station with the following:

As of this date, the following welds have rejectable indications:

"A" S.G.

14-WFPD-17-601 Wf/3 Small area of rejectable porosity, (reported to NRC 07-16-79).

Wi/4 Wt/5 Wf/13 IIBII S. G.

WIil Wf/10 "C" S.G.

W//5 Wf/6 W/111 W//9 Two small linear indications in the root area, (reported to NRC 07-16-79).

Small area, lack of fusion - reject (reported 07-23-79).

Small areas of rejectable incomplete fusion (reported to NRC 07-12-79).

14-WFPD-13-601 Small area of rejectable porosity, (reported to NRC 07-12-79).

Small area of slag/incomplete fusion - reject

~)~

14-WFPD-9-601

~

Small area of rejectable porosity, (reported to NRC 07-16-79).

Small area of rejectable incomplete fusion, (reported to NRC 07-16-79).

Small area of rejectable incomplete fusion, (reported to NRC 07-16-79).

Small area of rejectable incomplete fusion, (reported to NRC 7-23-79).

1qo433 U.L,'i1CIAL coh.

"C" S.G.

Wl/13 Wl/14 2 -

'July 24, 1979 14-WFPD-9-601 (Continued)

Small area of slag - reject (reported 07-23-79).

Small areas of slag/incorrect fusion - reject (reported 0"!-23-79).

This completes the R. T. of all feedwater lines in /fl Containment.

Repair work is in progresso The total number of rejectable welds is 12.

W. L. Stewart Station Manager