ML18114A692

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-01.Forwards Failure of Solenoid Operated Valves to Meet IE Bulletin 79-01 Environ Qualification Requirements.
ML18114A692
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 06/14/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Stello V
Office of Nuclear Reactor Regulation
Shared Package
ML18114A693 List:
References
NUDOCS 7906180536
Download: ML18114A692 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGINIA 23261 June 14, 1979 Mr. Victor Stello, Jr., Director Serial No. 466 Division of Operating Reactors PO/FHT:baw Office of Nuclear Reactor Regulation Docket No. 50-280 U. S. Nuclear Regulatory Commission 50-281 Washington, D. C. 20555 50-338 50-339 License No. DPR-32 DPR-37 NPF-4 CPPR-78

Dear Mr. Stello:

FAILURE OF SOLENOID OPERATED VALVES TO MEET IE BULLETIN 79-01 ENVIRONMENTAL QUALIFICATION REQUIREMENTS Pursuant to the reporting requirements of I.E. Bulletin 79-01, Environmental Qualification of Class IE Equipment, dated February 8, 1979, Virginia Electric and Power Company hereby forwards the attached report detailing the failure of several solenoid operated valves to meet environmental qualification require-ments.

Twenty-four hour and fourteen day reports were submitted in compliance with the Bulletin, however, they were inadvertently forwarded to Region II. The attached report is intended to supplement the four previous transmittals listed below.

Report type Docket No(s). Serial No Date 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> telecopy 50-338 5-7-79 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> telecopy 50-280, 50-281 5-10-79 LER-79-065/0lT-O 50-338 389 5-21-79 LER-79-018/0lT-O 50-280, 50-281 398 5-23-79 If you have any questions, or require additional information, please contact this office. 1/dd:

Very truly yours, T,4 /GOO

""' 14oSys/R.oJ

/J J/ I !Li l-V~L lVt.u:,i ~

e. . ~... Y.Sr

~ eae- Sf-fy (3.,,,.

C. M. Stallinik ~

Vice President-Power Supply PLt:11r111 S'y S' a"'

and Production Operations £Et! .,,,,:I

~ ~ ~ "' l\""'-CII. "\.

cc: James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement-Region II 7 906180 5'3/.p

~~ ,f,