ML18114A689
Jump to navigation
Jump to search
| ML18114A689 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 06/13/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Hartfield R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML18114A690 | List: |
| References | |
| NUDOCS 7906180517 | |
| Download: ML18114A689 (1) | |
Text
..
- r VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VI:RGINIA 23261 June 13, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Hartfield:
Serial No
- 4 79 PO/FHT:scj Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of May, 1979.
Enclosure (3 copies)
Very truly yours,
/1) { tf)~ fr' C. M. StallYJ..ngs Vice President-Power Supply and Production Operations cc:
Mr. John G. Davis, Acting Director (10 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)
Office of Inspection and Enforcement - Region II