ML18114A539
| ML18114A539 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/04/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| 253, NUDOCS 7905080538 | |
| Download: ML18114A539 (2) | |
Text
VIRGINIA ELECTRIC.A.ND POWER COMPANY RIOHMOND,VIROINIA 23261 May 4, 1979 Mr. Harold R. Denton~ Director Office of-Nuclear Reactor Regulation Attn:
Mro Albert Schwencer*, Chief Operating React6rs Branch No. l Divisi6n of React6r Litensing
- U._S. Nuclear Regulatory Commission Washi_ngton, DC 10555
Dear Mr. Denton:
Serial No. 2 53
- LQA/RMN:esh Docket Nos *. 50~280 50-281 License Nos. DPR-32 DPR-37
- AMENDMENT~TO OPERATING.LICENSE SURRY:POWER STATION:LJNIT.NOs;*1 AND,2 PROPOSED TECHNICAL. SPECIFICATION CHANGE* NO~* 71
- "ADDITIONAL* INFORMATION Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requested, by letter dated August 31, 197g, Serial No. 500, an amendment in the form of changes to the Technical Specifications to Operating License Nos. DPR-32 and DPR-37 for Surry Power.Station, Unit Nos~ 1 arid :2.
The pro-posed changes, designated as Change No. 71, were to reflect a reorganization of the Production ~perations De~artment onsite and offsite and to incorporate severa 1 minor changes and corrections. Enclosed is additional information on this change.
- The August 31, 1978, submittal included a revised Figure:6~1-1, the Power organiza*tional chart. There has been a management reorganization since then which is reflected in the attached revised ~igure:6~1~1.
The reorganiza-tion is des_igned to increase efficiency and therefore enhance safety.
- This proposed change has been reviewed and approved by the Station Nuclear Safety and Operatin*g Committee, and the System Nuclear Safety and Operating Committ~e.
It has been determined that this request does not involve an unreview.ed safety question, as defined in 10 CFR ~0.~9.
Very truly yours, IJJ_{/)d"". fr/
- C. M. StaHi#gs Vice President-Power Supply and Production Operations
Attachment:
Proposed Technical Specification cc:
Mr. James:P. 01Reilly, Directbr Office of Inspection and Enforcement R_egion II
.e e
(
I re* *., ~*rrr:r 4
. r,r:,,:11,nr,11 l)r,,.n110111t i
I I
I l ~. l,,o,,
I
~-------..;
- an:11*,*r I' t ~1d ~,,: t J 1111 Opt* r;1t l 011*,
- D1rrc1o, X*C1flll Qp("rllf')(\\I VIRGINIA ELECTRIC AND POWER COMPALTI ORGANIZATION CHART
- POWER Ol'BRATIONS Scn'i.o:r Vi*:c Prcr,:1.dcnt l'-iwcr Opcr:it:i.on; Exccut:lvc~ }1.:mog,cr EnvlronPU.!llt3J.
Services H:m.:,p,t~1-*
Po\\.J'*:.r ScrvicC".s
& l\\udsctins Director
!\\ucl("a1* l.lcl~n*; in~~
-:: Responsible for Corporate Fire Protection Program
.1 M:J1,nf.l'l" Fm*l )i.,.,~outrc:l I
Dlrte"lor QuDIHJ'. A3.'IIUMC~
/:11,,u~rf' N11d".1.1 Ftttl